Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1

Slides:



Advertisements
Similar presentations
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
Advertisements

Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary week 23 Luminosity production
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
LHC Morning Meeting - G. Arduini
Not the most productive 24 hours on record
Tuesday 22 November 2011.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Programme for VDM measurements Friday Oct 15
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tue/Wed 12/ :00 Probe beam back again
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Friday morning 08:00 Stable beams with 840b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday 14:30 Fill 2011 dumped.
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Wednesday morning Waiting for PS – problem on RF cavity.
Friday :47 stable beams fill 3273
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1 SUE candidate. Integrated luminosity 33 pb-1 in 1:40. Delaying refill for ATLAS solenoid (in case access would have been needed). 10:00 Injecting. Back to filling scheme with 3 non-colliding bunches. 11:00 ALTAS solenoid tripped again during ramp up. 11:30 Stable beam fill 2701, L ~ 6.2E33 cm-2s-1. ATLAS solenoid ramping up… CMS VdM cancelled. 23:20 Dump by OP. Integrated luminosity 160 pb-1 in 11:50. 11/27/2018 LHC 8:30 meeting

Night 00:00 Access for CMS, ATLAS and ALICE. 01:20 Machine closed. 03:30 Dump at 450 GeV. UFO candidate around MKI2. ~300 ms after injection. BCT 11/27/2018 LHC 8:30 meeting

Night 04:00 Dump beam – some poor injections. 05:00 Ramp started. Beam not ideal… Beam dumped in ramp. Water flow fault on converter RQ10.R1. Access for EPC. Pressure increased from 1.9 to 2.2 bar. 11/27/2018 LHC 8:30 meeting

Today XPOC error investigations. Test dump when we are ready again. Then refill for physics. Expected around 10:00 11/27/2018 LHC 8:30 meeting

Pending CMS VdM and ADT gain reduction at end of fill. RF: 1 hour end of fill for fine adjustment of tuners. Impact of TETRA on hump / beam. 30 mins at injection with probe bunches. Accesses: TCLIB.6R2.B1 electronics and LVDT sensor MAD PM15: motors of inner doors not working RQTL11.R7B2 temp DFBAN spikes affecting cryo start but not CM (~3 to 5 hours). BI in Pt4 (3-4 hours, working hours). MKA test in Pt4 (1-2 hours). 11/27/2018 LHC 8:30 meeting