Introduction Presentation about the participation

Slides:



Advertisements
Similar presentations
Introduction Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project Salechard.
Advertisements

Customer Relation Management System Multi Environment Solutions.
Company Presentation 2013 Technical Office for Designing, Calculating and Engineering of the Power Plant Facilities DESIGNING AND ENGINEERING OF STEEL.
Czech Technical University in Prague Faculty of Civil Engineering Department of Microenvironmental and Building Services Engineering Czech Technical University.
Design of Concrete Structure I Eng. Tamer Eshtawi First Semester 2008 Eng. Tamer Eshtawi First Semester 2008.
Nuclear Power Turkey Point Power Plant Process. Turkey Point Power Plant Built on 12, 700 acres in Homestead Opened in 1972 Cost to build both reactors.
ENGINEERING Company Presentation. INTRODUZIONE TCS was born in It has been founded by a group of experienced professionals in order to furnish engineering.
9. Storage Tanks.
1 Topic I.7. Pipelines: Kinds, Structures, Construction and Testing Definition: Pipes, transmitting water from the intakes to the service (distributing)
Linear Buckling Workshop 7. Workshop Supplement Linear Buckling August 26, 2005 Inventory # WS7-2 Workshop 7 - Goals The goal in this workshop is.
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005.
BLM National Training Center HYDRAULIC DESIGN PART 2.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
Pipe and Tube Thickness BGBataller Instructor 7, ChE Dept CEAT-UPLB.
RETAINING STRUCTURES. Theories of lateral earth pressure will be used in this chapter to design various types of retaining walls. In general,
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
1. By Dr. Attaullah Shah Swedish College of Engineering and Technology Wah Cantt. CE-401 Reinforced Concrete Design-II.
Theories of lateral earth pressure will be used in this chapter to design various types of retaining walls. In general, retaining walls can be divided.
The European Health Care Information and Clearing Centre Jiří Kofránek, Petr Zinek, Petr Sláma Charles University, Prague & Ministry of Health, Czech Republic.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
EWB-MAP Water Tank Project Construction Progress June 5-12, 2012.
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
Unit 2 Terms & Definitions.  Legal requirements designed to protect the public by providing guidelines for structural, electrical, plumbing, and mechanical.
JC Equipments Pvt. Ltd Heat Exchanger Manufacturers
Pipelines DYSTIFF s.r.o., Olomouc. Revamping of the Vacuum Distillation Unit Piping stress and strength calculation of 30 pipelines according to B31.3.
Bridge Standards & Practices Bridge Design & Drafting Manual (BDDM) Bridge Drawings Upcoming Bridge Training.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Mechanical Design of Process Equipment
Refrigeration Plant Design – Progress Report 1 Kevin W. Hunter MANE-6980 Engineering Projects.
PRESENTED BY: J.MIKE TYSON S.RAVIKUMAR S.SAKTHI M.SATHISHKUMAR.
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
OECD Model Tax Convention on Income and on Capital For the purpose of eliminating double taxation, the Convention establishes two categories of rules:
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
PILE CHECK A NEW DYNAMIC PILE TESTING SYSTEM GEORGE GOBLE GOBLE PILE TEST.
THE PARLIAMENT How does it work?. Review: Parliament is the ______ branch… … at the ______ level.
Progress presentation
PANAMA CANAL THIRD SET OF LOCKS PROJECT Structural Design
PLAN Square Base Plate, A1, in2 Finding Size of Plate ( __in x __in) FINDING THICKNESS OF PLATE (__in) Square Concrete Pedestal, A2, in2 Basic Sizing of.
Information Flow Diagrams Additional Exercise 2 ANSWERS.
Pressure A measure of the amount of force exerted on a surface area A measure of the amount of force exerted on a surface area.
Design Process 1.Selection of the type of structural form to be used and the material out of which the structure is to be made. 2.Determination of the.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Submitted By:Supported By: Suresh Chandra Jangid Branch: - Mechanical (IInd yr. )
DESIGNING AND ENGINEERING OF STEEL CONSTRUCTIONS
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
PDEs in shells; Example: current conduction in a steel tank
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
V VENTURI SEPARATORS STEAM.
Status and Progress of NSW HUB and Extension
Power Transmission Case Study
STRUCTURAL ENGINEERING Session 04
Claims Reporting Workflow
Pool-3 Kick-off workshop 2013
Graduation Project – 2 Mini-Mall
SAGAR INSTITUTE OF RESEARCH & TECHNOLOGY- EXCELLENCE
Basic Reservoir Engineering (Code: AR03)
CE-401 Reinforced Concrete Design-II
O2 Duo Mobil Prague, April 3, 2007.
Federation System of the Russian Federation
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Piping and Instrumentation for Process Industries
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Title Company: *****Give the name of your company/organization and that of supporting companies**** Author(s): ****This is especially important for the.
Introduction to Home Networking
Presentation transcript:

