CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Advertisements

366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
Sections SECTION C3 SECTION B1 SECTION A2 C B A38414 E Click a surface to view a section from close by Next.
Reconstruction of the Eads Bridge Highway Deck
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Kevin de almeida construction & structure srt 259 office showroom/ware house major project.
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
ARCHITECTURAL DESIGN STUDIO I ARCH 201
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Barton St Peter’s Advent Calendar.
M AJOR T AYLOR Cycling Center AN URBAN COMMUNITY CYCLING FACILITY.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Building Plans.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
BY NGETICH KIPYEGON 2012/BC/25435 Dept of Building Construction Narok Technical Institute. 1/21/2016.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
Cross Wall Construction
Foundation Portfolio. frame Deploy Operating Object.
SYSTEM SELECTION & SPACE REQUIREMENTS INTRODUCTION SYSTEM SELECTION SPACE REQUIREMENTS SAMPLE QUESTIONS.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Symbols and Room Finishes
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
White Pigeon Community Schools
Final team building Presentation
Learning Objectives • Add various components to a building model.
Part 7 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Welcome to the St. George Manor Renovations…..
Flat slab Structures VI.
Multistory Office Building
Ordnance Survey Maps: Symbols and Grid References
Total Fitness Gym By Student Architect Jhonatan Rubio
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
وكيفية عمل التقدير النجمي
Land Use Planning - Goals
Presented by Mrs. Estes’s 4th Grade Class of
Progress Report 11/10/11.
Building Construction
التدريب الرياضى إعداد الدكتور طارق صلاح.
Arch205 building construction wall systems
The Derivative as a Function
1 Semester Project Design A Multi Story Office Building
A Distribution Network
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
City of Ocala Leadership Group Meeting February 25, 2016
The sport hall.
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Special Valuation Montvale Hotel 1005 W. 1st Avenue
Preposition of Place.
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Alberto Class Ms. Belfer June 2006
Where is Bullying happening at AMS?
In the street.
RiverView Condominiums II Chicago, IL
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Presentation transcript:

Team 3 Meilledjine Francois Jean Carlos Gusman Lisset Garcia Rabiul Hassan

Building Introduction Location: 42 Red Cross Place Brooklyn NY 11201 Designed by: Starky Acevedo MF

Building Analysis (Structural Grid) There are two major grids on each that follows the rhomboid and one that follow the orthogonal section. MF

Building Analysis (Mechanical systems) There will be a mechanical room in each of the floors. Proposed supply and return ducts MF

Building Analysis (Egress)

Building Analysis ( Vertical Circulation) MF

Site Analysis KEY SCHOOLS NOISE BUS | TRAIN STATIONS CITY BIKES CADMAN PLAZA KEY SCHOOLS NOISE BUS | TRAIN STATIONS CITY BIKES ONE WAY LANE TWO WAY LANE PARKS WHITMAN PARK LISSET GARCIA T.

Precedent Case Study RH

Programming of space(Existing rooms) 1st Floor 2nd Floor 3rd Floor JG

Program of Spaces( changes) JG

Building Material review

Façade Choices( Curtain Wall) Stick Curtain Wall Spider Clamps mf

Walls Load bearing masonry walls

FAÇADE MATERIALS RESEARCH Precast Concrete Walls : Composite Panels https://www.pinterest.com/pin/25895766581926062/ http://catalogue.pearsoned.ca/assets/hip/ca/hip_ca_pearsonhighered/samplechapter/0132148692.pdf LISSET GARCIA T