Draft 2018 Project Priorities

Slides:



Advertisements
Similar presentations
14th Ave. S. at the South Park Bridge
Advertisements

Human Powered Delray All Streets should be complete streets February 5, 2015 FDOT Transportation Visioning.
Traffic Incident Management Policies and Strategies in Queensland Joanna Robinson, Director (Traffic Systems & Road Use) Viki Watson, Principal Advisor.
- 212 miles northwest of Miami miles southwest of Orlando Sarasota is located on the West Coast of Florida, about 60 miles south of Tampa.
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
Harlan to Hazard Study Public Workshop #2 Harlan to Hazard Study Public Workshop #2 Harlan, Leslie, & Perry Counties, KY December 2003 Harlan, Leslie,
Titusville to Edgewater Bike Loop PD&E Study
Santa Maria River Bridges Widening. Project Location.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
Metropolitan Transport Strategy The next step – a visual context January 2006 Local Government Association of South Australia.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
January Transportation Economic Outlook.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Draft Unified Planning Work Program for SFY April 1, 2015-March 31, 2016 Program Dashboard Released for PFAC Action on January 22, 2015 Program Dashboard.
River to Sea TPO CAC A Presentation to: May 19, 2015.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Welcome to Sarasota/Bradenton.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
2014 TOP TEN. 10 Federal Highway/Federal Transit Certification Noteworthy Practices:  Strategic Planning process and priorities  Complete Streets.
South Bedfordshire District Council Sustainable Development Services Away Day Transport Strategy performance update Manouchehr Nahvi Tuesday 8 th April.
Tampa Bay Area Devin Taylor – s/v Moosetracks SSCA 2012 Florida West Coast Gam Isles Yacht Club October 23, 2010.
Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October.
Traffic safety & Operations Laboratory Traffic safety & Operations Laboratory DC MPD DC MPD March 2009 Traffic Simulation of Chartered Bus Operation Plan.
The Main Street Bike Lane Project LADOT Bike Program.
DRAFT Unified Planning Work Program for State Fiscal Year (SFY) April 1, 2016-March 31, 2017 Program Dashboard for Public Review November 16, 2015 Program.
Kyle Hilsendager, Ph.D. 1.
The developments in Milan’s sustainable transport initiatives to reduce air and noise pollution Maria Berrini - CEO, Milan Mobility Environment and Territory.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Welcome Learning for Living and Working in London 12 May 2008 Neil Roberts London West LSC.
Cycling Scotland Presentation
PRIORITIES FOR THE DEVELOPMENT OF THE TRANSPORT INFRASTRUCTURE OF THE REPUBLIC OF BULGARIA 2014 – 2020 Anita Angelova National Transport Policy Directorate.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
T.I.C. - Today and in the future Charlotte von Scholten Head of the Traffic Information Centre.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
E X P E R I E N C E Y O U R A M E R I C A Transportation Study for Bodie Island National Park Service U.S. Department of the Interior Cape Hatteras National.
 The Pedestrian Plan is:  Long Range and Comprehensive  Conceptual  A Vision for the Future  The Plan is not:  Regulatory or Binding  A Master.
A combination of heavy rain and high freezing levels A November to Remember.
SOUTH TYNESIDE INTEGRATED TRANSPORT STRATEGY Presentation to East Shields Community Area Forum, 21 st February 2008 Transport Futures.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
Australian Road Federation November Meeting Our Transport Challenges (MOTC) Meeting Our Transport Challenges (MOTC) sets out a strategic, long term.
Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010.
Arizona Forward Update
Travel Patterns & Fares
Geography of the Koreas
21st Century Transportation Committee Finance Subcommittee
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Technical and Public Advisory Committee Meeting #3
Work Zone Safety Review – District 1 - Duluth
Grey County Transportation Master Plan
Metropolitan Planning Organization
A Presentation to: River to Sea TPO Board May 27, 2015.
Maps Ch. 1 Lesson 1.
Session 2D: Road Safety Audit Workshop, 10 July 2018
5252 South Tamiami Trail, Sarasota, FL
استراتژی های مدیریت تغییر
Bridge disaster in Minnesota
TELL THE TPO Community Transportation Survey
Hampshire County Council Countryside Access
DRAFT (MOVE $100M) FUNDING CATEGORY WEST ($ IN BILLIONS)
“The North Crossing” Accessible Connection from Rideau Heights to Kingscourt and the Downtown.
Putting Crisis Management to Work – An experienced view
Statistical overview of approved INTERREG IIIC operations - All zones - July 2005.
Bowling Green Scottsville
Student Center A South: Inaccessible Element
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Presentation transcript:

Draft 2018 Project Priorities Sarasota/Manatee Metropolitan Planning Organization April 9, 2018

Continued Projects 2018 2017 Desoto Bridge River Road 15th Street East Complete Streets Legacy Trail April 2018

Central Manatee Network Alternatives Analysis (CMNAA) April 2018

Desoto Bridge April 2018

Barrier Island Traffic Study (BITS) NORTH STUDY AREA SOUTH STUDY AREA Zone 1: Anna Maria Holmes Beach Zone 2: Coquina Beach Bradenton Beach Zone 3: Longboat Key St Armands Lido Key April 2018

Automated Traffic Management System (ATMS) April 2018

Strategic Intermodal System (SIS) April 2018

Road Safety Assessments (RSA) April 2018

Partner Priorities April 2018

Discussion April 2018