Bruxelles, 13 February 2008 Regional Market and Cross Border Luigi de Francisci TERNA - Rete Elettrica Nazionale S.p.A.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
“Market coupling on the Italian border: results and lessons from the Italy-Slovenia coupling, update on the PCR project” Electricity Regional Initiative.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Case Study Comparing the V4 with the new EU(6) & EU(2) Cross border meeting - Visegrad Countries Chris Corbin ePSIplus Analyst Beckov, Slovakia, 11 th.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
Nord Pool Spot and Europe
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Currency Unification: Foreign Exchange Volatility and Equity Returns A study of the European Union and the effects of the Euro.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
efficient capacity allocation method
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Maps of Topic 2B Multilingualism in Europe Europe A Story of Empire (a united Europe) & Language.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Europe Links 17 Power Markets as Spain, Portugal Set to Join Day-ahead power markets are set to be linked from Portugal to Finland as the European Union.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
ENERGY AND WATER REGULATORY COMMISSION
29th November 2016 Teleconference

EUROPEAN UNION – MAKING OFF European Economic Community
Power market structure and market price development in the SEE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
2nd Mini-Forum for Central West Electricity REM
Market Coupling and Ways Forward Lene Sonne Vice President, Market
BSP SouthPool En.trading 2017
Supported by: PCR Status report AESAG, September
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Deputy Executive Director/IT Expert
SWE Day- Ahead market coupling
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Experiences with new Power Exchanges , Sarajevo
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
IFA Market Coupling Update
Feedback on the SWE coupling Public Consultation
ETSO main 2006 Issues for West-Central Europe Market Development
37th IG Meeting South Gas Regional Initiative
Linking of regional markets
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
Supported by: PCR Status report AESAG, September
City of London School – extra materials
The European Parliament – voice of the people
The European Parliament – voice of the people
Day-ahead market coupling
Currency Unification: Foreign Exchange Volatility and Equity Returns
EU: First- & Second-Generation Immigrants
37th IG Meeting South Gas Regional Initiative
Unilateral Policy Design against Carbon Leakage
Walter Boltz Chairman, CEER Gas Working Group
BSP SouthPool En.trading 2016
Prodcom Statistics in Focus
Presentation transcript:

efficient capacity allocation method Market Coupling as efficient capacity allocation method on the France-Spain Interconnection

PLAN Context: explicit allocation of day-ahead exchange capacities between Spain and France Driving events: inefficient use of interconnection capacities Outcome: implementation of market coupling Observations: improved market efficiency

Context: explicit allocation of day-ahead capacities In both France and Spain organized wholesale electricity markets exist Tradable energy products range from long term yearly products to hourly products at day-ahead and intraday horizons The spot (day-ahead - reference) markets are managed by the Power Exchanges OMIE in Spain and EPEX in France Both markets are zonal, delivering a single electricity price for the entire country Only energy products are traded in the Power Exchanges Exchange capacity between France and Spain (approximately 1200 MW) was allocated through an explicit auctions market mechanism at the yearly, monthly, day-ahead and intraday timeframes

Driving events: before market coupling The explicit auctions at the daily timeframe were not the highest efficiency capacity allocation method: exchange capacity and energy had to be traded in two different steps This limitation led to a not always efficient use of the interconnection: energy flowing against the market spread in some hours price divergence with non-saturated exchange capacity Cost of these inefficiencies was estimated at ~12 M€ / year

Driving events: non correct use of interconnection 11 %

Outcome: market coupling The market coupling of zonal markets is the European target model: Implicit allocation of Capacity simultaneously with energy allocation, optimizing the use of cross border capacities in line with the Markets results France had already been coupled with Germany, Belgium, the Netherlands and Luxembourg (Central West Europe - CWE Coupling) The market coupling was extended to UK and Scandinavian and Baltic countries (North West Europe - NWE Coupling) in February 2014 Spain was already coupled with Portugal (MIBEL Market) since July 2007 In May 2014 the daily explicit auctions on the France-Spain interconnection have been replaced by the European market coupling mechanism A shared and common algorithm (Price Coupling of Regions - PCR solution) was used

Outcome: market coupling in EU Multi Regional Coupling (MRC) Project NWE + SWE : may 2014 Italy / Slovenia Czech Republic / Slovakia / Hungary Project NWE+SWE = 2500 TWh/year (75% European electric consumption)

Observations: methodology Improved market efficiency measured by the following indicators: Use of the interconnection Number of participants competing for capacity Price convergence between France and Spain Price volatility Market resilience Historical data from 2012 to July 2014 CWE: period from 1st January 2012 to 4th February 2014 (France coupled with the Netherlands, Belgium and Germany only) NWE: period from 4th February 2014 to 13th May 2014 (CWE + UK and Scandinavian countries) NWE-SWE: period after 13th May 2014 (NWE + Iberia => MRC)

Observations: efficient use of the interconnection 11 %

Observations: efficient use of the interconnection 0 %

Observations: higher number of participants competing for capacity

Observations: price convergence increased

Exemple of Price convergence in Europe Price (€/MWh) 19th May, 16:00-17:00 Exemple of Price convergence in Europe Spread Price > price FR Price < price FR

Observations: price volatility decreased -66% -38% -23%

Observations: price volatility decreased -66% -38% -23%

Observations: market resiliency increased (France) -22% -9% -10%

Conclusions Proven and confirmed usability of the market coupling model with a shared and common algorithm in an important part of European price zones Improved efficiency in the use of the interconnection Increased number of participants competing for capacity Increased price convergence Decreased price volatility Increased market resilience and liquidity …the way forward: extension of day-ahead market coupling to all EU countries !