Defining the Project Step 1: Defining the Project Scope

Slides:



Advertisements
Similar presentations
OPSM 639, C. Akkan1 Overview Planning Models Project planning determines what happens, when and how they happen. Since planning takes time and consumes.
Advertisements

Project Management 6e..
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
Project Management for Maximum Effectiveness
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Defining the Project Chapter 4.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Defining the Project (modified for 2015) Chapter 4.
ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case.
OM480 Defining the Project Parameters – Work Breakdown Schedule (WBS) (With Material from the Text Authors)
Chapter 4 Defining the Project. NEED FOR DEFINING PROJECTS One Project, small Many small projects, or large one –Yes.
Ch. 4 Project Definition.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
1 AP/ADMS 3353 Lecture 2 Chapter 3: Organization: Structure and Culture Chapter 4: Defining the Project.
Chapter 4 Defining the Project.
Defining the Project CHAPTER FOUR PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Scope Management Chapter 5 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall5-1.
5-1Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Scope Management Chapter 5.
Chap 4 Defining The Project.
Scope Management Chapter 5.
McGraw-Hill/IrwinCopyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. Defining the Project Chapter 4.
DEFINING THE PROJECT CHAPTER 4.
5-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 5 Defining the Scope of.
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Develop Project Charter
11 Lecture 2 Planning and Control in Projects (Part 1) 1.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Project Scope Management Pantelis Ipsilandis- Dimitrios Tselios.
Creating a Work Breakdown Structure with Microsoft Project.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson PowerPoint Presentation by Charlie Cook The University of West Alabama Defining the Project Chapter.
Project Management 6e..
Project Management 6e..
Project Management Methodology Used in Responding to Publishers’ Surveys Presenters: Jay Johnson, Institutional Research and Planning Liana Crisan-Vandeborne,
Defining and Managing Project and Product Scope
Scope Planning.
Project Management BBA & MBA
Chapter 4 Defining the Project.
Project Management -- Defining the Project
WORK BREAKDOWN STRUCTURE
Project Management Processes
University of Palestine Civil Engineering Department
Magister Sistem Informasi Universitas Komputer Indonesia
Inputs Outputs Tools and Techniques.
Project Integration Management
Information Technology Project Management – Fifth Edition
PROJECT SCOPE MANAGEMENT
Defining the Project Chapter 4.
Manajemen Industri Teknologi Informasi
DEFINING THE PROJECT CHAPTER 4.
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Managing Services and Improvement
Scope Management Chapter 5
MGT 605: CH 04 Defining the Project.
Project Management Process Groups
Project Management Processes
PROJECT SCOPE MANAGEMENT
Project Scope Management
PLANNING & SCHEDULING (First Part)
Project Integration Management
Growing Your Way to Effective Scheduling: Introduction to the “Whys” and “Hows” of Building Effective Schedules with Microsoft Project.
Scope Management Chapter 5
Introduction to Project Management
[Insert Project Name] Work Breakdown Structure (WBS)
Executive Project Kickoff
Planning for Design Project
PROJECT PLANNING AND SCHEDULING BY: AMINATH SHAAYAN SHAHID.
Presentation transcript:

Defining the Project Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating the Work Breakdown Structure Step 4: Integrating the WBS with the Organization Step 5: Coding the WBS for the Information System

Step 1: Defining the Project Scope A definition of the end result or mission of the project—a product or service for the client/customer—in specific, tangible, and measurable terms. Purpose of the Scope Statement To clearly define the deliverable(s) for the end user. To focus the project on successful completion of its goals. To be used by the project owner and participants as a planning tool and for measuring project success.

Project Scope Checklist Project objective Deliverables Milestones Technical requirements Limits and exclusions Reviews with customer

Project Scope: Terms and Definitions Scope Statements Also called statements of work (SOW) Project Charter Can contain an expanded version of scope statement A document authorizing the project manager to initiate and lead the project. Scope Creep The tendency for the project scope to expand over time due to changing requirements, specifications, and priorities.

Step 2: Establishing Project Priorities Causes of Project Trade-offs Shifts in the relative importance of criterions related to cost, time, and performance parameters Budget–Cost Schedule–Time Performance–Scope Managing the Priorities of Project Trade-offs Constrain: a parameter is a fixed requirement. Enhance: optimizing a criterion over others. Accept: reducing (or not meeting) a criterion requirement.

Step 3: Creating the Work Breakdown Structure Work Breakdown Structure (WBS) An hierarchical outline (map) that identifies the products and work elements involved in a project. Defines the relationship of the final deliverable (the project) to its subdeliverables, and in turn, their relationships to work packages. Best suited for design and build projects that have tangible outcomes rather than process-oriented projects.

How WBS Helps the Project Manager Facilitates evaluation of cost, time, and technical performance of the organization on a project. Provides management with information appropriate to each organizational level. Helps in the development of the organization breakdown structure (OBS). which assigns project responsibilities to organizational units and individuals Helps manage plan, schedule, and budget. Defines communication channels and assists in coordinating the various project elements.

Work Packages A work package is the lowest level of the WBS. It is output-oriented in that it: Defines work (what). Identifies time to complete a work package (how long). Identifies a time-phased budget to complete a work package (cost). Identifies resources needed to complete a work package (how much). Identifies a person responsible for units of work (who). Identifies monitoring points (milestones) for measuring success.

Step 4: Integrating the WBS with the Organization Organizational Breakdown Structure (OBS) Depicts how the firm is organized to discharge its work responsibility for a project. Provides a framework to summarize organization work unit performance. Identifies organization units responsible for work packages. Ties the organizational units to cost control accounts.

Step 5: Coding the WBS for the Information System WBS Coding System Defines: Levels and elements of the WBS Organization elements Work packages Budget and cost information Allows reports to be consolidated at any level in the organization structure

Project Communication Plan What information needs to be collected and when? Who will receive the information? What methods will be used to gather and store information? What are the limits, if any, on who has access to certain kinds of information? When will the information be communicated? How will it be communicated?