TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Advertisements

Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
IEEE TGai Closing Report
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
TGn Opening Report Dallas, TX 802 Plenary November ‘06
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGn Opening Report Dallas, TX 802 Plenary November ‘06
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
TGn ad hoc Opening Report - Sep ‘08
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGn Opening Report - Nov 10 ‘08
IEEE TGai Closing Report
TGn Chairs’ Report Denver, CO, US 802 Plenary – July ‘08
TGaf Waikoloa Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Opening Report - Jan 19 ‘09
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Taipei, TW 802 Interim –18 Jan ‘08
TGn Opening Report - Sep 08 ‘08
TGn Opening Report - Sep 08 ‘08
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Opening Report - Nov 10 ‘08
TGn ad hoc Opening Report - Sep ‘08
TGn Closing Report Los Angeles, CA, US 802 Interim
TGn Meeting Report - March 09 ‘09
Sept 2008 Closing Plenary Motions
Sept 2008 Closing Plenary Motions
TGaf Waikoloa Closing Report
TGn Opening Report - Nov 10 ‘08
Mar 2010 Closing Plenary Motions
TGn Meeting Report - May 09 ‘09
TGn Opening Report - Sep 08 ‘08
GEN ad hoc Summary - Sep 14 ‘07
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Opening Report - Jan 19 ‘09
TGn Chairs’ Report Jacksonville, FL, US 802 Interim – May ‘08
TGn Opening Report - Sep 08 ‘08
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
TGn Meeting Report - March 09 ‘09
TGn Meeting Report - May 09 ‘09
TGn Meeting Report - March 09 ‘09
TGn Closing Report Montreal, Quebec, CA 802 Interim – 18 May ‘07
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report – July ‘06
TGn Meeting Report - March 09 ‘09
TGn Closing Report Orlando, FL, US 802 Plenary – March ‘07
TGn ad hoc Opening Report - Sep ‘08
TGn Closing Report – September 24 ‘09
TGn Opening Report - Nov 10 ‘08
TGn Meeting Report - March 09 ‘09
May 2008 Closing Plenary Motions
January 2012 doc.: IEEE /0179r1 Jan 2012
IEEE TGai Closing Report
TGn Closing Report - July 19 ‘07
Presentation transcript:

TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08 July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08 Date: 2008-09-12 Authors: Name Company Address Phone email 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) 427-4098 Bruce Kraemer Marvell bkraemer@ marvell .com Sheung Li SiBEAM +1 (408) 245-3120 sli@sibeam.com 555 Mathilda Ave, Sunnyvale, CA 94085 Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) 616-3800 adrian.p.stephens@ intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

The TGn Streak Ensues with July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Draft 6.0 The TGn Streak Ensues with All 195 recirculation ballot comments resolved or withdrawn in one meeting Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Motion Having approved comment resolutions for all of the comments received from LB134 on Draft 6.0, And having prepared Draft 7.0 containing all of the approved comment resolutions, Move to begin as soon as possible, a 15 day Working Group Recirculation Ballot asking the technical question “Should P802.11n Draft 7.0 be forwarded to Sponsor Ballot?” TG: 37 approve, 0 not approve, 0 abstain Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

Primary Meeting Documents July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 Primary Meeting Documents Chair’s Opening Report 11-08-0939r7 Chair’s Closing Report 11-08-1189r1 Meeting Minutes 11-08-1066r1 Editor’s Report 11-08-1008r0 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

TGn Teleconference Plan July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Teleconference Plan Call time: 10:00 – 14:00 ET Call number: 916-356-2663 Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode Sep 10 Interim Sep 17 Ballot Sep 24 Oct 01 TGn Oct 08 GEN 1hr, MAC 3hr Oct 15 Oct 22 PHY 2hr, COEX 2hr Oct 29 COEX 2hr, PHY 2hr Nov 05 TGn Misc Nov 12 Plenary Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

TGn Current Timeline Event Name Accepted Dates Actual Predicted July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Current Timeline Event Name Accepted Dates Actual Predicted PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Sep ‘08 Initial Sponsor Ballot Nov ‘08 Recirculation Sponsor Ballot Jan ‘09 Final WG Approval Jul ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Publication Nov ‘09 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

September 2008 Ad hoc in November 2008 Move to authorize TGn to schedule an ad hoc Friday, Saturday (Nov 7, 8) in Dallas, TX at the plenary hotel for the purpose of resolving comments received from the Draft 7.0 Letter Ballot with the provision to shorten or cancel if not needed. Moved/Seconded by Rosdahl/Zweig. Unanimous approval. Bruce Kraemer, Marvell