Designing Technical Reports

Slides:



Advertisements
Similar presentations
Accident and Incident Investigation
Advertisements

Definitions and Classification: Background Reports
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Transportation Tuesday TRANSPORTATION TUESDAY Summer heat is bad for your vehicle!! Under normal weather conditions you sometimes might drive into a difficult.
AUDIT REPORT WRITING The primary purpose of any writing, whether formal audit report or a brief memo is to communicate a message to a reader. Robert.
Human Supervisory Control Human-Centered Systems Engineering Design Approaches Massachusetts Institute of Technology.
A NALYZING AND P ERSUADING THE A UDIENCE AUDIENCE Every audience expects a message tailored to its own specific interests, social conventions, ways of.
Report Writing Unit III. What is a business report?  A business report is an oral presentation or written business document that provides information,
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Failure Modes and Effects Analysis A Failure Modes and Effects Analysis (FMEA) tabulates failure modes of equipment and their effects on a system or plant.
Accidents Happen But Nuclear Accidents Require Special Skill!
MIS 5241 Three Mile Island What Happened, What Worked, What Didn’t.
Designing Technical Reports Your work in an organization is USELESS unless it causes some effect. To have an effect, you must communicate, and your communication.
TIPS ON WRITING AN ABSTRACT Presented by: Vernal G. Alford III, P.E. Adjunct Associate Professor and Director of Outreach College of Engineering, NC A&T.
Nuclear Power Dylan Waybright Kendall Caminiti Gina Raimondo Susan Ellington Paige Urbanovsky.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
Automotive Algebra Maintaining the cooling system Using Algebra for a simple solution Joe Agruso,Xochitl Molina.
Company duties under the ISM Code
Derek Venhuizen 3 MILE ISLAND Nuclear_Generating_Station_Unit_2.jpg.
Nuclear Power as a High Risk System And the Accident at Three Mile Island Discussing Perrow Chapters 1 and 2 Presented by Gus Scheidt Friday the Thirteenth.
Daniel Stewart.  Accidents in a nuclear plant can range from minor emissions of radioactivity to catastrophic releases such as: - widespread radiation.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
By Matt Douglass.  The Three Mile Island accident was a partial nuclear meltdown which occurred in one of the two Three Mile Island nuclear reactors.
Worldwide Commercial Energy Production. Nuclear Power Countries.
The NATS Review of ATM Occurrence Reporting Prepared for ICAO European Region Aviation Safety Seminar/Workshop (Baku, Azerbaijan, 5 -7 April 2006) by Jane.
Week 3 Outline Post-Mortem By: Jamaral Johnson. 2 After Actions Review In this presentation I will do my best to highlight what went wrong. This is just.
Chapter 5 Analyzing Your Audience and Purpose. Three steps in analyzing an audience: 1. Identify primary and secondary audiences. 2. Identify basic categories.
Writing Purpose Statements Dr. Susan Codone TCO 341.
INFORMAL REPORTS. 2 SPECIFIC GUIDELINES 3 III. SPECIFIC GUIDELINES TYPES of INFORMAL REPORTS A. Problem Analyses B. Recommendation Reports C. Equipment.
Failure Modes and Effects Analysis A Failure Modes and Effects Analysis (FMEA) tabulates failure modes of equipment and their effects on a system or plant.
Career Education Interview Submitted by:Rebecca Joyce Interview conducted with David Joyce Submitted on: November 2, 2015.
Proposals Prof. Z. Lewis.
Ta’Juan Dutrieuille November 4, 2009 Period 1
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
PPA 502 – Lecture 9b How to Communicate Evaluation Findings.
In-House Memo Reports Reporting to Colleagues The Cain Project in Engineering and Professional Communication ENGINEERING SERIES.
© 2008 Pearson Education, Inc., publishing as Longman Publishers. 1 Chapter 3 Delivering Usable Information Technical Communication, 11 th edition John.
© 2010 Pearson Education, Inc., publishing as Longman Publishers. Chapter 4 Designing and Delivering Usable Information 1 Strategies for Technical Communication.
Coal-Fired Plant Coal is conveyed to boiler In primary water loop, water is boiled into steam Steam is sent through turbine Turbine spins the generator,
PUBLIC SCHOOLS NSWWWW.SCHOOLS.NSW.EDU.AU Australian Curriculum K-10 The nature of historical inquiry in schools.
Learning Objective Chapter 12 Using Reports and Proposals Copyright © 2001 South-Western College Publishing Co. Objectives O U T L I N E Types of Reports.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Pipeline Safety Management Systems
Introduction High Voltage!!.
The Three Mile Island The Biggest Nuclear Accident in the U.S.
Jan 2016 Solar Lunar Data.
- Condensate pump and feed pump trip!
Employee Self Service – HRS Unclassified Leave
Presentation on Software Requirements Submitted by
How SCADA Systems Work?.
UltiPro Change Agent Network
By: Brandy Lathrop December 6th 2016 December 16th 2016.
It’s important to have one… sometimes...
Technical Writing - the memorandum
How to Diagnose a Faulty Radiator Pressure Cap
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Which Parts Get Affected Due to a Bad Radiator
Hazard Communication and GHS General Carl Albert State College
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
leaks thru rupture sticks open closed
OHWARN Workshop Disruption of Service Rule Update
مدیریت عدم انطباق Nonconformity Management
- Condensate pump and feed pump trip!
Discussion of OBD2 by “Correspondence Group” Japan’s proposal
CYCLE 2019 Application Process & Timeline
Report Writing Unit III.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Supplier Webinar: IBM PCD Data Collection Process Changes & New Version of IBM’s Product Content Declaration(PCD) Form February 21 and 26, 2019 This.
Bella Vista Fire Department Procedures on Sprinkled Buildings
Presentation transcript:

