TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08 July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08 Date: 2008-09-12 Authors: Name Company Address Phone email 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) 427-4098 Bruce Kraemer Marvell bkraemer@ marvell .com Sheung Li SiBEAM +1 (408) 245-3120 sli@sibeam.com 555 Mathilda Ave, Sunnyvale, CA 94085 Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) 616-3800 adrian.p.stephens@ intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)
The TGn Streak Ensues with July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Draft 6.0 The TGn Streak Ensues with All 195 recirculation ballot comments resolved or withdrawn in one meeting Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)
July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Motion Having approved comment resolutions for all of the comments received from LB134 on Draft 6.0, And having prepared Draft 7.0 containing all of the approved comment resolutions, Move to begin as soon as possible, a 15 day Working Group Recirculation Ballot asking the technical question “Should P802.11n Draft 7.0 be forwarded to Sponsor Ballot?” TG: 37 approve, 0 not approve, 0 abstain Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)
Primary Meeting Documents July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 Primary Meeting Documents Chair’s Opening Report 11-08-0939r7 Chair’s Closing Report 11-08-1189r1 Meeting Minutes 11-08-1066r1 Editor’s Report 11-08-1008r0 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)
TGn Teleconference Plan July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Teleconference Plan Call time: 10:00 – 14:00 ET Call number: 916-356-2663 Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode Sep 10 Interim Sep 17 Ballot Sep 24 Oct 01 TGn Oct 08 GEN 1hr, MAC 3hr Oct 15 Oct 22 PHY 2hr, COEX 2hr Oct 29 COEX 2hr, PHY 2hr Nov 05 TGn Misc Nov 12 Plenary Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)
TGn Current Timeline Event Name Accepted Dates Actual Predicted July 2008 doc.: IEEE 802.11-08/0830r0 September 2008 TGn Current Timeline Event Name Accepted Dates Actual Predicted PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Sep ‘08 Initial Sponsor Ballot Nov ‘08 Recirculation Sponsor Ballot Jan ‘09 Final WG Approval Jul ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Publication Nov ‘09 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)
September 2008 Ad hoc in November 2008 Move to authorize TGn to schedule an ad hoc Friday, Saturday (Nov 7, 8) in Dallas, TX at the plenary hotel for the purpose of resolving comments received from the Draft 7.0 Letter Ballot with the provision to shorten or cancel if not needed. Moved/Seconded by Rosdahl/Zweig. Unanimous approval. Bruce Kraemer, Marvell