Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.

Slides:



Advertisements
Similar presentations
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Inst. Overview Alice Preliminary Design Review JRS / 1 Instrument Overview and System Engineering John Scherrer (210) July.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Space Engineering 2 © Dr. X Wu, 2012
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Michael deLamare Requirements Management Program Functions R-9.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
SPICA / AIV&T issues Spacecraft test program & model philosophy
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Contamination Analysis of Optical Telescope Assembly (OTA) April Electronic, Mechanical Components and Materials Engineering Group, Institute of.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 Airborne Science Program EMASHSI Kick Off Meeting Interfaces NASA Ames Research Center University of California Santa Cruz Airborne Science & Technology.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
SNAP spectrograph demonstrator : AIT/AIV Cedric CERNA CNRS (IN2P3,INSU) FRANCE,
Status of the SWAP instrument
Rose Navarro HMI Lead Thermal Engineer
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS INSTRUMENT SUITE
0.0 Instrument Suite Name Presenter’s name
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope
Systems Engineering Bob Goeke.
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Launch and On-orbit Checkout
Integration and Test Organization Chart
GLAST Large Area Telescope
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Integration and Test Organization Chart
Introduction and Overview
Instrument Overview Larry Springer HMI Program Manager
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson

Leicester SRC, 3-5 Dec 2007 Elements Requirements engineering Accommodation engineering –Optical –Mechanical –Thermal –Electrical Quality engineering –Verification –Reliability – Risk Mitigation –Serviceability Documentation Model Philosophy

Leicester SRC, 3-5 Dec 2007 Requirements Engineering Science Requirements leading to: –Observatory requirements (pointing, stability, etc) –Chosen detector technology + implementation Position and Envelope Mass Alignment precision Electrical –Power –Noise environment –FE electronics »I/F to separate electronics Thermal Stray light Contamination control Mechanisms Mission requirements –Schedule –Budget allocations –Envelope –Environment Thermal Mechanical Radiation Electrical Attitude disturbance –Reliability Redundancy Life –AIV approach Test and verification facilities Storage, transportation

Leicester SRC, 3-5 Dec 2007 Accommodation Optical requirements and Optical packaging –Position and Volume Vacuum vessel & door/window –Alignment approach –Protection – Door, purging –Mechanisms –Stray light control FP technology specifics –Sealed tube? –Thermal requirements Radiator size, proximity and attitude wrt Sun & Earth Dissipation, detector and FEE Isolation, detector and FEE –Electrical requirements HT discharge precautions, power efficiency Proximity of FEE Relation to main electronics –Radiation protection

Leicester SRC, 3-5 Dec 2007 Quality Engineering Requirements & Design for verification –Testable at all stages –Calibratable and stable Build quality –Traceable materials and parts of known quality –Tried and tested processes Requirements & Design for reliability/confidence –Lessons Learnt from previous similar instruments –Redundancy where possible Failure mode, effect and criticality analysis –Cleanliness –Self test, internal calibration, housekeeping parameters, raw data availability Requirements & Design for serviceability –Spare parts –Access

Leicester SRC, 3-5 Dec 2007 Documentation Hierarchy of requirements Specifications Interface Control Documents Plans Procedures –Assembly –Test –Operations Reports

Leicester SRC, 3-5 Dec 2007 Detector Model Philosophy Deliverable models –Whatever WSO/Lavotchkin requires, STM, EM & FM –Perhaps consider full FS focal plane Development models (dev. function) –Working backwards: Flight Model (calibration) – tested to acceptance levels Ground engineering model (calibration, stability, troubleshooting, software development) –aka Validation Model, qualification levels in test Breadboard model (manufacture & assembly development) Qualification could be done on FM (Proto-flight philosophy – overdesign)