1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

FACET Safety and Procedures Christine Clarke August 29 th 2011.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
The Molecular Diagnostics Research Laboratory University of Malaya Development and Implementation of a Quality System The Molecular Diagnostics Research.
Gulf of Mexico Simultaneous Operations Safe Work Practice
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
LSST Camera Performance and Safety Assurance Plan and Safety Overview Joe Kenny Camera Safety Manager LSST Safety Council Review 18 August 2015.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Kenya Smith (916) (916)
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
User Training at the Advanced Photon Source J.H. Vacca, S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 18, 2009.
Slide 1/5 Safety of Operations Jefferson Lab operates the accelerators in accordance with the Accelerator Safety Order, DOE O 420.2B, guided by DOE G
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Safety Committee Formation
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
LCLS-II ES&H Requirements: Subcontractors
Planning for Succession
Installation Procurement Package
Health and Safety Self Assurance Toolkit 2017
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Accelerator Operations Department Readiness (Part 2)
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Experimental Facilities Planning
Training for New District Test Coordinators
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
LCLS Ultrafast Science Instruments
Meeting of the LCLS Facilities Advisory Committee
Stefan Moeller – XES Manager May 14, 2009
John N. Galayda – Director of LCLS Construction March 30, 2009
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Electron Beam Systems ETC and Methodology
LCLS User Research Administration
Ian Evans SSRL Safety Office
Project Management Issues John N. Galayda, SLAC April 24, 2002
Integrated Safety and Environmental Management
John Arthur – LCLS Experimental Operations
ESS Handbook for Radiation Protection
The Transition to User Operations
LCLS Personnel Protection System and Beam Containment System
Whose Job Is It? Responsibility for Laboratory Safety and Security
Linac Coherent Light Source Transition to Operations 11 July 2007
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project October 2006
Helena Ramsing, Zoe Fisher, Monika Hartl
Safety Program for LCLS Experiments
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
Presentation transcript:

1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments Zoe Van Hoover DRAFT July 09, 2009

2 Zoe Van Hoover 2 User Safety: Commissioning and Early Experiments NEH ARR Introduction User Safety Training for Commissioning & Early Experiments Scope of User Qualification User Safety Training Experiment Hazard Control Process Experiment Safety Reviews Execution of Experiments Experiment Completion

3 Zoe Van Hoover 3 User Safety: Commissioning and Early Experiments NEH ARR AMO Commissioning ~August 17, 2009 – September 30, 2009 Commissioning Collaborators will be trained and processed as Users during the commissioning period. 23 people total, 10 to 15 people on site at any time Schedule developed by Instrument Scientists SSRL-LCLS User Research Administration (URA) knows who is coming and when

4 Zoe Van Hoover 4 User Safety: Commissioning and Early Experiments NEH ARR First AMO User Experiments Oct 1-6: L. Young, spokesperson 18 Users Will use existing AMO equipment, with Neon gas Oct 8-14: L. DiMauro, spokesperson 15 Users Will use existing AMO equipment, with He and Ne gas These experiments will introduce no new hazards beyond the scope of those present during AMO commissioning

5 Zoe Van Hoover 5 User Safety: Commissioning and Early Experiments NEH ARR Training Established SLAC Work Planning & Control Processes Apply to all workers XFD Staff Users Supervisor determines training requirements Work is not authorized until training complete Instrument Scientist is User supervisor XFDSO advises Instrument Scientist regarding user training requirements No supplemental training required for early users

6 Zoe Van Hoover 6 User Safety: Commissioning and Early Experiments NEH ARR Early User Training Process Before Arrival on Site Complete training available online (GERT, SON or EOESH, Elect. safety) User Access Guidelines and Agreement and/or hutch safety orientation training materials also available online Directed by Gate Guard to SSRL-LCLS URA office URA confirms completion of remote training courses Courses may be completed at the URA office Read and sign User Access Guidelines and Agreement URA prints training summary document indicating completion of all training Instrument Scientist picks up users and printed training summary document, escorts users to hutch Arrive at Hutch Instrument Scientist provides hutch safety orientation Floor Coordinator provides hutch search training Floor Coordinator posts training summary document at hutch Instrument Scientist reviews work plan with user and provides work authorization Floor Coordinator provides work release

7 Zoe Van Hoover 7 User Safety: Commissioning and Early Experiments NEH ARR Resources for Providing User Training GERT, SON, EOESH, Electrical Safety Course #239 URA staff already in place, can administer this training Electronic training materials already exist (SLAC ES&H courses) Tracking of course completion is done through electronic STA database Hutch 1 Safety Orientation Scope: Alarm and emergency response Awareness of special hazards and hazard mitigations in the area Postings and rules such as hutch occupancy limits Training on the use of SOPs to operate vacuum and pressure systems Limitations on scope of allowed User work Instrument Scientist staff is in place, and will administer this training Training materials released Tracking of course completion will be done at the hutch on a paper training summary which will be archived by URA

