Xoserve provide meter and access instruction

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Is the shape below a function? Explain. Find the domain and range.
UNC Urgent Modification Proposal 0275 Timeline.  Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from.
BASIC FUNCTIONS OF EXCEL. Addition The formula for addition is: =SUM( insert cells desired to sum up ) This returns the sum of the selected cells.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
f has a saddle point at (1,1) 2.f has a local minimum at.
Math – Getting Information from the Graph of a Function 1.
Relationships of CREATED BY CANDACE SMALLEY
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Continued… Obj: draw Box-and-whisker plots representing a set of data Do now: use your calculator to find the mean for 85, 18, 87, 100, 27, 34, 93, 52,
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
PN UNC Workgroup iGT Services 7 th February 2012.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Background Current balance of LDZ System and Customer charges
Under Test End Dates 1st February 2011.
Project Nexus Workgroup (Settlement)
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Normal Processing Time Expedited Processing Time
Unique Sites End to End Process Walkthrough
Meter Status Table Providing timely opening reads is an obligation to the confirming shippers. However where the confirming shipper fails to meet this.
Confirmation Notice Period for Certain ‘Unique’ Sites
Agenda Action Review Update on IX and iGT access Testing strategy
What is the function of the graph? {applet}
New project process – timescales
Action: DX0602 Xoserve; to look to provide performance related data appertaining to the confirmations / reconfirmations process. The following values are.
Elaine Carr ScottishPower
Summary of a MAP portfolio
Modification 0429 scenarios v2.0
Query Functions.
MOD 258A Demand Estimation Sample Point – Shipper Report.
Data Flows Supporting The 2008 Annual Tender Process
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
0630R Review Group meeting 21 February 2018 Settlement Data topic
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
QPTM-Capacity Release
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
PN UNC AMR Topic Workgroup
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SPA Processes for DM Sites
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Unregistered Sites Reports
Project Nexus Workgroup
AQ BTU Form – Process & Timeline 29th September 2009
DN Interruption Phase II
Dave Addison August 2008 Application Support Updates
Project Nexus Workgroup
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Project Nexus Workgroup
DSC Change Committee Update
0688 Workgroup Xoserve Actions
Shipper MI (Shipper Pack / PARR)– Update
Number Summaries and Box Plots.
Development Work Group 194
XRN Enabling large scale utilisation of Class 3 – MOD0700
Presentation transcript:

Xoserve provide meter and access instruction Supply Point Transfer Timeline Confirmation Live (D) D -8 Conf at CO status Transfer read must be loaded UMR 0 – 10 days Estimate transfer read MBR If shipper does not load read by D +10 0 – 5 days Current Shipper notified of conf CFR Objection window CFR + 7 days Confirm CNF 0 – 2 days 7 days 8 days Max 30 Days notice Min 15 Days notice (8 days if Withdrawn or re-conf ) Xoserve provide meter and access instruction TRF MRI Between D-7 and D-5 Maximum notice 30 days All days are Business Days Minimum notice 15 days (no withdrawal)

Xoserve provide meter and access instruction Supply Point Transfer – example for confirmation effective date 14/03/08 20/02/08 04/03/08 04/03/08 14/03/08 D -8 Conf at CO status Confirmation Live (D) Transfer read must be loaded UMR 0 – 10 days Estimate transfer read MBR If shipper does not load read by D +10 0 – 5 days Objection window CFR + 7 days Confirm offer CNF Current Shipper notified of conf CFR 0 – 2 days 7 days 8 days Min 15 Days notice (8 days if Withdrawn or re-conf ) Xoserve provide meter and access instruction TRF MRI Between D-7 and D-5 Minimum notice 15 days (no withdrawal) All days are Business Days Dates account for 25/02/08 and 26/02/08 as non-Business Days