N0--> N1 Chain Includes corrections of all the known instrumental perturbators - electronics: offset, EMI, gain - Time integration - Sky background -

Slides:



Advertisements
Similar presentations
A Search for Earth-size Planets Borucki – Page 1 KEPLER; Data Validation and Follow Up Observations CoRoT Symposium W.J. Borucki & the Kepler Team 5 February.
Advertisements

High-precision UBVRI photometry with a new 50cm telescope at Stará Lesná Pribulla T., Chochol D. Astronomical Institute of the Slovak Academy of Sciences.
25th CoRoT Scientific Council : sept M.O. - L.J. Evaluation of exo N1 data M.Ollivier - L Jorda.
P. Bordé 1, B. Samuel 1, A. Léger 1, M. Ollivier 1 & D. Rouan 2 1 IAS, Université Paris-Sud 11 2 LESIA, Observatoire de Paris First International Corot.
Proposal writing
1 M. Auvergne. Natal October 2004 Instrument performances. Signal perturbations: Radiations. Scattered light. ACS. Temperature. Readout electronic. Calibrations.
Photometric follow-up of transiting planet candidates Marton Hidas UNSW.
Oversampling mode Roi Alonso, Pierre-Yves Chabaud Christian Surace, Raphael Cautain, P. Barge.
Thanks to Henrietta Swan Leavitt, Harvard CfA November 5th Hommage to Henrietta Leavitt from the CoRoT Team Annie BAGLIN, Merième CHADID,
IMPACT Report SSMO Receiving Review– January 23, 2007.
BRITE-Constellation Meeting Warzaw Feb 2010 BRITE - Constellation BRIght Target Explorer BRITE-AUTBRITE-CAN BRITE-POL.
BRITE-Constellation Overview and Status Feb 2010 BRITE - Constellation BRIght Target Explorer BRITE - ATBRITE - CABRITE – PL UniBRITE BRITE-AUSTRIA BRITE-PL1.
BRITE-Constellation Nov BRITE Satellites Cubic form factor (20cm/side) with mass < 8kg Cubic form factor (20cm/side) with mass < 8kg Pre-deployed.
Exploitation of Corot images Leonardo Pinheiro 3/Nov/05, Ubatuba.
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
Optimized photometric aperture for the seismology channel Fabio de Oliveira Fialho Michel Auvergne 2nd CoRoT-Brazil Workshop.
1 COROT: Scientific comity Sept Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
Stellar variability monitoring in open clusters with mini-SONG X.B. Zhang National Astronomical Observatories, Chinese Academy of Sciences.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Photometer Extended Source Photometry Bernhard Schulz NHSC/IPAC on behalf of the SPIRE.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Observation of the photocentre position variations with CoRoT - Scientific motivations and expected performance C. Moutou (LAM) – H. Deeg (IAC) – M. Ollivier.
Software Development Tools Changes 2013 BE-CO-DO
 PLATO PLAnetary Transits & Oscillations of stars Data onboard treatment PPLC study February 2009 on behalf of Reza Samadi for the PLATO data treatment.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
1 Leonardo Pinheiro da Silva Corot-Brazil Workshop – October 31, 2004 Corot Instrument Characterization based on in-flight collected data Leonardo Pinheiro.
PLATO Data Center: Purpose and Structure Laurent Gizon (PDPM) Hamed Moradi (PDC Project Office)
WFPC2 UPDATE TIPS : August 15, 2002 L.M. Lubin New WFPC2 Documentation 1.Cycle 12 Instrument Handbook (V7.0, Biretta et al.)  Updated information on the.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 Measuring Photometry from SPIRE Observations Presenter: David Shupe (NHSC/IPAC) on.
Data Analysis Software Development Hisanori Furusawa ADC, NAOJ For HSC analysis software team 1.
Exoplanet Science Don Pollacco QUB. Overview PLATO’s objectives and space Work packages in the definition phase Timescales and aims of the definition.
Source catalog generation Aim: Build the LAT source catalog (1, 3, 5 years) Jean Ballet, CEA SaclayGSFC, 29 June 2005 Four main functions: Find unknown.
UPDATED CTE CORRECTION FORMULAE FOR ACS Marco Chiaberge Pey Lian Lim, Vera Kozhurina-Platais, Marco Sirianni Ron Gilliland, Jennifer Mack.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
Ivan Procházka, Jan Kodet presented at : seminart ACES – ELT Meeting, Fundamental Station Wettzell, Technische Univ.Muenchen, Germany May 8, 2009 Czech.
PPLC – ESA FEB 27th 2009 CCD thermal specs G Epstein CCD thermal specifications Divers for Telescope thermal architecture.
Chair : M. Deleuil. 3.5º Main target m v  6 Secondary targets m v < 9 Exoplanet field 2.8º N Focal plane:
Corot:Ubatuba Nov The Ground Segment: Data Processing. Software development in laboratories. Brazilian contribution. Michel Auvergne Réza Samadi.
The LSST Data Processing Software Stack Tim Jenness (LSST Tucson) for the LSST Data Management Team Abstract The Large Synoptic Survey Telescope (LSST)
PACS ICC Meeting #41 ESAC, 6/7 November 2012POP Calibration GoalsE. Sturm Post-Operations Calibration Goals E. Sturm.
July 21, 2004 Natalia Kuznetsova NICMOS Analysis of ACS ● Data Inventory ● Calibration ● Bad pixel mask ● Extracting photometry ● Next steps 1.
Copyright , Dennis J. Frailey CSE Software Measurement and Quality Engineering CSE8314 M00 - Version 7.09 SMU CSE 8314 Software Measurement.
Astronomical Projects BEYOND NIGHT SKY. General requirements Weekly Night sky observation. Good knowledge of telescope controlling Imaging. Inviting few.
What is Science?? Biology IA Spring Goals of Science To investigate and understand the natural world To explain events in the natural world Use.
STScI Slitless Spectroscopy Workshop November 2010 aXe Advanced Topics – becoming more dextrous, using aXe with other instruments, making calibration.
26th October 2005 HST Calibration Workshop 1 The New GSC-II and it’s Use for HST Brian McLean Archive Sciences Branch.
Photometry and Astrometry: Bright Point Sources May 16, 2006 Cullen Blake.
Measurement of the photocentre position variations with CoRoT - further investigations M. Ollivier (IAS)
GSPC -II Program GOAL: extend GSPC-I photometry to B = V ˜ 20 add R band to calibrate red second-epoch surveys HOW: take B,V,R CCD exposures centered at.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Temperature dependency of ACC data TUD provides all available GPS-derived linear accelerations to VZLU End of January – end of May To be used for validation.
Validation of HLA Source Lists Feb. 4, 2008 Brad Whitmore 1.Overview 2.Plots 3.Summary.
7/17/07NASA Report1 NASA Archiving Activities - Lessons Learned 2nd International Planetary Data Alliance Steering Group July 17, 2007 Reta Beebe PDS Program.
SINFONI data reduction using the ESO pipeline. Instrument design and its impact on the data (I) integral field spectrometer using mirrors brickwall pattern.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
20th CAA/DAA Cross Calibration Meeting
JWST Pipeline Overview
Validation of N1 Light Curves
THE NATURE OF SCIENCE.
Operating systems and Internet services
Characteristics of measurement systems
First Assessments of EUVI Performance on STEREO SECCHI
Gaia impact on asteroidal occultations
Fabio de Oliveira Fialho Michel Auvergne
Launch and On-orbit Checkout
Community Science with TESS Thank you.
LHC Position Data The presentation follow-up from:
Working with corrections
Some preliminary results from the exochannel
Search and Characterization
Presentation transcript:

