● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Monday 18 October : Collimation system
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Thursday 30th September De-bunching test
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
31/3/2010 Difficult day… but at the end stable beams.
Tuesday
HI2011 Commissioning Status
Monday 152 bunch operation summary
Presentation transcript:

LHC Operation Week 38 Coordination G.Arduini, R.Bailey Aims for the week Complete qualification of the machine for operation with bunch trains Physics with bunch trains 24 bunches 56 bunches 104 bunches Achieved physics with bunch trains up to 104 bunches/beam with luminosities of 3.5 x 1031 cm-2s-1 and integrated luminosity >1 pb-1 in 13.5 h fill

Statistics Mon 20/9 at 07:00 to Mon 27/9 07:00 Major stops: Set-up with beam: 45 % Stable beams: 31 % Set-up without beam: 14 % Faults: 10 % Delivered luminosity: ~ 3 pb-1 Major stops: QPS (Quench Heater power supply, World FIP repeater, noisy board on Q10.L2) , TCDQ, RF (noise on cavity 4B1)

Week overview Machine Protection qualification completed by Wednesday Morning First Physics fill with bunch trains (24 on 24) on Wed evening Physics fill (56 on 56) on Thu evening. ALICE sees parasitic collisions at 11 m form IP Polarity switch of ALICE solenoid and spectrometer of Friday, orbit correction (bump non-closure compensation) all through the cycle Short physics fill (56 on 56) on Saturday morning dumped by fast loss during movement of Roman Pots (they were still way open at the time of the loss) Physics fill (104 on 104) on Saturday evening

Yesterday 09:00 Fill luminosity > 1 pb-1 in all high luminosity experiments after 13.5 h Move to adjust and end of fill measurements (lumi scans) 10:00 – 11:00 TOTEM Roman pot test 12:00-18:00 Capture problems for Beam 1 (finally traced to noise on the voltage on Cavity 4B1) 21:30 Stable beams #1373 150ns_104b_93_8_93_8bpi Frequent RF trips overnight Lost 2 BPM crates. 1 fixed. Continued relying on BPM redundance (1 out of 2 BPMs available in the affected area) working and corrector control + BLMs

Bunch train commissioning – Machine Protection Thorough verification of the collimation set-up completed by Wed 22/9 morning Done - 22nd Done - 21st R. Bruce, S. Redaelli, D. Wollmann

Bunch train commissioning – Machine Protection TOTEM alignment and protection validation at 20 (H)/18 (V) sigmas. Data taking for TOTEM with tight settings and low intensity (Tue 21/9) B2H B2V

Bunch train commissioning – Machine Protection Simulation of asynchronous damps in different machine conditions for qualification of the machine protections C. Bracco, B. Goddard, J. Uythoven

Bunch train commissioning – Emittance control Damper functions at injection-ramp maintain damping time in ramp (exact function to be calculated) Max. gain for hump dumping 450 GeV (-6 dB B1HV / -12 dB B2V) damper gain cycle time Q-FB on (-22 dB B1HV / -28 dB B2V) 3.5 TeV on (-5 dB B1HV / -11 dB B2V)

Bunch train commissioning – Emittance control Fill # bunches eH B1 @inj eV B1 eH B2 eV B2 eHV @coll (from init. Lumi) eH @end of coast (from Lumi scan or WS) eV @end of coast (from Lumi scan or WS) 1364 25 2.5 1.9 3.2 2.7 4.0/4.5 3.8/4.9 1366 56 1.7 2.0 2.3 2.2 3.5 1369 2.1 2.6 2.9 - 1372 104 2.8 3.7 4.5 New functions for the damper allow to mitigate blow-up due to hump in the vertical plane. Gain functions during the ramp remain to be optimized (ongoing). ~10-20% blow-up during injection plateau and ramp. Systematic difference B1/B2 already at injection remains an issue  to be followed-up (mismatch?) Reproducibility of the blow-up in the PS to be followed-up Blow-up in collision (~40-50 %) to be further studied