Introduction Presentation about the participation of the company FEST Engineering Ltd. on the project „Salechard“ Introduction

Basic details about project Name of the project: TEC Polyarnaja, Selechard, The Russian Federation Purchaser: Fans, a.s. Assignment: Strength - dilatational analysis of steam pipeline DN 5800 Create a project and production documentation of the main supporting steel structures Stress analysis of condensate and siphon tanks with SO02- Skid and SO01 Beginning of works: April 2012 End of works: June 2013

The list of work Stress analysis of the steam (determining the wall thickness of steam pipeline in the places storage and outside these storage, determining a fixed point and sliding storage in dependence on the connection to the steam turbine and the steam chamber) Calculation of forces acting in the places storage of steam piping on supporting steel structure (determining the shifts in these places) Strength - dilatational analysis of process piping, which is stored on its own steam pipeline and then on the supporting steel structures + determining the geometry and store these piping (cca. 50 pc.) Proposal store the steam pipeline on the main supporting steel structures and determining responses to the iron-concrete foundation of the substructure Create a project of the main supporting steel structuresfrom primal studies through to final production documentation. This part of the project specifically related to object of steel supports OH1÷OH6, main supporting steel structure of steam chamber SO03, technological object SO02-Skid and all auxiliary steel structures located in this objects or directly on the steam pipeline Static analysis for all already mentioned main and auxiliary steel structure Stress analysis of condensate and siphon tanks with SO02-Skid and SO01 Projection and production documentation of condensate and siphon tanks with SO02-Skid and SO01 Stress analysis of the steam chamber stored on the steel structure SO01 Creating the overall disposition of the steam piping DN including supporting steel structures and determination the borders of supply

Stress analysis of the steam pipeline determining the wall thickness of steam pipeline in the places storage and outside these storage determining a fixed point and sliding storage in dependence on the connection to the steam turbine and the steam chamber

Calculation of forces acting in the places storage of steam piping on supporting steel structure determining the shifts in these places

Strength - dilatational analysis of process piping Which is stored on its own steam pipeline and then on the supporting steel structures + determining the geometry and store these piping (cca. 50 pc.)

Proposal store the steam pipeline on the main supporting steel structures determining responses to the iron-concrete foundation of the substructure

Create a project of the main supporting steel structures from primal studies through to final production documentation This part of the project specifically related to object of steel supports OH1÷OH6, main supporting steel structure of steam chamber SO03, technological object SO02-Skid and all auxiliary steel structures located in this objects or directly on the steam pipeline

Create a project of the main supporting steel structures

Static analysis For all already mentioned main and auxiliary steel structure

Stress analysis of condensate and siphon tanks with SO02-Skid and SO01

Projection and production documentation of condensate and siphon tanks with SO02-Skid and SO01

Stress analysis of the steam chamber stored on the steel structure SO01

Creating the overall disposition of the steam piping DN 5800 including supporting steel structures and determination the borders of supply

Office Pardubická 244 535 01 Přelouč Czech Republic Telephone: +420 466 052 521 Fax: +420 466 263 286 E-mail: info@fest-engineering.com ID: 29060851 VAT ID: CZ683143887 Head Office FEST Engineering Ltd. 6 Bexley Square Salford, Manchester, M3 6BZ Great Britain Branch manager Ing. Jiří Košťál