Shadow opinion on the Pricing Proposal

Slides:



Advertisements
Similar presentations
Software Requirements
Advertisements

Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Software Requirements
Amine Abada 06/10/2014 ERI SWE TERRE #2 Trans European Replacement Reserve Exchange.
Towards Regional Independent Operators – a main driver for successful market integration.
Software Requirements
7M701 1 Software Engineering Software Requirements Sommerville, Ian (2001) Software Engineering, 6 th edition: Chapter 5
Software Requirements
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 5 Slide 1 Requirements engineering l The process of establishing the services that the.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 6 Slide 1 Software Requirements.
Software Requirements Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn Lecture 4 & 5.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
L To identify the services that the customer requires from a system and the constraints under which it operates and is developed.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Requirements / Specifications. 01/18/10CS-499G2 Requirements Determine what the customer needs (wants) the software to do  What are requirements?  An.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Software Requirements Specification Document (SRS)
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Software Engineering, COMP201 Slide 1 Software Requirements BY M D ACHARYA Dept of Computer Science.
1 Software Requirements Descriptions and specifications of a system.
Software Engineering, COMP201 Slide 1 Software Requirements.
Details of demand management options
Public Consultation : main conclusions (1/2)
EBGL implementation Organization
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
Chapter 4 – Requirements Engineering
Software Requirements
Presentation on Software Requirements Submitted by
Chapter 4 Requirements Engineering (1/3)
Chapter 5 – Requirements Engineering
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Test Blueprints for Adaptive Assessments
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Draft for factual comments, suggestions on overlaps welcome.
Continuous Cross-Border Implicit Intraday Trade Status update
2009 TSO Transparency Gas Regional Initiative North-West
Regulators’ update on Congestion Management and Balancing
IG meeting, December 5th, 2012, DERA premises, Copenhagen
NWE Day-Ahead Price Coupling
NWE Cross Border Intraday
Gas Regional Initiative
Software Requirements
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
An Introduction to Balancing Services Use of System Charging (BSUOS)
Trans European Replacement Reserve Exchange
Software Requirements
PICASSO Electricity Balancing Stakeholder Group
Stakeholder Workshop on EB GL Implementation
MARI BSG Meeting Manually Activated Reserves Initiative 5 March 2018
MARI BSG Meeting Manually Activated Reserves Initiative 5 March 2018
TERRE Trans European Replacement Reserves Exchange
Imbalance Netting Platform
Webinar on imbalance settlement
Counter-activations Compromise proposal for counter-activations in the mFRR- and aFRR-Platforms.
Electricity Balancing Stakeholder Group Brussels, 19 November 2018
Presentation of the all NRAs Request for Amendment
Strategic Environmental Assessment (SEA)
Survey on Ancillary services procurement, Balancing market design 2018
Trans European Replacement Reserve Exchange
FIVE PROJECT PHASES.
Subject Name: SOFTWARE ENGINEERING Subject Code:10IS51
Common reasons for partial use of DTM data
RR Platform – Implementation Framework
Presentation transcript:

Shadow opinion on the Pricing Proposal

Topics addressed in the shadow opinion Structure and clarity Definitions and interpretation Substantiation Additional remarks

Structure and clarity (1/2) NRAs ask to include a description of what is a marginal price and how this principle is applied to activated balancing energy bids. NRAs ask a general description of the pricing method(s) that serves as the basis of the more detailed pricing methods Application for different standard products Application for different specific products Possibility of application of a different pricing methodology for non-converted specific products (article 26(3)(b) EBGL), if approved at national level

Structure and clarity (2/2) NRAs request TSOs to be explicit on whether and how the pricing methodology leads to one price for both directions or one price per direction During activation of balancing energy bids During deactivation of balancing energy bids NRAs also ask TSOs to include in the proposal how price indeterminacy will be dealt with in each pricing method

Definitions and interpretation NRAs ask TSOs to align the use of terms with those in the EBGL and among other proposals or IFs “Requested” “Activated” “Selected” “Delivered” “Cross zonal capacity” “Uncongested area” “Curves” “price indeterminacy”

Substantiation of the current proposal (1/2) For each pricing option, NRAs ask TSOs to substantiate the expected effects on (positive) incentives for BSPs to offer balancing energy bids to the different balancing platforms. the expected effects on (positive) incentives for BRPs to be balanced or for helping the system to be balanced. the expected effects on incentives and possibilities for BSPs to develop strategic bidding behaviour, and to elaborate on possible mitigation measures for each option. how both pricing options (pricing and settlement per 15 min ISP versus pricing and settlement per optimisation cycle) fulfil the concept of marginal pricing (pay as cleared)

Substantiation of the current proposal (2/2) For each pricing option, NRAs ask TSOs to analyse whether they provide incentives to BRPs to be balanced or help balance the system, and avoid distorting incentives on both BSPs and BRPs ; How do both pricing options affect: external (administrative) costs related to the implementation, metering, communication, settlement, profiling, etc.? the algorithmic requirements and computational feasibility? the stability of the settlement procedure both in operation and in ex post settlement (i.e. the definition of prices and volumes)? transparency of the settlement procedure for BSPs/BRPs with each option (e.g. on how prices are defined)? which information has to be provided for the BRPs and the BSPs to react following the incentives?

Additional remarks NRAs ask TSOs to specify that the period for which the volume is settled is consistent with the period for which the price is determined; for the purpose to settle the delivered volume of Balancing Energy between TSO and BSP NRAs ask TSOs to clarify what they envisage as an optimisation with activation for system constraint purpose. NRAs therefore invite TSOs for a dialogue on the selection of and pricing method for balancing energy bids activated in the platforms for cross-zonal system constraints.