New York City Master Plan Update

Slides:



Advertisements
Similar presentations
59 Main Street, West Orange For BOMA/TOBY April, 2007.
Advertisements

City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Facilities Modernization Program Funded by Measure B Project Report December 17, 2012.
Hospital of the Future Construction Update as of Dec. 3, 2010.
CAMPUS MASTER PLAN. Goals To provide the up-to-date facilities that will enhance the quality of student life To redesign the campus so it reflects the.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Construction Update September 2014 Madison Elementary School District.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
MENDOCINO COLLEGE MASTER PLAN Mendocino College Faculty and Staff Presentation December 10, 2008.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Rebuild Stafford High School Update- October 2014.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
AIMHO11/12/2013 RENOVATION.  1550 on-campus beds  650,000 square feet  Facility occupancy range  3 year live on – requirement  3 housing types.
Wayfinding & Signage Update Management Information Forum April 21, 2013.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Community Update James Simons School – October 2,
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
University 101 Dr. Carol Wolf - Professor Cynthia Fox - Peer Advisor.
Elevations.
Hotel Comparison! Milford Plaza at Times Square & Hilton Times Square.
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District Septmeber 24, 2009 EDUCATE  ENGAGE.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Feasibility Study Update – April 23 th, Agenda and Goals 1.Review Design Values 2.Review Program Elements 3.Review Design Strategies 4.Review Next.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
MSU/MCTC Law Enforcement and Criminal Justice Center March 10, 2010.
59 Main Street, West Orange For BOMA/TOBY April, 2007.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Winchester Medical Center Campus Expansion June 21, 2011.
Industry Park & Ride Project Update. Industry Park & Ride Construction completed on time and under budget Parking structure opened to public on October.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Department of Aerospace Engineering and Mechanics University of Minnesota Akerman Hall Hangar Renovation Gary J. Balas, Head Distinguished McKnight University.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
USF System Campus Master Plan Updates October 20, 2015 St. Petersburg.
Wellspring Medical Center Clark/Kjos Architect, LLC.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
Willard and DiLoreto Hall Renovation and Addition
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Click here for the LIVE WEBCAM
Cambrian School District March 19, 2015
2006 Facilities Master Plan Update Cañada College
Charlotte Douglas International Airport
1. Neighborhood Safety Program 2. ICS traffic and security 3
Penn Medicine Chester County Hospital
Renovation & Expansion
Campus Construction Projects
Facilities Update November 17, 2017
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Vice President, Facilities & Capital Projects
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
Carleton College Summer 2018 Science and Campus Construction Plan
Facilities and Capital Projects
2012Exhibition of School Planning and Architecture
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
North Augusta High School – Phase 2A and 2B
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

New York City Master Plan Update

NYC Master Plan Goals Create a distinct identity for Lubin at 1 Pace Plaza – our flagship building Create a distinct identity for Dyson at historic 41 Park Row Create a new student center for student success Create a new exterior identity for 1 Pace Plaza Create new forms of learning and research spaces WWW.PACE.EDU/NYC-MASTER-PLAN

Phase 1 - The Student Landscape Address the first impressions of the campus, improve visitor and student experience Renovate first floor (west) of One Pace Plaza to create a new Student Union, study areas, and student commons; a new Welcome Center and Spirit Store; new Lubin branded entrance through the courtyard on B-Level with a Lubin learning lab and new Admissions Suite. Design renovations to the Plaza including stairs, ramps, plantings 9 Spruce Street Entrance 1 Pace Plaza – Lubin Lobby, Grand Staircase

Phase 1 - The Student Landscape Renovate lower level and 1st and 2nd floors of 41 Park Row to create a new art gallery, student commons, Dyson advising suite and faculty colloquia 41 Park Row – 1st Floor Commons 41 Park Row – Art Gallery

Phase 1 – Construction Update 1 Pace Plaza and 41 Park Row curtain wall installation has been completed Terrazzo flooring is complete at 1 Pace Plaza Enrollment Management Suite - glass fronts and partitions is in place 1 Pace Plaza 1st Floor glass fronts and partitions are in place New stair and plaza construction is underway Fire Alarm Installation at 41 Park Row is underway. Fire installation in 1 Pace Plaza complete Ceiling lighting fixtures installation is in progress Courtyard pavers installation is complete Upcoming Milestones 9 Spruce Street Entrance changes Bowtie Ceiling Construction at 1 Pace Plaza 1 Pace Plaza Inspections AV, Signage and Furniture Installations

Phase 1 - Construction Schedule Upcoming In Progress Completed

1 Pace Plaza, 1st Floor October 2018

1 Pace Plaza, 1st Floor, Student Union October 2018

1 Pace Plaza, 1st Floor, Study Nooks October 2018

1 Pace Plaza, Lubin Entrance October 2018

1 Pace Plaza, Lubin Lobby October 2018

Enrollment Management Suite October 2018

Enrollment Management Suite October 2018

41 Park Row 1st Floor Art Gallery September 2018

41 Park Row 2nd floor Lounge Area September 2018

41 Park Row 2nd floor Dyson Colloquia October 2018

41 Park Row 2nd floor Advising Suite October 2018

1 Pace Plaza, Entrance Change October 2018

Renderings Appendices

1 Pace Plaza Student Landscape

1 Pace Plaza First Floor Entrance and Donor Wall

1 Pace Plaza First Floor Student Center

1 Pace Plaza First Floor Student Commons

1 Pace Plaza First Floor Student Collaborative Study Area

1 Pace Plaza First Floor Welcome Center

1PP Lubin Lobby and Admissions Suite

1 Pace Plaza Lubin Entrance

Grand Stair connecting B level and 1st floor

One Pace Plaza Lubin Graduate Lounge

Lubin Virtual Lab

41 Park Row Exterior

41 Park Row First Floor and Lower Level

41 Park Row First Floor

41 Park Row Art Gallery

41 Park Row Second Floor

41 Park Row Second Floor – Dyson Commons