Guelph – Wellington – Waterloo Regional Road Network

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
WHO ARE WE? WE ARE A COOPERATIVE WITH SIX MEMBER CLASSES Grower Groups Processors Distributors WorkersBuyers Growers.
Aim: To produce an annotated map to explain why quaternary industries locate along the M4 Corridor Motorway in the UK . Key Words Hi-tech industry Sunrise.
Regional integration through “Walvis Bay Corridors” for the Southern African Region Johny M. Smith CEO – WBCG 20 June 2012.
Cardener River Corridor Guiding Principles Diversity of Economic Development Scale of Growth –Incentives for Infill and Re-use –Appropriate to existing.
Transportation leadership you can trust. presented to presented by Cambridge Systematics, Inc. U.S. 70 Corridor Commission June 19, 2014 Paula Dowell,
1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
0 1 STRATEGIC LOCATION, DIRECT ACCESS TO MARKETS Hume Region is one of Australia’s major food producing areas and has direct access to 68% of Australian.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
KARA – Development Update KARA AGM – May 5, 2011.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
Estimating Economic Impacts of Border Wait Times in the San Diego-Baja California Region February 24, 2006.
©2012 Experian Information Solutions, Inc. All rights reserved. Experian and the marks used herein are service marks or registered trademarks of Experian.
Map exercise using the 3D fault model Using seismic data to position a dam.
National Planning Framework 3 Planning and Architecture Division.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Lesley Bassett Growth Strategy Programme Manager Cheshire West and Chester Council.
Agrotechnology Delegation to Brazil December, 2011.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
WITH SPECIAL THANKS TO. TOWN OF CALMAR LNEDA PRESENTATION Brought to You By: ED MELESKO Director of Public Works & Land Development.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
1 Carrying Indiana’s Torch 2d Annual Transportation, Distribution and Logistics Summit 14 September 2004 Eric Dietz, PhD, PE
Albania Trade and investment opportunities
Innovate UK our offer to GM Businesses
TRANSPORT & LOGISTICS SECTOR EXPANSION Minister of Works and Transport
NATIONAL COMPANY INDUSTRIAL ZONES
West of England Joint Transport Study
ZAMBIA – LAND of OPPORTUNITIES & PROFITS
A Position Statement 14th October 2016
Strategic Transport Forum Friday 15th September 2017
Central Polk Parkway PD&E Study
The intermodal logistics capacity in the region of Záhony
TAITH NORTH WALES REGIONAL TRANSPORT STRATEGY
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Technical and Public Advisory Committee Meeting #3
Expert presentation by:
ROADS Services Training Group
CR184 (Quintette Road) Bridge #480045
MONGOLIA AT A GLANCE Foreign investment friendly legal environment in stable democracy Growth projected to return to double digits by 2020 (World Bank)
Peter Molyneux Transport for the North.
Understanding the resilience of NSW farmers:
Gilda’s Run 2018 – 5K Route Runner Red Bids
Agricultural land reserve exclusion application
Southampton Airport Dave Lees, MD Southampton Airport.
State Highway 130 Corridor Water Demand Estimation
INDONESIA PRESENTED TO FISCHER.
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
Highways UK Conference Liz Hunter West Yorkshire Combined Authority
Logistics & Trade Facilitation Development
Acton Extension Update
Martin Tugwell Programme Director 12 September 2018
Delivering a World Class Heartland:
New Public Transport Infrastructure
Comprehensive Transportation Plan
Changing Viet Nam -New Phase of Development
Acton Extension Update
IMPLEMENTATION PROGRAMME OF SNA 2008 (Dominica)
KEYNOTE STAGE SPONSOR.
29th & Choctaw Rd Project Projected time line.
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Public Consultation Centre
Suffolk Chamber of Commerce Transport & Infrastructure Group
Presentation transcript:

Guelph – Wellington – Waterloo Regional Road Network Re-examining the GTA West Transportation Study Conclusions 25 February 2013

GTA West Revisited The conclusion of the GTA West study in 2010 occurred prior to the recommendations on Highway 7 The GTA West study did not take into account the area west of Guelph which includes the Region of Waterloo International Airport and significant manufacturing and food and agriculture activities

The Bigger Picture With Highway 7 approved, the GTA West study needs to be re-examined The solid green line proposed needs to change to an East-West and North-South grid shown as dashed line

The GTA West Study recommended the green dotted line to Milton, limiting service to Waterloo – Wellington – Guelph An effective grid with E-W every 15 km and N-S every 25 km will drive growth. Tying into the Hanlon extension reduces the load on Guelph infrastructure

Westbound 401 traffic is serviced on Highway 124 to Cambridge scaled down to include roundabouts Southbound Highway 6 via Hanlon extension, bypassing Morriston Northbound Highway 6 to the new Highway 7 and connecting to the GTA West by extending north of Woodlawn Rd

North to Barrie, South to Cambridge Highway 124 is a surrogate until GTA West is completed, so needs upgrading including a bypass around Erin Autoparts in Georgetown and Acton need better access to the economic corridor

Other Economic Corridors In addition to connecting 8 auto assembly plants with 465 auto part manufacturers and related input companies, other key markets would be served Food and Ag growers and processers Furniture manufacturers and distributors Water technology companies and alternate energy Tourism and creative sectors