TGs Process Date: Authors: January 2005 January 2005

Slides:



Advertisements
Similar presentations
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Advertisements

Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /207r0 Submission March 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Mesh Networking Task Group Process
TGu Timeline Date: Authors: March 2006 March 2006
[ Interim Meetings 2006] Date: Authors: July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
TGs Closing Report Date: Authors: January 2006 January 2006
TGs Process Date: Authors: November 2005 November 2005
Waveform Generator Source Code
TGs Process Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: November 2005
TGs Montreal Closing Report
TGs September 2005 Mid-week Report
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Motion to accept Draft p 2.0
TGs Process Date: Authors: September 2005 September 2005
TGs January Final Report
[place presentation subject title text here]
[place presentation subject title text here]
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGp Closing Report Date: Authors: May 2007 Month Year
[place presentation subject title text here]
TGu Timeline Date: Authors: March 2006 March 2006
TGs Melbourne Closing Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGs Process Date: Authors: March 2005 March 2005
TGs San Diego Closing Report
TGs July Closing Report
TGs Process Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2005 July 2005
TGs Process Date: Authors: March 2005 March 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
IEEE White Space Radio Intended timeline
TGs Process, July Date: Authors: July 2006 July 2006
TGs January Final Report
TGs Dallas Closing Report
TGu Timeline Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November Opening Report
TGu Process Date: Authors: January 2005 January 2005
Liaison Report From Date: Authors: Month Year
Draft P802.11s D1.03 WordConversion
January Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
TGu Timeline Date: Authors: January 2005 January 2005
TGs September Closing Report
TGu Timeline Date: Authors: May 2005 May 2005
TGs November Closing Report
TGu Timeline Date: Authors: July 2005 July 2005
TGs Process Date: Authors: March 2005 March 2005
TGs Process Date: Authors: May 2005 May 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Mesh Networking Task Group Process
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
TGs March Mid-Week Report
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

TGs Process Date: 2005-01-18 Authors: January 2005 January 2005 doc.: IEEE 802.11-05/26r0 January 2005 TGs Process Date: 2005-01-18 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

January 2005 doc.: IEEE 802.11-05/26r0 January 2005 Abstract Slides for discussion of the IEEE 802.11 TGs process in getting to a Draft. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

Mesh Networking Task Group Process January 2005 doc.: IEEE 802.11-05/26r0 January 2005 Mesh Networking Task Group Process ESS MESH FREE IEEE 802.11 TGs the APs Donald E. Eastlake 3rd <Donald.Eastlake@motorola.com> +1-508-786-7554 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

Generic Process of Getting to Letter Ballot January 2005 doc.: IEEE 802.11-05/26r0 January 2005 Generic Process of Getting to Letter Ballot Adoption of PAR and 5 Criteria Technical Presentations and Discussions Specify Any Additional Requirements, Comparison Criteria, or Other Documents Call For Proposals Select/Combine from Submitted Complete/Partial Proposals to Produce a Draft Refine Draft Letter Ballot Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

January 2005 802.11 Task Group Timelines Time from PAR approval to first Letter Ballot – average of 6.6 meetings / 13 months TGe-7, TGf-7, TGg-9, TGh-4, TGi-6 Time from first Letter Ballot to first Sponsor Ballot – average of 9 meetings / 18 months TGe-12, TGf-9, TGg-6, TGh-8, TGi-10 (above data compiled by Bruce Kraemer) Donald Eastlake 3rd, Motorola

Our Timeline Our PAR approval was 24 June 2004 January 2005 Our Timeline Our PAR approval was 24 June 2004 At the average pace for the above Task Groups, our first Letter Ballot would open in July 2005 and our first Sponsor Ballot in January 2007. We are now behind the average pace for our first Letter Ballot. We publicly announced January 2005 for a call for proposals to be submitted in July 2005. It will be some number of meeting beyond that before we can even try for our first 802.11 WG Letter Ballot. Things will generally happen slower than what we aim for. Donald Eastlake 3rd, Motorola

Schedule Projected at San Antonio (November) Meeting January 2005 doc.: IEEE 802.11-05/26r0 January 2005 Schedule Projected at San Antonio (November) Meeting January 2005 (Monterey, California) Work on Call for Proposals and on the Functional Requirements, Comparison Criteria, and other documents that may be referenced in the Call for Proposals. Call for Proposals issued immediately after meeting with deadline for submission of two weeks before the July meeting. March 2005 (Atlanta, Georgia) Presentations, refinement of selection criteria and process May 2005 (Beijing, China) July 2005 (San Francisco, California) Presentation of Proposals and initial selection actions September 2005 (TBD) Derivation of Draft November 2005 (Vancouver, British Columbia) Further Refinement of Draft January 2006 () Letter Ballot Authorized by WG? Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

Possible TGs Activity Before Next Meeting January 2005 doc.: IEEE 802.11-05/26r0 January 2005 Possible TGs Activity Before Next Meeting Possibilities for TGs Activity Between January 2005 and March 2005 Meetings to accelerate action : One or more official face to face meetings, requires 30 days notice (P&P clause 3.6.2) Multiple Teleconferences (require 10 days notice, cannot be held more often than weekly (P&P clause 3.6.3)) One Teleconference Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

Schedule Projected at Monterey (January) Meeting doc.: IEEE 802.11-05/26r0 January 2005 Schedule Projected at Monterey (January) Meeting March 2005 (Atlanta, Georgia) Brief proposal presentations, refinement of proposal process May 2005 (TBD) July 2005 (San Francisco, California) Presentation of proposals and initial selection actions September 2005 (Orange County, California) Down selection November 2005 (Vancouver, British Columbia) Derivation of Draft January 2006 (TBD) Further Refinement of Draft March 2006 (New Orleans, Louisiana) Letter Ballot Authorized by WG? Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola