Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 1 Golfech nuclear power plant New system to put and extract the fuel assembly.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Using one or more of your senses to gather information.
Subtraction: Adding UP
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 1 Golfech nuclear power plant New system to put and extract the fuel assembly in the reactor

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 2 1. Presentation of the system 2. Schedule of the project 3. « The Supervisor » 4. Figures 5. Conclusion Summary

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 3 4. Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Situation in the power plant

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 4 4. Figures 5. Conclusion History To handle the fuel assembly in the PWR reactors (Pressurised Water Reactor) around the world, we currently use the PMC system (fuel handling and storage system) : - 1 Fuel Handling (Crane) - 1 Fuel Transfer Machine - 1 Fuel Manipulator 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" 4,75m 20 cm

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 5 Fuel Transfer Machine Deactivation Pool Reactor Vessel Fuel Handling Fuel Manipulator 4. Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 6 Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building 4. Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 7 4. Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 8 4. Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck 9 4. Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Fuel Transfer Machine Deactivation Pool Fuel Manipulator Fuel Handling Reactor Vessel FB Fuel Building RB Reactor Building

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion History In 2001, EDF decided to install a new system. These improvements were : - To increase safety (by putting new sensors) - To handle 8 fuel assemblies per hour (Today it is 5/h. => save 14h/activity => 28h/outage) - To reduce the cost of the service (Confidential) 1. Presentation of system 2. Schedule of the project 3. "The Supervisor"

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion Objectives for EDF EDF has decided to install « The Supervisor » in the PMC system between 2005 – 2012, in order to make these improvements. This new system will be used in 1300 MW nuclear power plants in France (20 units) and perhaps in the EPR units. 1. Presentation of system 2. Schedule of the project 3. "The Supervisor"

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Schedule of the project EDF decided to install the new system Install new system in 1 power plant test (PALUEL=2 units) 2001 EDF decided to install this new system in all 1300 MW power plants in France Study on the new system (Ask questions to different power plants and the constructors) I gave my opinion about my experience on this subject Installation of new system in Golfech power plant (The end of project)

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" « The Supervisor » - Camera system- Computer system - Supervisor system - Fuel Manipulator- Fuel Transfer Machine- Fuel Handling 4. Figures 5. Conclusion (Fuel Building ) FB RB (Reactor Building)

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Figures : Study Affair3 people in the engineer unit (Marseille) studied these improvements (Mechanic, electric, automatic data processing) 10 people participated in the study (like me) and elaborated the schedule condition (Studies on nuclear pressure : Risk of fire, of seism, redundancy). Time2 years CostConfidential 4. Figures 5. Conclusion

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Figures : Installation Units20/58 units in France (1300 MW) FirmsREEL : For mechanic and electric improvements SCHNEIDER ELECTRIC : For automatic data processing Time15 weeks : 12 weeks before the outage (outside the reactor building) Use the old and part of the new system to remove fuel 3 weeks during the outage (In the reactor building) Put fuel assembly with the new system Waste4t nuclear waste per unit (4tx20=80t for French nuclear plants) CostConfidential 4. Figures 5. Conclusion

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Figures : Operation Preparation1 person for 2 reactors for 1 month to create new procedures (20x2=10 people for French nuclear plants) TrainingTraining 35 people for every 2 reactors (=>35x20/2=350 people for French nuclear plants) for 1 week in Lyon CostConfidential 4. Figures 5. Conclusion

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Figures 5. Conclusion 1. Presentation of system 2. Schedule of the project 3. "The Supervisor" Figures : Maintenance PreparationElectrical and automatic service : 2 people per plant for 1 month to create new procedures (2x8=16 for French nuclear plants) Mechanic service : 1 person per plant for 1 month to create new procedures (1x8=8 for French nuclear plants) EquipmentReplace spare parts warehouse for French nuclear plants (Paris) Firms2 firms to do the maintenance for the French nuclear plants CostConfidential 4. Figures 5. Conclusion

Grenoble, June 2008 GOLFECH NPP\TX-CLE\Fuel preparation - RONZANI Franck Presentation of system 2. Schedule of the project 3. "The Supervisor" Conclusion 4. Figures 5. Conclusion To improve availability, safety, service and cost, EDF decided to install a new system to change nuclear fuel. To do this, in 20 units (1300MW) of nuclear plants and for 350 operators, we need : - 12 years - 47 EDF people to do the study - 2 firms to do the project This investment by EDF is a part of the sustainable development for nuclear energy