Gustavo Rahmer ETS - CTIO

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k VIRGO detectors Largest ever such system.
256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k Raytheon VIRGO detectors Largest ever such system Leander H. Mehrgan.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Laboratory for SoC design TEMPUS meeting Niš,
CTIO Blanco WF Imager Data Acquisition Jon Thaler Fermilab, Dec. 6, 2003.
Tony Brett, OUCS 24 th June th ITSS Conference The Portable Private Teaching Network Tony Brett Associate Head of IT Support Staff Services Oxford.
MONSOON Image Acquisition System Configuration “Managing complexity” Cerro Tololo Inter-American Observatory National Optical Astronomy Observatory G.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
IFIN-HH LHCB GRID Activities Eduard Pauna Radu Stoica.
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
September 22, 2009GONG H-alpha Review1 Data Acquisition System (DAS)
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
Clock Board Test and Preliminary Acceptance Criteria Ciemat (Madrid), April 2009 Juan de Vicente, Javier Castilla, Gustavo Martínez.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
A. Monfardini, IAP 30/07/ NIKA (Néel IRAM KID Array) First light at the 30-m IRAM dish NIKA collaboration: - Institut Néel - Grenoble - AIG - Cardiff.
Status Review Dec. 1, 2003 Mark Hunten MONSOON Project Manager NOAO MI Program.
Network Setup Assignment Chris Moore, Kwan Tonpoobaln, Jon Light.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
CKM Data Source System CKM Electronics Group July 2003.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
UV - Visible Systems Peter Moore AURA / NOAO / ETS.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
1 Leiden, November 20-21, 2001OAC ASTROWISE TEAM OAC WP4: OAC BeoWulf Hardware choice criteria : physical space problem flexible configuration cope with.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
GBT-FPGA Interface Carson Teale. GBT New radiation tolerant ASIC for bidirectional 4.8 Gb/s optical links to replace current timing, trigger, and control.
Xilinx Confidential Unpublished Work © Copyright 2012 Xilinx ZYNQ PetaLinux Guide.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 NGC controller Leander Mehrgan.
H-RORC HLT-Meeting CERN 02/06/05 Torsten Alt KIP Heidelberg.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
17 October 2002Electronics DivisionViraj Perera RAL TCM, GIO, CAN & TTCRx Adam Davis.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
EXtreme Data Workshop Readout Technologies Rob Halsall The Cosener’s House 18 April 2012.
How to get Balsa running on a Windows computer
UN Core Pre-Deployment Training Materials 2017
INSIDE in-beam PET system assembly and test at INFN Torino
Server pschiu.
Instrument Control Systems 2014
TripleSpec 4 Status and Coming Steps
GBT-FPGA Interface Carson Teale.
Manchester HEP group Network, Servers, Desktop, Laptops, and What Sabah Has Been Doing Sabah Salih.
Front-end digital Status
Mark Hunten NOAO MI Program
Christophe Beigbeder/ PID meeting
NOAO MONSOON Image Acquisition System Concept Design Review
تدريس يار: ميثم نظرياني
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
SIDECAR ASIC Characterization Dan Pontillo
first light! new laser driver board (revD)
Background Developed by Teledyne Scientific & Imaging, LLC
MONSOON Status Barry Michael Starr 11/22/2018.
The MONSOON Generic Pixel Server Software Design
The Generic Pixel Server (GPX) Dictionary
Oracle HFM Implementation Boot Camp
MONSOON Software Design & Status
GLAST Large Area Telescope
MONSOON Software Design & Status
Data Transmission System Digital Design Chris Langley NRAO
DCM II DCM II system Status Chain test Schedule.
Bell Ringer A figure has vertices A(2,2), B(6,4), C(-2,3), and D(-1,5). The image of this figure is a rotation of 90° clockwise. What is A’? What is.
Readout Systems Update
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
SIDECAR ASIC characterization
Presentation transcript:

Gustavo Rahmer ETS - CTIO MONSOON Project @ CTIO Gustavo Rahmer ETS - CTIO

CTIO involvement in MONSOON Early stages (pre-PDR) Collaboration in core documents DHE Backplane ICD Development stage (post-PDR) IR Clock&Bias Board: design, assembly and tests CCD 8-channels Acquisition Board: design ready Lab system for a Hawaii-2 mux Next on the horizon MONSOON CCD Lab System in La Serena

CTIO resources for MONSOON Gustavo Rahmer (EE): 100% Ricardo Schmidt (EE): 10% (consultant) Michael Warner (EE): 10% (consultant) Electronic Technician: 50% (when needed)

CTIO Lab System PC 1GHz, 512Mb RAM, 10Gb HDD, Linux Systran SL100 Fiber link: PCI to CMC Detector Head Electronics: Master Control Board IR Acquisition Board (36 ch) IR Clock&Bias Board Xilinx Development Tool in laptop In-System Programming link

CTIO Lab System - DHE

CTIO Lab System – Board Tests

CTIO Lab System – Board Assembly

CTIO Lab System – Test Setup

MONSOON South Demonstration Hawaii-2 bare mux: loan from ISPI project had been characterized using SDSU controller 4 channels @ 330 Kpix/s Goal: verify functionality, produce an image Sequencer patterns were translated from actual patterns used in ISPI First light obtained in September 5 (3 weeks after Aladdin@Tucson)

System Demonstration – First Light

System Demonstration – First Light