N0--> N1 Chain Includes corrections of all the known instrumental perturbators - electronics: offset, EMI, gain - Time integration - Sky background - SAA (6%, imagettes for sismo) - Jitter - Outliers Some corrections are quite complex

PSF fitting on imagettes mv=9.1, delta scuti Onboard aperture photometry PSF fitting at 32s Needs the knowledge of the PSF

Jitter corrections (sismo) CID 83, mv=9.3 After jitter correction

Jitter corrections (exo) On a 13mag star

Where are we? N0--> N1 Chain is not totally operational N0 arrived late.. (GMV/CNES) Not yet complete (ex: temperature corrections) Effects not foreseen e.g. reaction to eclipses, hot pixels… unexpected out of focus (120m) pb of manpower…… N1 Archive is operational at IAS-medoc N1--> N2 Chain is specified Many softwares are already developped Several problems remain…… PSF fitting long term trends….

Planning of delivery From: Scientific Policy and Data Rights COROT.DESPA.01.014, version 4 26/05/06 * The preliminary results e.g. detection of candidate planets and detection of oscillations, or other topic of prime interest, will be published by the CSC as soon as possible before any scientific interpretation. *The data will be delivered to the IAS Archive and accessible by all the Co-Is and Guest Investigators after validation by the CSC, approximately six months after the end of each run. * One year after the first release of a set of data to the Co-Is and the Guest Investigators, the access of this set will become public.