Bunch train commissioning – Longitudinal blow-up Longitudinal blow-up leading to different bunch lengths for Beam 1 and Beam 2  functions optimized for bunch trains

Bunch train commissioning – ALICE crossing angle Following observations on fill 1366: head on collisions at 11 m from IP on Thu ALICE polarity switch (polarity of the spectrometer not consistent with crossing angle leading to a reduction of the effective crossing angle at the IP) After ALICE polarity reversal After polarity reversal & orbit correction 11/26/2018 LHC status

Stable beams 24b_16_16_16 (13.5 h – ~170 nb-1)

Stable beams >1013 p/beam 5.5 MJ per beam ! Squeeze Collisions B2 lifetime low around 5 m B2 down to ~1h Collisions Luminosity 3.5 1031 Emittance of ~2.8 mm 104b_93_8_93 (14h – >1000 nb-1) 11/26/2018 LHC status

Lifetimes and losses G. Papotti R. Steinhagen IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 G. Papotti R. Steinhagen 11/26/2018 LHC status

Fast loss #8 Fast loss event type (8L7). Faster rise time as compared to previous events. Same position as first fast loss event (07-07-2010 20:22:19 during the squeeze). Yesterday 25 bunches – 8/8/2010

Fast loss #9 11:06: Fast beam loss while moving the Roman Pots (still very far out). Risetime of 0.4 ms, signal relatively strong at 0.3 G/s. Spike in the top and bottom V pot of the far unit XRPV.B6R5.B1. Nothing was seen in the H pot. The near unit was not on. 11/26/2018 LHC status

Issues - TCDQ Thu 23/9 Sat 25/9 TCDQ.B2 not ramping TCDQ B1 position and limits during the ramp Glitch in the position readings at the moment of the beam dump, which correspond exactly to the end of the ramp function. Machine protection reacted correctly. Actions to be identified. Sat 25/9 TCDQ.B2 not ramping Problem related to sending data to TCDQ when not in a wait state Possibility to get TCDQ in a state where it looks armed but does not respond to timing Modifications to sequence to prompt for checks and add delays before sending settings In longer term modifications needed on the equipment driver to protect against this 11/26/2018 LHC status

Issues – BBQ (tune measurement) Noise floor increasing during the ramp (due to bunch length shortening?) Mostly affecting B1 H Not enough signal to drive the tune feedback Had to run the chirp during the squeeze (Sunday) Development system (with low pass filters) does not suffer form that  access probably required Need to fix this problem if we want to run without excitation PLL could help R. Steinhagen 11/26/2018 LHC status

Issues – RF Observed intermittently low lifetime after injection in pilot and bunch trains on Sunday Beam debunching Origin: Noise on cavity 4B1around 5:00 between Sat and Sun night. Could explain higher loss rate observed during last coast on B1. In the meantime we switch Cav4B1 OFF and re-arrange counter-phasing and voltage partition to keep ~ 4MV capture voltage and 8 MV during physics. Since we increased intensity frequent RF trips while in physics Ph. Baudrenghien 11/26/2018 LHC status

Issues - BCT Problem with DC-BCT according to the injection pattern. DC BCT data not reliable  BI investigating

To fit in later Transverse damper firmware update (to prevent glitches positions very close to 0) – W. Höfle Test of luminosity optimization software - S. White Gas Ionization Profile Monitor tests - M. Sapinski Abort gap cleaning – M. Meddahi Test of new beam presence flag system – M. Gasior DC BCT – P. Odier Q kicker – R. Barlow CO security intervention to be scheduled - A.Bland 11/26/2018 LHC status

Plans End of fill measurements Access: quench heater power supply on MB.C12L1 BBQ detector intervention DC-BCT ? RF cavity 4B1 tests without beam and TCDQ tests, BPM crate repair Physics fill 104 on 104 Machine Coordinators: M. Lamont, J. Uythoven