Water Integrity Forum, Delft June 5th 2013 Community Managed Project (CMP) approach: an opportunity to foster integrity in rural WaSH Experience from Ethiopia.

Slides:



Advertisements
Similar presentations
INDEPENDENT WATER SCHEMES IN SAMOA
Advertisements

SOCIAL PROTECTION GROUP Responses to the questions.
Community Managed Project approach: an opportunity to improve the ownership in fluoride mitigation in Ethiopia Arto Suominen CTA/COWASH/MoWE/Ramboll GeoGen.
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Service Provider.
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Financial support for integrated rural development in the Nitra Self-governing Region Office of the Nitra Self-governing region Department of strategic.
IMPLEMENTING FINANCIAL AND ACCOUNTING SYSTEMS FOR GOVERNMENT CHRISTIAN T. SOTTIE THE CONTROLLER AND ACCOUNTANT-GENERAL GHANA.
IRC International Water and Sanitation Centre 31 May 2013 Monitoring for Learning and developing Capacities in WASH 1.
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
1 programme Management structure 2 Finn WASH-BG Programme fund 3 Fund request 4 Fund flow channels 5 Fund management 6 Bank accounts 7 Financial reports.
Water for a food-secure world IFAD agricultural water management investments in “challenging contexts”: IFAD context, commonalities across countries, &
Fostering the Adoption and Adaptation of Innovative Solutions for Water Challenges 5 th Delft Symposium on Water Sector Capacity Development 31 May 2013.
Hydropower Development: Experience of Nepal
Local Government Development Program and Poverty Reduction in Uganda: Lessons from Aid Policies Shuaib Lwasa Department of Geography Makerere University.
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
Second Sudan Consortium March 2007 Water Supply and Sanitation Service Delivery and Challenges in Southern Sudan Ministry of Cooperatives and Rural Development.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
“WATER COMMON GOOD FOR ALL” 15th – 16th NOVEMBER 2011, Ouagadougou – Burkina Faso Presented by Eng. Deus Mchele District water Engineer Bahi District Council.
Irrigation and Water Supply sector By Nicolas Rivière LRRD Project.
MINISTRY OF WATER AND IRRIGATION REVIEW OF FINANCIAL FLOWS TO WATER SECTOR BY ENG. P. MANGITI DIRECTOR LAND RECLAMATION/HEAD DONOR COORDINATION UNIT.
Directorate of e-Government1 e- Government Strategy for Kenya. By Peter Gakunu, Cabinet Office 23 rd March 2004.
PRESENTATION ON THE REVIEW OF THE PROJECT CYCLE BY R.K.D. Van-ESS Date: 27 th September, 2011 Venue: Erata Hotel.
Water Services Trust Fund Social Animators & Field Monitors Training Workshop The Water Services Trust Fund: Functions, Mandate, Urban Window, WSTF Support,
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
Community Managed Project approach Arto Suominen CTA/COWASH/MoWE/Ramboll.
Ethiopia Promoting Basic Services Social Accountability Program
Presentation Somathilaka Kindelpitiya Community Development Specialist 21 st July, 2012.
National Conference on “Water and Sanitation for All in Madhya Pradesh: Opportunities and Challenges” Bhopal, Madhya Pradesh 23rd September, 2010 At :
The implemented reforms and progress on developing a strategy for the WSS sector in Armenia The implemented reforms and progress on developing a strategy.
A Review of the Standing Committee of Caribbean Statisticians (SCCS) as a Mechanism for Statistical Development and Harmonisation The Second Meeting of.
Media Projects Marija Gaćeša and Violeta Ćorić Belgrade, 1 st October Ministry of Finance.
Usafi wa Mazingira Tanzania (UMATA) Country Programme Proposal Thursday 19th April 2012 Dr Khalid Massa - Ministry of Health and Social Welfare, Government.
1 Rights based rural development in practice 6 years of experience Chia sẻ Vietnam - Sweden.
UNDP efforts towards microfinance development in Uzbekistan 9-11 November 2005 Almaty, Kazakhstan BUILDING SUSTAINABLE MICROFINANCE IN RBEC Community of.
Yemaneberhan Taddesse.  PASDEP(plan of accelerated and sustainable development for the Eradication of poverty) Poverty reduction strategy is the main.
AMC Governance and Institutional Support. Objectives Build on existing capacity Ensure appropriate independence and credibility through transparency,
Water Supply and Sanitation in Sub-Saharan Africa Activities, Strategies and Lessons Learned of German Development Cooperation.
Dafili Gravity Water Supply Scheme Finn WASH-BG Programme.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Highlights ( ) PEAG Meeting, Suva, Fiji November, 2015.
1 Consolidated Municipal Infrastructure (CMIP) and Municipal Infrastructure Grant (MIG) DPLG PRESENTATION TO THE PORTFOLIO COMMITTEE ON LOCAL GOVERNMENT.
EuropeAid EU/ACP Microfinance Programme II. EuropeAid  Overview of the EU cooperation in ACP countries  EU/ACP Microfinance Programme presentation 
Towards a Sector Wide Approach (SWAp) for water sector in Lesotho Prepared by T.W. Sepamo Principal Engineer Water and Sanitation. Prepared for EUWI –
WASH Sustainability checks in Ethiopia Marieke Adank (IRC) and Ryan Schweitzer (AguaConsult) National WASH Multi-Stakeholder Forum 7 Hilton Hotel, December.
PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON PUBLIC WORKS 18 Feb 2004 CAPE TOWN PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON PUBLIC.
Scottish Government Support for Community Energy Chris Morris Local Energy Scotland.
1 Microinsurance as a tool to extend Social protection Strengths and weaknesses Future perspectives Valérie Schmitt Diabaté Aly Cissé ILO / STEP, october.
Treasury of the Republic of Kazakhstan
Roles and Responsibilities of Partners and Stakeholders
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
Zambia - Vision Long term vision Focus for
Sewerage and Sanitation Policies in Indonesia
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
Sanitation and Water for All (SWA) Ministerial Meeting
AQUACULTURE AND FISHERIES SCIENCE (AquaFish) CENTER OF EXCELLENCE
Bangladesh access to sanitation
UGANDA BUREAU OF STATISTICS
MAIN FINDINGS OF NEEDS ASSESSMENT EXERCISE
TRIPARTITE PARTNERSHIP PROJECT
Economic Growth through Effective Road Asset Management (GEM) 16th ARMFA Annual General Assembly - February "PRESERVING.
Transform WASH Public Private Collaboration Sanitation Marketing
The SWA Collaborative Behaviors
Critical Review of the Malawi Community Energy Model
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
progress of the water reform in bulgaria
Principles of Financial Management and Disbursement
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Rural Partnerships between Small Farmers and Private Sector
Seventh Regional Public Procurement Forum, May , 2011
The Role of NEEC in Local Content Implementation
Presentation transcript:

