Product Support Strategy

Slides:



Advertisements
Similar presentations
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
Advertisements

JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
Riordan Business Model Implementation Plan. Introduction Riordan Manufacturing adopts different steps and processes. Important factors required to discuss.
OASD Logistics and Materiel Readiness
Proposed Supply Chain Risk Management Process Flow Supply Chain Risk Leadership Council 20 April 2009 DRAFT.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Reliability Engineering, Trade spaces, and Affordability Consideration of RMA in Systems Acquisition is Required by Law New Policies Have Been Created.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Sustainability: A Worthwhile Investment Steve Leeds Senior Counselor to the Administrator and Agency Senior Sustainability Officer March 15, 2011 IRMCO.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
Business, Cost Estimating & Financial Management Considerations
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Contracting (Product) Considerations
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Technology Readiness Levels
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
SE and SSE Trade-Off Analyses
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
Measures of Effectiveness for Supportability
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Cloud in a Rack Tuan Tran 10 March 2016
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
A B C Solution Analysis Technology Maturation & Risk Reduction
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
BY – Stravis Consultants “Bright Solutions. Valuable Outcomes.”
DAG CH 3 Figure 18: Weapon System Development Life Cycle
Prism Communications, Inc.
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Fielding plan details and adjustments
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
Charter Summary For: XXX Program Affordability Plan
The Department of Defense Acquisition Process
I would like to explain on the revision of OECD Council Act on PRTRs.
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Product Support Strategy Operations & Support B Technology Maturation and Risk Reduction Engineering and Manufacturing Development Production & Deployment C FRP Materiel Solution Analysis Acquisition Sustainment A Establish sustainment strategy & execution plan framework Set metrics goals/thresholds & test methods TMRR Focus Product Support Strategy Supportability design requirements to influence specifications RFP Intellectual Property Strategy Metrics -- Goals and Thresholds: System and Subsystem Level Supply Chain Sustainment Metrics Test Strategy for System Suitability and Supportability Supportability Analyses (BCAs/FMECA/RCM/LORA/etc) Affordability Cap O&S Cost Estimating – Assumptions, Resources, Estimates Core Workload and Estimates RFP CDD