8 Zoe Van Hoover 8 User Safety: Commissioning and Early Experiments NEH ARR Resources for Providing Training (continued) Hutch 1 Search Training In order to train XFD staff Hutch 1 search procedure is released Hutch 1 search training materials are released Training qualification is tracked on paper in the XFD Staff HPS Training Record Summary document, maintained by XFD documentation office Staff in place: Safety Officer, XFD managers, & FCs Safety Officer training XFD managers and Floor Coordinators In order to train Users Floor Coordinators must be qualified (by supervisor) to administer training Floor Coordinators train Users to perform search Tracking of User search qualification will be done at the hutch on a paper training summary, which will be archived by URA

9 Zoe Van Hoover 9 User Safety: Commissioning and Early Experiments NEH ARR User Qualification Training Qualifies Users to: Have unescorted access the NEH experimental floor Participate in NEH Hutch 1 searches (after training) Operate R&D electrical equipment using local panel or remote computer Operate vacuum and pressurized gas systems following SOP Users NOT qualified to: Construct, maintain, or install R&D equipment with electrical or other hazards Operate breakers Fabricate, maintain, or modify vacuum or pressurized gas systems Operate vacuum or pressurized gas systems outside of the scope of SOP Perform other activities requiring safety training beyond that provided

10 Zoe Van Hoover 10 User Safety: Commissioning and Early Experiments NEH ARR Early User Training: Conclusion Early Users will be trained and qualified for a limited scope of work Hazards during commissioning and first experiments have been identified Understood Hazard mitigations and controls in place Readiness to provide safety training to early Users: Staffing URA staff in place Instrument Scientist staff in place Floor Coordinator staff in place Documentation Training materials for GERT, SON, EOESH, and Electrical Safety are ready Training materials for Hutch Safety Orientation are ready Training materials for NEH Hutch 1 Search are ready Training Records Electronic tracking of GERT, SON, EOESH, and Electrical Safety are ready Training record of User Search Training and Hutch Safety Orientation ready

11 Zoe Van Hoover 11 User Safety: Commissioning and Early Experiments NEH ARR Experiment Safety Review Commissioning & Basic Instrument Operation Existing SLAC safety review processes Safety Overview Committee Instrument Readiness Review Work Planning & Control User Experiment Safety Review Hazards beyond those present for instrument commissioning and basic instrument operation Depends upon prior completion of instrument safety review and hazard controls

12 Zoe Van Hoover 12 User Safety: Commissioning and Early Experiments NEH ARR Experiment Safety Review User Experiments Solicit hazard information from spokesperson Proposal Following scheduling of beamtime XFDSO determines hazard control requirements SLAC ES&H manual SLAC safety subject matter experts Supplemental User training requirements Requests IRR if necessary Determines material acquisition and disposal path Generates Safety Checklists XFDSO signed Safety Checklists constitute approval to proceed with experiment with required controls in place Communicates supplemental training requirements to user supervisors and URA Communicates hazard control requirements to spokesperson Communicates material acquisition and disposal plan to spokesperson and Instrument Scientists

13 Zoe Van Hoover 13 User Safety: Commissioning and Early Experiments NEH ARR Experiment Execution Beam Line Authorization Authorizes x-ray operation to the hutch Beamline Specific Experiment Independent Notice of open Radiation Safety Work Control Form placed over / near BLA

14 Zoe Van Hoover 14 User Safety: Commissioning and Early Experiments NEH ARR AMO BLA

15 Zoe Van Hoover 15 User Safety: Commissioning and Early Experiments NEH ARR Safety Checklists Commissioning X-Ray Phase Safety Checklist No Set-up Phase Safety Checklist required Early Experiments Both Checklists XFDSO authorization No hazards beyond baseline instrument hazard No additional controls

16 Zoe Van Hoover 16 User Safety: Commissioning and Early Experiments NEH ARR Floor Coordinators 24 / 7 coverage with shift change overlap Keep XFD operations electronic log Complete and post required documents BLA Safety Checklists User Training Summary Online/Offline Checklist Provide User work release Monitor safety of user work Stop work authority Incident, Emergency, Alarm response

17 Zoe Van Hoover 17 User Safety: Commissioning and Early Experiments NEH ARR Experiment Completion When Experiment is Complete Material disposal Shipped back to user home institution SLAC shipping and receiving process Disposal through SLAC hazardous waste disposal process Instrument Scientist takes ownership until disposal User departure Notify Supervisor and URA of departure Return SLAC badge Spokesperson completes URA questionnaire Safety Feedback Experiment Specific Hutch Postings Archived User Training Summary Safety Checklists Online/Offline Procedure

18 Zoe Van Hoover 18 User Safety: Commissioning and Early Experiments NEH ARR Conclusion Experiment Hazard Review and Control Process Follows SLAC ISEMS