Water Integrity Forum, Delft June 5th 2013 Community Managed Project (CMP) approach: an opportunity to foster integrity in rural WaSH Experience from Ethiopia Linda Annala / COWASH project

Presentation outline Introduction – …to the Ethiopian context – …to the Community Managed Project (CMP) approach – …to the COWASH project Integrity in the CMP approach Financial transparency in the CMP approach Way forward towards sustainable integrity

Introduction… Ethiopian context Ethiopian rural water supply coverage: 48,85% (National WaSH Inventory, 2010) – Growth and Transformation Plan target: 98% by the year 2015 Rural WaSH implementation modalities as per the new WaSH Implementation Framework: – District Managed Project Approach – NGO Managed Projects – Self Supply Projects – Community Managed Project Approach

Introduction… CMP approach There was and still is a great need to increase the ownership of community water supplies – Proposed solution: Delegate the power of financial management and implementation of water supply to the communities Community Managed Project (CMP) approach

Introduction… CMP approach Implementation dependent on communities own initiative (demand-driven approach) Communities are responsible for the planning, implementation and maintenance of water schemes

At least 15% in kind contribution is required and upfront cash contribution to savings account to finance the future O&M activities Water, Sanitation and Hygiene Committees (WASHCOs) manage the investment funds channeled through a financial intermediary, usually a micro-finance institution Introduction… CMP approach

Districts role: from implementer to coordinator, controller, facilitator Capacity building of communities extended to contract and financial management processes Communities receive training and technical & material support from the district, also after the implementation phase CMP harnesses new underutilized capacities i.e. micro- finance institutions, communities and the private sector

Regional Consolidated WaSH Account Micro-Finance Institution WASHCO Artisans District managed project account CMP investment account Finance office Handed over to WASHCO Suppliers Artisans Suppliers

Introduction… CMP approach Approach tested for 9 years in two regions in Ethiopia, now over 8000 water schemes (2,5 million rural users) in 5 regions of Ethiopia Functionality rate close to 98% Last year the CMP approach was included in the National WaSH Implementation Framework (WIF) for its wider application mainly due to its proven efficiency

Introduction… COWASH project COWASH = Community-Led Accelerated WaSH in Ethiopia COWASH is to support the establishment of the Community Managed Project (CMP) approach to accelerate the implementation of universal access to water in Ethiopia The project is based in the Ministry of Water and Energy with Regional Support Units in 4 major regions Project duration May 2011 – June 2016 Bilateral funding, 50% - 50%: – Government of Ethiopia: 23 M EUR; Government of Finland: 22 M EUR

Introduction… COWASH project RegionWater PointsBeneficiaries Amhara2,900772,000 Tigray35686,400 Oromiya635200,000 SNNPR38499,000 TOTAL4,2751,157,400 Implementation costs approximately 18$/capita COWASH targets for the next 3 years:

Integrity in the CMP approach Features enhancing integrity – Decentralization …of procurement: community-level artisan contracting, district level institutionalized pump procurement …of supervision: on-site monitoring by the community – Community ownership WASHCO members selection process creates accountability Transparency through WASHCO reporting Yearly social audits and tariff collections (transparency will increase accountability)

Integrity in the CMP approach Features enhancing integrity – District level supervision & support Social audit with the community at the end of construction Supervision visits influence WASHCOs accountability – Financial transparency Micro-finance institutions provide transparent & timely financial reports WASHCO financial ledger, acknowledgement of receipts, artisan contract agreement etc. formats in use

Integrity in the CMP approach Features challenging integrity – Weak community-level understanding on the costs of construction materials & spare parts – Capacity building limited to WASHCO members, may create mistrust among the users – Post-construction supervision not strong enough – No monitoring on the conduction of community-level social audits nor the balances of the O&M accounts – Possibilities for district officials to collaborate with suppliers with regard to spare part procurement

Financial transparency in CMP The specific controls/safeguards in the CMP approach: – The communities account for receiving instalments is opened and authorised by the district WaSH Team – Disbursements are small (3-4 instalments of less than 600) and each withdrawal is authorised by the District Water Office – Most payments are effected immediately after withdrawal – Instalments require the community to show how funds have been used to date – The unit price for most materials is known by district officials – The quantity to be procured is estimated by a technical person and is standardised – Items are procured by the community water and sanitation committee; not by individuals

Way forward towards sustainable integrity Training for WASHCOs on asset management (including life-cycle costs of WPs) Mechanisms for village-level data collection to be improved – documentation on public audits to be made obligatory

Thank you! Please visit the CMP website for more information