TOP-010-1(i) Implementation

Slides:



Advertisements
Similar presentations
GCC BUILDING SECURITY PROCEDURE STAFF TRAINING. Why is security so important? Burglary Burglary Vandals Vandals Loss of facility Loss of facility Cost.
Advertisements

1 The document represents the EMSWGs response to recommendation #12 o TOPs should take measures to ensure that their real-time tools are adequate, operational,
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
Coursework Requirements Numerical Methods. 1.Front Cover indicating that the coursework is about the numerical Solution of Equations. Include your name,
CENTRICITY PERIOPERATIVE ANESTHESIA Oregon Health & Science University, Portland, Oregon Stephen T. Robinson, MD Associate Professor of Anesthesiology.
1 Parker Factory Display – The Next Generation Next Generation:
Information System protection and Security. Need for Information System Security §With the invent of computers and telecommunication systems, organizations.
ERCOT Nodal Protocols Telemetry Requirements Proposal
Industrial Radiography
Telemetry system datavend.
NERC Lessons Learned Summary March NERC lessons learned published in March 2015 Two NERC lessons learned (LL) were published in March2015 LL
Chapter 9: Introduction to the t statistic
NERC Lessons Learned Summary
Peak RCCo Performance Metrics Draft –November 2013.
NLDC 1 SCADA-Functions Author, Vineeta Agarwal Place PSTI, Bangalore Date
PSEN Server Balance EN/ICE Procedures Jean-Charles Tournier EN/ICE/SCD 09-September-2015.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Evaluation of the XL Routing Algorithm in Multiple Failure Conditions Nguyen Cao Julie Morris Khang Pham.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
MP Failover DNS Option 1 for API Failover The same DNS structure that allows ERCOT to fail over services between sites can also be used to allow MPs to.
Virtual 8086 Mode  The supports execution of one or more 8086, 8088, 80186, or programs in an protected-mode environment.  An 8086.
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
NERC Lessons Learned Summary LLs Published in September 2015.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Chapter - Continuous Control
1. 2 INDEX MAIN DISPLAYS3-4 SYSTEM LAYOUT 5-6 ROOM P-109 DISPLAY7 ROOM P-108 DISPLAY8 ROOM P-107 DISPLAY 9 ROOM P-106 DISPLAY 10 ROOM P-105 DISPLAY 11.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
9.5 Alternating Series. An alternating series is a series whose terms are alternately positive and negative. It has the following forms Example: Alternating.
CMS NET USER GROUP MEETING. TOPICS  PEND/DENY INDICATOR  PANELING CMS NET USER GROUP MEETING.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Comparing Two Proportions Chapter 21. In a two-sample problem, we want to compare two populations or the responses to two treatments based on two independent.
EDS 2 Early Delivery Systems Approach March 2007.
GPS Receiver Client Location Based Attendance App Employee CMSS GIS SERVER GIS Database Geo-Tagging Geo-Tracking Location Based Attendance System.
MSA Passport  Personal Alarm Combustible gases and vapors Oxygen enriched Oxygen deficient Specific Toxic gases Alarm levels are set at the factory.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
TAX ROLL PROCESSING – ASSESSMENT ADMINISTRATION 1 SACVI AA A A ROLL PROCESSING.
Information Systems Security
NERC Published Lessons Learned Summary
Sentinel Battery Monitoring Systems protecting your power supply
NERC Published Lessons Learned
Manufacturing Productivity Solutions
NERC Published Lessons Learned
Industrial Radiography
Performance monitoring framework for the technical infrastructure
NERC Published Lessons Learned
Visualized Production Efficient Collaboration
E1 Protection Fail-over Switch
Data quality, or how to keep afloat in the growing data flood
How SCADA Systems Work?.
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Dept. of Nuclear and Quantum Engineering
Not able to Find Videos on TV Screen with Roku Streaming Player. Here's guide for you.
Oracle9i Database Administrator: Implementation and Administration
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Hazardous Gas Alarm System
Square and Cube Numbers
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Digital Chart Recorder Operation
Real World Control Failures : Merrill Lynch
PEAK’s RMTNET Tool Sarma (NDR) Nuthalapati, Principal NetApps Engineer
(name) (number) Hazard Analysis and Risk Assessment Operations
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Countries with Discrepancies Between National and International Data
WIAB WECC Interchange Authority Backup
IDENTIFY PROBLEM EVALUATE PLAN ACTION ACT.
CSC Shift Training and Operation + B904 Status
Presentation transcript:

TOP-010-1(i) Implementation PEAK RC Users Group Meeting 5/3/2018

R1 & R2 PacifiCorp defines data quality criteria as: Telemetry Failure Reasonability Limit (outside defined bounds) Backup Value Manual Entry or Alarm Override Questionable Value (percentage bad data) Discrepancy Between Telemetry and State Estimation Above indications displayed in SCADA and on alarms pages for operator visibility Primary procedure has been implemented which defines operator actions and which references additional procedures for each type of error

R3 PacifiCorp defines Real Time Assessments as: State Estimator (SE) PAC Real Time Contingency Analysis (RTCA) PEAK RTCA (alternate) SCADA one lines and calculations SCADA alarm process Data quality indications include SE or RTCA failure to converge Increase in the total number of “E” flags SCADA point quality indications Alarms Primary procedure has been implemented which defines operator actions and which references additional procedures for each type of error

R4 PacifiCorp has an independent process to monitor the alarm process (Sentinel Remote Terminal Unit (RTU)) in both active and standby servers Alarm process cannot be used to alarm for itself A red strobe light flashes in the control room when the independent process determines that the alarm process has failed Operator actions are to immediately contact technical support.