AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus

Slides:



Advertisements
Similar presentations
Buildings and Structures 1
Advertisements

Dr. Ruth Collins TrinityHaus
Introduction to composite construction of buildings
Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder
CORE DESIGN.
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Rigid-Frame Structures
Fire Behaviour Elements of Structure and Fire Development.
STAIRCASE.
Designing Tall Buildings: Why is it different
IBC 2006 Chapter 5 Building Height and Areas After determining occupancies, the code analysis determines what height and areas are allowable for the occupancy.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Building Description Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
Rectangular framed structures
Construction Technology 3 D39 TA Dr Mohamed Abdel-Wahab Edwin Chadwick Building, Room Lecture.
BASIC CONSIDERATIONS IN DESIGN  The aim of the design is to completely obtain the dimensions of all the parts of the machine to furnish the data to the.
Governmental Constraints on Construction Chapter 2.
Governmental Constraints on Construction Chapter 2.
Atrium Fire Protection
Umm Al-Qura University Department of Civil & Structural Engineering
WORKSHEET 4 BEAMS.
2009/ 2010 Linus Wang MBA, MSc (Int’l Constr Mgmt), B Eng (Civil) Diploma in Construction Management Diploma in Quantity.
3D Panel Construction System
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Cross Wall Construction
Prof. Shrikant M. Harle Asst prof. Dept of Civil Engg PRMCEAM
Dr Badorul Hisham Abu Bakar
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION..
Session 1: Identifying Construction Drawings and Drawing Components.
How School Design Impacts Education
Backgrounds and Plaster
ECO TOWERS Energy efficient office spaces next to Delhi in NOIDA
Introduction to composite construction of buildings
Prefabricated Timber Frame Construction
By Dr. Moustafa Zayed Lecture 1
CHAPTER 2 Basic House Designs
Name That Housing Option…
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
BUILDING CONSTRUCTION 1
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
PRINCIPLE PROPERTIES OF BUILDING MATERIALS
Carl James Type of building use
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Pre-Contract Cost Control
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Engineering Project Cable Management.
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Backgrounds and plaster
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION.
Foundations Four Basic Types Footings Piers Pilings Slabs
Arch205 building construction floor & Roof systems
Managing Office Property
1 Semester Project Design A Multi Story Office Building
Design Ribbed and Flat Slabs
Presenter Tony Bosnich 2015
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Hotel Conversions Background
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Masonry Bearing Walls.
GBCORP TOWER Prime office space for lease. BAHRAIN FINANCIAL HARBOUR
Building standards Mr. Da Silva.
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus

Lecture title: The impact of structures and services on space use. Lecture number 2 Lecture title: The impact of structures and services on space use.

In this session… In this session we will consider, ‘Is work somewhere we go, or something we do?

Learning outcomes At the end of this session you should be able to: The learning outcomes of this session 1. Analyse knowledge and information management on space allocation in offices and buildings.

What does a space plan look like?

Client Requirements Examples of general client requirements in office buildings are: Occupation density 1 person per 10 to 15m2 Useable floor area :Total area 80 to 90% typically Floor to floor zone 3.6 to 4.2m Floor to ceiling zone 2.7 to 3m typically Imposed loading 2.5 to 5kN/m2 Fire resistance 30 to 120 minutes. Source: British Council for Offices

Performance Requirements 1) Structural Stability 2) Durability 3) Thermal Insulation 4) Moisture exclusion

Economic Benefits Speed of construction Site management costs Factor Improvement Economic benefit Speed of construction 20 to 30% reduction in construction time relative to site-intensive construction, depending on the scale of the project. The economic benefit depends on the business operation. In terms of overall building cost, a saving of 1% in interest charges, and 2% in early rental or use of the space is predicted. Site management costs Site management costs are reduced because of the shorter construction period, and the packaged nature of the construction process. Site management costs can be reduced by 20 to 30% which can lead to a 3 to 4% saving in terms of overall building cost. Service integration The integration of services in the structural zone leads to reduction of 100 to 300mm in floor to floor zone and hence to savings in cladding cost. A 5% reduction in floor to floor height can lead to one additional floor in 20, and to a similar reduction in cladding cost, which is equivalent to about 1% in total building cost. Foundations Steel construction is less than half the weight of an equivalent concrete structure, which is equivalent to a 30% reduction in overall foundation loads. Foundation costs depend on the sub-structure and factors such as underground services and represent 5 to 15% of the building cost. A 30% reduction in foundation loads can lead to a 2 to 3% overall saving in terms of construction cost. Column free space Long span steel construction provides more flexible use of space, which depends on the function of the building and its future uses. A large column in the middle of the space leads to a loss of space of approximately 1m2, which represents about 1% of the floor area, and may lead to an equivalent loss of rental income.

Design Considerations The anatomy of a commercial office building is function of its size and location, i.e. city centre tower or two-storey science park office building at the two extremes, and client and planning requirements. Some key aspects of building anatomy are described below. The common features that influence the building design are: Open plan areas that can be configured to suit the client requirements Partitioned space for executive offices, conference room etc. Partitions should be moveable for future re-configuration Communal space for toilets, kitchens, etc. which are often located near to service risers Access space for lifts, stairs and services maintenance, including means of escape in fire Featured space, such as the entrance lobby, atria, and penthouse Service plant areas which may be located on the roof or in the basement Below ground car parking in some cases.

Central Core The office space wraps around the core, and from a functional point of view, this space should be as flexible as possible. The main beams therefore radiate from the core and are supported on perimeter columns. The provision of natural lighting tends to mean that the width of the office space is limited to about 15m. Services emanate from the core and are distributed through openings in the structure.

Commercial Buildings With Atria For a building layout point of view, the commercial space is typically 15 to 18m wide around the atrium and the cores are located at positions dictated by means of escape in fire. Generally, a minimum of two cores, and often as many as four separate cores are required on plan in buildings with atria. The simplified plan form of an office building with a central atrium is shown.

Science Park

Summary The cost of corporate property is the second highest corporate expense after payroll. Understanding the impact structure and services can have upon operations.

Next session In next week’s lecture we will consider and discuss: The principles involved in developing a space strategy.