HMA-FO Task 1 EOP Metadata

Slides:



Advertisements
Similar presentations
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
Advertisements

Copyright © 2010, Open Geospatial Consortium, Inc. Met Ocean Time Issue Resume Met-Ocean DWG 72nd OGC Technical Committee Frascati, Italy 8 March 2010.
Effect of Surface Loading on Regional Reference Frame Realization Hans-Peter Plag Nevada Bureau of Mines and Geology and Seismological Laboratory University.
MR P.Durkee 5/20/2015 MR3522Winter 1999 MR Remote Sensing of the Atmosphere and Ocean - Winter 1999 Active Microwave Radar.
Propagation characteristics of wireless channels
ODINAFRICA/GLOSS Sea Level Training Course
OC3522Summer 2001 OC Remote Sensing of the Atmosphere and Ocean - Summer 2001 Active Microwave Radar.
GEOF334 – Spring 2010 Radar Altimetry Johnny A. Johannessen Nansen Environmental and Remote Sensing Center, Bergen, Norway.
Tide corrections from KGPS and a precise geoid John Brozena, Randy Herr, Vicki Childers.
® OGC/WMO Hydrology Domain Working Group HIC’2014 Seminar. Introduction. August 16, 2014 CCNY, New York Ilya Zaslavsky (USA), Tony Boston (Australia),
Tide corrections from KGPS and a precise geoid
Hydro DWG at the RDA Plenary BoF - Improve sharing of water resource data globally 24 September BREAKOUT :30-15:00.
1 July 20, 2000 Geosat Follow-On An examination from an operational point of view Impact on operational products Overall system performance (from sensor.
ESA UNCLASSIFIED – For Official Use INSPIRE Orthoimagery TWG Status Report Antonio Romeo ESRIN 15/02/2012.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
SCM x330 Ocean Discovery through Technology Area F GE.
WP120 External Calibration of Spaceborne Microwave Remote Sensing System Sensors Objective:Evaluation of external calibration needs for a variety of microwave.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
HMA-FO ODA, February 2010 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Preliminary.
Satellite Altimetry. The range R from satellite to mean sea level is estimated by.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
MIWG-8 Update TG Metadata Michael Östling Status Rome.
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
The validation and user assessment of the SL-CCI products has been performed through: - Internal consistency check and comparison with in-situ data. -
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
Oceanographic Applications:
THE RADAR EQUATION ELC 451.
HMA Follow On Activities
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
Technical Meeting ESA/ESRIN,
HMA Follow On Activities
HMA Product Metadata Workshop
Ordering Services for EO Products SWG ATS / ETS
HMA Follow On Task 1 Standards evolutions
THE RADAR EQUATION ELC 451.
Ordering Services for EO Products SWG ATS / ETS
SMAAD Project Semantic Annotation and Mediation
HMA Follow On Activities
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
HMA Follow On Activities
Contributions to Testing and Reference Data
Standardisation Status Update
Introduction to the WMO/OGC Hydrology Domain Working Group
CITE tests for and HMA-T Phase 2 Progress Meeting
ESS.VIP VALIDATION An ESS.VIP project for mutual benefits
HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM
HMA Follow-on Kickoff Meeting
HMA-T: “EO GML” and “EO ebRIM CSW” for VITO CVB
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
Pier Giorgio Marchetti - European Space Agency
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
Presentation transcript:

HMA-FO Task 1 EOP Metadata Darmstadt September 2009 Frédéric Houbie, ERDAS

Agenda Introduction to HMA-FO Task 1 objectives Improving the current specifications using MDA, O&M, … Output of HMA-T : management of VGT products Presentation from STFC Presentation from EUMETSAT/CNES/CLS Presentation from GECA (given by S. Smolders) OGC CR to fulfill the HMA-FO requirements Slide 2

Structure Consortium structure Proposed Work Plan Proposed Schedule EO Product Metadata Structure Proposed Extensions Proposed approach OGC Process Validation of the approach Proposed Schedule © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Consortium structure Consortium leader OGC Standardisation process Test suite New schemas for systematic & synthesis products Implementation in HMA Skeleteon & SSE client New schemas for radar altimeter & limb looking products © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Proposed work plan WP1000 Project Management WP2000 Analysis of the extensions and update of EO GML T2100 Document Update & OGC Process T2200 Synthesis and Systematic products T2300 Radar altimeter, limb looking products & new schemas WP3000 Tests T3100 SSE T3200 CITE WP 4000 OGC Process © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Current EO Product Metadata stack © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Proposed extensions Radar Altimeter Limb-looking products Systematic and Synthesis Products © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Radar Altimeter No particular problem to handle this new model in the current EOP basic structure tree In principle, the altimeter's operation is straightforward (Figure 3): timed radar pulses are used to measure the distance, h, between the satellite platform and the instantaneous sea surface. With knowledge both of the satellite’s orbit relative to the earth's reference ellipsoid, O, and the geoid, N, the sea-surface height (SSH) relative to the geoid is then known:  = O-N-h To be useful, the SSH should be determined to O(cm) accuracy, placing severe requirements on geoid knowledge, the altimetric radar, and knowledge of the satellite’s orbit. To achieve sufficient altimeter accuracy, several corrections must be made to the measured SSH. Delays in the altimeter signal are caused both by tropospheric water vapour and ionospheric free-electron content, both of which vary in space and time and must be corrected for. The radar pulse transmitted from the altimeter has a “footprint” diameter of several kilometres. Over this area, the reflected signal is affected by the sea-state: maximum energy in the return pulse generally does not correspond to reflection from the mean sea-surface. These so-called electromagnetic bias effects contribute significant errors that are difficult to correct. Local atmospheric pressure loading on the ocean produces changes in sea-level of the order of one cm per millibar. This “inverse barometer” effect must be compensated accordingly. Finally, the ocean's tides are generally ignored for oceanographic problems, so must be modelled and removed from the measured SSH signal. © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Limb looking products Limb viewing instruments view the limb of the atmosphere – this could be sideways-viewing, backwards-viewing or a combination. Issue : geolocation information, currently extend is limited by schematron rule and only in WGS84 Will have to extend the geometry information to 3D and other CRS © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Systematic and Synthesis Products Combined EO products (ex VGT started in HMA-T2) Already a set of comments in the OGC SWG Extension of CompositeType Improvement of processingInformation Linking between EO Products to be analyzed and improved © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Proposed approach Objective = describing and cataloguing the new products Analyze the data Extract important metadata Create new product type metadata and/or extend existing levels (using new methods like MDA, O&M, ...) Extend/Improve the current EO EP to facilitate storage and discovery of metadata © ERDAS, Inc. A Hexagon Company. All Rights Reserved

OGC Process Continue the current process of standardisation of EO GML and its cataloguing model, EO EP Important to bring domain people in the discussion (was lacking in HMA-T).  Open a Public OGC Wiki for EO GML & EP discussion (like in METEO DWG), without OGC membership required. Of course only OGC members will vote. Obtain quickly a draft updated document (KO + 8 at the latest) to allow validation by CITE and SSE that it fulfills the requirements, then start the standardisation process of vote with the argument that it is implemented and functional. © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Validation of the approach SSE / HMA-Skeleton New request/response to validate Integration in SSE workflow CITE tests Update of existing CITE scripts Creation of new ones for new products type Update existing schematron files © ERDAS, Inc. A Hexagon Company. All Rights Reserved

Project Schedule Slide 14