CMS Perugia Modules Production Review

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Status of the Planar Edgeless Silicon Detectors Gennaro Ruggiero TOTEM Collaboration Meeting 09/11/2005.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Complementary ISTC Projects #3888, 3889p
Status of works on the Collaboration Contract between IHEP and FAIR
Mechanics: (Tim).
SCHEDULE Nov 1st - Assembly Table Complete
Rod adaptors for module tests Module positioning studies
Status Brussels GANTRY
FNAL Production Experience
Silicon Strip Tracker MPR November 2004 CMS TRACKER COLLABORATION
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Vienna Module Production
Module production in Italy
Bari production centre resp. M. de Palma
CMS Perugia Gantry Status Report
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
TOB Module Production Overview and Plan
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

CMS Perugia Modules Production Review tRACKER WEEK 21/07/1999 CMS Perugia Modules Production Review D. Benedetti, M.Biasini, E.Babucci, M.Giorgi, M. Nastase, M. Puscalau, V. Postolache, A. Santocchia, F. Velcea CERN 22-04-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia Outlook Modules productions Assembly precision Hybrids test Tools and Plates Gantry operations Available parts Cern 22-4-2004 Marco Giorgi CMS Perugia

Marco Giorgi CMS Perugia Modules production tRACKER WEEK 21/07/1999 346 modules assembled from 1-12-03 to 13-4-04 228 TIB R-phi L34 modules 118 TIB R-phi L12 modules 248 produced @ full rate (8 modules/day) 2 modules out of mechanical specs 336 modules shipped to bonding centres (Pisa, Padova) Vecchia presentazione Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia tRACKER WEEK 21/07/1999 Modules production Dec 03 Apr 04 contingents Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Assembly Precision: gantry tRACKER WEEK Assembly Precision: gantry 21/07/1999 cut cut cut cut cut cut Y Difference between design coordinate: Xmes - Xdes Vecchia presentazione X Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Assembly precision: gantry- CMM Cern 22-4-2004 Marco Giorgi CMS Perugia

Marco Giorgi CMS Perugia Hybrids test tRACKER WEEK 21/07/1999 449 Hybrids received from Cern 1-12-03 346 Assembled 17 sent back to CERN for evaluation before assembly 2 with problems on electronic 4 with scratches on pitch adapter 11 with bonds slightly bended 81 Stereo l/r received, under test Vecchia presentazione Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia Tools and plates tRACKER WEEK 21/07/1999 Perugia take care the construction of TIB/TID assembly ad storage plates 2 storage plates for TIB, TID working (Perugia, Bari) 6 TIB R-phi assembly plates working (3 Perugia, 3 Bari) 2 Tib Stereo left plates ready 2 Tib Stereo right plates almost ready TID Layer 1,2 R-phi plates on work on industry TID Layer 3 R-phi plates technical drawings ready TID stereo plates: waiting for final frames drawing 24 hybrids pickup tools working (12 Perugia, 12 Bari) Vecchia presentazione Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia tRACKER WEEK 21/07/1999 Tools and plates Vecchia presentazione Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia tRACKER WEEK 21/07/1999 Gantry Operation Accurate = Time consuming operation Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Some scratches on sensors tRACKER WEEK 21/07/1999 After some indications we have found some Tib ib1/2 modules with light scratched sensors. Action: optical inspection on microscope before and after assembly on gantry: Results: The assembly procedure do not introduce any scratch. Light scratches were induced by a vacuum pump used to handle TIB sensors during inspection after reception. This problem was fixed last December, but we are still mounting sensors that are affected by this feature. Vecchia presetazione Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA

Marco Giorgi CMS Perugia Available Parts @14-4-04 Sensors Frames Hybrids Carriers TIB-Ib1 50 + 315 198 1 70 TIB- Ib2 25 + 313 TIB- S L 48 TIB- S R 33 TOT 75 + 628 82 Cern 22-4-2004 Marco Giorgi CMS Perugia = on Perugia QTC

Marco Giorgi CMS Perugia Conclusions tRACKER WEEK 21/07/1999 Production started from dec-2003 Large fraction of modules produced @full rate Assembly precision under the specs Almost ready to assembly all TIB modules type Vecchia presentazione Cern 22-4-2004 Marco Giorgi CMS Perugia M. M. Angarano - PERUGIA