Overhead Crane General Use & Inspection Criteria The Selection Process For Both Overhead Cranes & Underhung Hoists, Should Not Be Taken Lightly. A Significant.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
for Cabin Safety Inspectors
David Burdett May 11, 2004 Package Binding for WS CDL.
Getting there in comfort
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1D - Dislocated Worker Chapter 9.
Create an Application Title 1A - Adult Chapter 3.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
Lock Out/Tag Out (LO/TO)
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Site Safety Plans PFN ME 35B.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Red Tag Date 13/12/11 5S.
1. 2 Earthquake effects on health care facilities 2.
PP Test Review Sections 6-1 to 6-6
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH F-23.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
1 Impact Assessment. 2 Demographics 3 Sex and Age.
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Overhead Crane General Use & Inspection Criteria The Selection Process For Both Overhead Cranes & Underhung Hoists, Should Not Be Taken Lightly. A Significant Amount Of Pre-planning Is Needed To Place The Proper Crane Or Hoist Into The Proper Environment. The Key To Equipment Longevity Is Complete And Through Inspections

Different Equipment Types Overhead Cranes Gantry, Semi-gantry, Bridge, Cantilever etc Underhung Hoist Monorail, Underhung Bridge, Wall jib, Floor jib, etc Electric, Air (pneumatic), Manual powered

Duty Cycle Classes There Differences Between Overhead and Underhung Crane Classifications

Duty Cycles - Overhead Cranes CMAA spec 70 ASME B30.2

Duty Cycles - Overhead Cranes There are six Service Class designations for the Overhead Cranes based on their Load Class and Load Cycles. Class A – F Class A – Standby or Infrequent Service Class B – Light Service Class C – Moderate Usage Class D – Heavy Service Class E – Severe Service Class F – Continuous Severe Usage

Duty Cycles - Underhung Hoists CMAA spec 74 ASME B30.16

Duty Cycles – Underhung Hoists There are four Service Class designations for the Overhead Cranes based on there Load Class and Load Cycles. Class A – D Class A – Standby or Infrequent Service Class B – Light Service Class C – Moderate Usage Class D – Heavy Service

Duty Cycle & Maintenance Cost Placing Class B Crane Into A Class C Environment is Tantamount to …. Flushing Your Maintenance Dollars Down The Toilet!

Overhead Crane Inspections There Are Two Reasons For The Correct And Timely Performance Of Inspections, And Testing On Overhead Cranes. 9

Overhead Crane Inspections Humanitarian Decrease The Probability For Equipment Failures That Result In Personnel Injuries/Death. Provide A Safer Working Environment For All Workers. 10

Overhead Crane Inspections Economic Increased Productivity. Decrease Repair & Replacement Cost. 11

LOCKOUT/TAGOUT 29 CFR Procedures Designed To Save Lives And Prevent Injuries Prior To Maintenance And Inspection Procedures 12

TYPES OF STANDARDS Regulatory Standards Federal OSHA State OSHA Must Be At Least As Effective As Federal OSHA 25 States & Two Territories 13

TYPES OF STANDARDS Regulatory Standards (cont.) Local Requirements Employer Practices Manufacturer Specifications/ Recommendations 14

TYPES OF STANDARDS Consensus Standards ASME (American Society of Mechanical) CMAA (Crane Manufacturers Association of America) NEC (National Electric Code) 15

INSPECTION REQUIREMENTS Federal - General Industry Initial (29 CFR (j) (1)) Regular (29 CFR (j) (2)) Frequent: 29 CFR (j) (2) and ASME B30.2 Periodic: 29 CFR (j) (3) and ASME B

INSPECTION REQUIREMENTS Federal – Construction Permanently Installed Cranes Exempted

INSPECTION REQUIREMENTS Federal – Construction Non-Permanently Installed Overhead Cranes Used in Construction Must comply with the following: Modified Equipment ( (a)) Repaired/Adjusted Equipment ( (b)) Post-assembly ( (c)) Each Shift ( (d)) Monthly ( (e)) Annual/Comprehensive ( (f)) Severe Service ( (g)) Equipment Not In Regular Use ( (h)) 18

INSPECTION PROCESS Inspections may be broken down into systems, i.e. Mechanical –Brakes (not including the actuators) –Brake lining –Gear Box(s) –Drive (End) Trucks –Drive Shafts, etc. Structural –Runway –Rails –Bridge Girders, etc. 19

INSPECTION PROCESS Inspections may be broken down into systems, i.e. Electrical –Motors –Controllers –Brake actuators –Buss Bars –Electrical Cabinets, etc. Hydraulic/Pneumatic –Brake Actuators –Master Cylinder, etc. 20

INSPECTION PROCESS 21 Drive Wheel, Gearbox & Driveshaft Mechanical Inspection

INSPECTION PROCESS 22 Brake Lining, Drums & Components Mechanical Inspection

INSPECTION PROCESS 23 Catwalk & Driveshaft Alignment & Mounting Mechanical Inspection

INSPECTION PROCESS 24 Gear Box Inspection Mechanical Inspection

INSPECTION PROCESS 25 Runway & Rails Structural Inspection

INSPECTION PROCESS 26 Support Column Alignment & Missing Hardware Structural Inspection

INSPECTION PROCESS 27 Bumpers & End Stops Structural Inspection

INSPECTION PROCESS 28 Confirm Square of Bumpers &Rails Structural Inspection

INSPECTION PROCESS 29 Wiring and Wire Terminations Electrical Inspection

INSPECTION PROCESS 30 Hoist Motor Electrical Inspection

INSPECTION PROCESS 31 Collectors & Conductors Electrical Inspection

INSPECTION PROCESS 32 Hydraulic Brake for Leakage Hydraulic/Pneumatic Inspection

REQUIREMENTS FOR LOAD TESTING Operational Tests and Rated Load Tests: Initial Installation (NEW) After Alterations, Repairs Or Modifications 29 CFR (K) (1) ASME B And Some State OSHAs Require Load Testing 33

DOCUMENTATION Required Annual Monthly On Critical Items And Running Rope 34

DOCUMENTATION Recommended Documentation And Retention Time Daily (Current And Previous Month) Weekly (Latest Plus Previous 4) Monthly/Quarterly (Latest Plus Previous Year) Semi-annual/Annual (Latest Plus Previous Year) Others (Latest Plus Previous Year) 35

DOCUMENTATION Required Documentation And Retention Time Per 29 CFR 1926 Subpart CC Monthly (29 CFR (e)(3) (document must be retained for a minimum of three months) Annual (29 CFR (f)(7) (document must be maintained and retained for a minimum of 12 months) 36

Maintains A Complete Inspection, Maintenance, And Testing History Of The Equipment. Allows End User To Establish Life Cycle Cost. Assist In Establishing Trend Analysis. 37 DOCUMENTATION

DOCUMENTATION Can Establish Requirements For On-hand Spare Parts To Decrease Replacement Lead Time Provides Statistical Data To Predict Mean Time Between Failure (MTBF) Provides Statistical Data To Predict Mean Time To Repair (MTTR) To Defend Against Liability 38

STORAGE OF DOCUMENTATION Documents should be stored in a place where they are readily available. All workers, most importantly the operator, should know where these papers are. 39

SUMMARY The Inspection And Testing Of Overhead Cranes And Hoists Is Crucial To Safe Workplace Conditions. Any Kind Of Equipment Begins Depreciating After Its First Use. A Defect In Equipment Can Bring A Quick End To The Day, In A Best-case Scenario. 40