Designing Technical Reports Your work in an organization is USELESS unless it causes some effect. To have an effect, you must communicate, and your communication must: 1. Get to the people who need it 2. Be persuasive From: “Designing Technical Reports” by J.C.Mathes, Dwight Stevenson, 1991, Macmillan Publishing

Designing Technical Reports

Designing Technical Reports Who needs your report? Identify your audience.

Types of Audiences Primary – act or make decisions Secondary – affected by actions and decisions Immediate or Nominal – transmit or route reports or contents

How Readers Behave Person addressed may not be real audience Readers may not be experts Report will not have finite lifetime Readers will not be familiar with situation Readers have not been discussing topic Readers are not awaiting your report Readers do not have time to read Readers do not share your concerns

Defining Communication Purpose State the organizational problem State the investigation State your purpose Use a verb that indicates the response you expect Statement of purpose may come first Do it up-front, succinctly!

Organizational Need or Problem A problem is a gap or conflict between “ideal” and “real” Examples: “Underwriters Laboratories has published a standard concerning hook-up of AC power to chassis mounted connectors. However, this standard differs from our present wiring standard and creates a potential safety problem for users of instruments we fabricate.”

Organizational Need or Problem “Due to its high freeze point (158F), biphenyl must be heated to near its flash point (223F) before handling is possible. Even then its vapor pressure is low. Priming a pump to top-load a tank car under these conditions is very difficult.” Note the conflict between “ideal” and “real”

Organizational Need or Problem Improved statements of problem: “We must follow the new UL specification. However, if we follow the new specification, we will create a potential safety problem for users of our instruments.” “We are required to top-unload tank cars carrying biphenyl. However, we can do so only if we heat the biphenyl to dangerously near its flash point, and even then the pressure is too low for effective unloading.”

Note active voice (“Bob asked me”, not “I was asked”) Investigation Examples: “Consequently, Bob Liggett asked me to submit a plan on how the laboratory’s existing instruments can be brought into conformity with the UL-817 standards.” “The legal department asked Operations to determine whether this was a part failure or an operator error.” Note active voice (“Bob asked me”, not “I was asked”)

Communication Purpose Examples: “This report is designed to aid the Software Development Division in understanding and using the Comprehensive Test Package.” “Accordingly, the contractor requests that these Quality Deficiency Reports be retired.”

A Simple “Schematic” for Reports Organizational problem: “(A fact or goal)______________; however, (a conflicting fact or goal) _________________” Investigation: “Consequently, I did X (or Smith asked me to do X).” Communication Purpose: “The purpose of this (document type) _____ is to (writer’s purpose) _________________ so that (reader’s purpose) ___________________.”

Bad Example Three-Mile Island nuclear incident: 1977 Sept 14, Davis-Besse nuclear plant in Ohio had a core coolant valve stick open. Pressure dropped, water boiled. Emergency high-pressure injection automatically activated. Pressure went back up, so operators shut off emergency coolant, even though valve was still stuck open. 1977 Oct 23 it happened again. 1977 Nov 1, engineer J.J.Kelly investigated and wrote memo recommending operator instruction changes 1978 Feb 9, B.M.Dunn, Emergency Coolant System Analysis Department manager wrote memo

TMI 1978 Aug 3, D.F.Hallman, Plant Performance Services manager responded to Dunn memo with another memo. 1979 Mar 28, Three Mile Island nuclear plant in Pennsylvania had the same problem as Davis-Besse, only when running at full power. 1979 Apr 4, new operator instructions were issued.