Progress of the POPs GMP 2 in Indonesia

Slides:



Advertisements
Similar presentations
Experience of City SoE Process in Indonesia Siti Aini Hanum and Sri Murwani N Assistant Deputy for Environmental Information Data Ministry of Environment.
Advertisements

The first laboratory for asbestos analysis established in Mongolia 07 Aug 2013 WHO Mongolia Office.
BoRit Superfund Site Timeline
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
Zambia Environmental Management Agency Development of NIPs for POPs in Zambia By David Kapindula Inception Workshop held at Radisson Blu Hotel, Lusaka.
GHS Conference for ASEAN Implementation Towards 2008 and Beyond 9-11 May 2007,Yakarta, Indonesia By: Lao Delegates Vientiane Capital City, Lao PDR.
Chubaka Producciones Presenta :.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Indonesia Population Density urban rural Indonesia Industrial Growth.
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
MINISTRY OF HEALTH OF THE REPUBLIC OF INDONESIA THE 2 ND WORKSHOP OF ASEAN FOCAL POINT ON HIA “CONSTRUCTING A CARING AND SHARING COMMUNITY: ROLES OF HIA”
Malé Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Presentation on the Bangladesh National.
1 Preparing VPA in Indonesia through multi-stakeholders process Presented to Illegal Logging Update and Stakeholder Consultation Chatham House, London.
Compliance and Enforcement Priorities and Successes in Indonesia 2008 AECEN Regional Forum November 25, 2008 Bali, Indonesia Rosa Vivien Ratnawati MINISTRY.
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
Malé Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Presentation on the Bangladesh National.
Ability to Respond by Health Services Plan before an eventual Pandemic CHILE MINISTRY OF HEALTH Dr María Brito April 2006.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Male’ Declaration Work Plan in 2007/08 by Secretariat UNEP.
Review in slides Indonesia
SDCG-4, Caltech, CA, USA 4 th -6 th September 2013 Author/Presenter Indonesia MRV & Reporting Status & Related Space.
Capacity building and awareness creation in Vietnam UNEP The first regional workshop and training on capacity development for clean development mechanism.
STRENGTHENING GERMPLASM SECURITY FOR NGOS AND SMALLHOLDER FARMERS IN INDONESIA By Fransiskus Harum and James Roshetko Delivering trees to farmers: improving.
National and regional activities for environment observations Natalya Shulgina Uzhydromet World Environmental Day Round Table GEO CBC7 Meeting 5 June,
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. Status.
Male’ Declaration Male’ Declaration Work Programme for 2010 by Secretariat UNEP.
Male’ Declaration Male’ Declaration Review of Progress in Phase III by Secretariat UNEP.
Development of Safeguards Information System (SIS) for REDD+ : Indonesia’s experience Rio Convention Pavilion – COP21 Paris – France, 7 December 2015 Novia.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Annual Network Meeting:2004 Male Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Project.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
UNEP activities for QSP strategic priority B Kaj Madsen DTIE, Chemicals Branch.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
CIVIL REGISTRATION AND VITAL STATISTICS IN INDONESIA.
INTOSAI WGEA Secretariat 8 th KSC Meeting Mexico City, September 7, 2016 Progress Report INTOSAI Working Group on Environmental Auditing.
EDM Strategy for Working with Countries: the Uganda Example
Prof. dr. Giedrius Vanagas
Livestock Waste Managerment Project in East Asia
16-18 January 2003, Phuket, Thailand
© The Author(s) Published by Science and Education Publishing.
Organized by MAFF-NSSU Supported by ADB-TA8163
World Meteorological Organization
HIGHLIGHTS OF UPSTREAM GOI POLICIES
Lao People Democratic Republic
EDUCATION FOR ALL GOAL 1 ECCE
Global Youth Tobacco Survey (GYTS): Proposal Development
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Prof. dr. Giedrius Vanagas
Update on “IPPC implementation” and “Competitiveness” studies
GOVERNMENT OF INDONESIA,
13-block rotation schedule
PMI Strategic Plan Indonesia Adaptation Strategy 2011
Progress Report INTOSAI Working Group on Environmental Auditing
Indonesia Sales Performance
PAIN OUT network in Mexico
THE NATIONAL HYDROGRAPHIC COMMITTEE OR EQUIVALENT
Progress of OIE Regional AI Programme in Southeast Asia
Map of INDONESIA.
McDonald’s calendar 2007.
Study on the Experience and Actions of the Main European Actors Active in the Field of Development Education and Awareness Raising (DEAR) Karina Chircu.
Pilot-Study Update for WG E - March 2012.
Habitat Changes and Fish Migration
Development of a global plan for monitoring of human exposure to mercury Irina Zastenskaya, Dorota Jarosinska WHO European Centre for Environment.
Mid-term review: “CONTINUING REGIONAL SUPPORT FOR THE PERSISTENT ORGANIC POLLUTANTS (POPs) GLOBAL MONITORING PLAN (GMP2)” under the Stockholm Convention.
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Passive Air Sampling Pacific
Presentation transcript:

Progress of the POPs GMP 2 in Indonesia 8 August 2018, Ulaan bataar, Mongolia

Progress Activities on POPs GMP 2 Preparation meeting (4 Mei and 31 Mei 2017) Small Scale Funding Agreement (SSFA) under the GMP2 Asia was prepared on July 2017 Ministry of Environment and Forestry (MOEF) conducted several meeting with Ministry of Health (MOH) and Laboratories to discuss about the implementation of the 6th round of the human milk survey Meeting on 15 September 2017 (with MOH) Meeting on 20 September 2017 (with 8 public and private laboratories ) Meeting on 5 October 2017 (with MOH) Meeting on 9 October 2017 (with MOH) SSFA under the GMP2 Asia was signed on Dec 2017 (UN) - Jan 2018 (MOEF) without human milk survey 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Progress Activities on POPs GMP 2 Location of air sampling monitoring Urban Area at Indonesian Agency for Meteorology, Climatology and Geophysics (IAMCG), Kemayoran, Jakarta Coordinate: 6°9'21" S 106°50’32” E 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Progress Activities on POPs GMP 2 Location of air sampling monitoring Urban Area at Indonesian Agency for Meteorology, Climatology and Geophysics (IAMCG), Kemayoran, Jakarta Coordinate: 6°9'21" S 106°50’32” E 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Progress Activities on POPs GMP 2 Location of air sampling monitoring Urban Area at Indonesian Agency for Meteorology, Climatology and Geophysics (IAMCG), Kemayoran, Jakarta Coordinate: 6°9'21" S 106°50’32” E 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Progress Activities on POPs GMP 2 Air sampling monitoring (PUF sample installation and collection) First monitoring on 30 November 2017 – 2 March 2018 Second monitoring on 3 April 2018 – 2 July 2018 PUF sample result analysis PUF no 1,2,3,4,9 and 10 sent to Prof. Dr. Jacob de Boer c/o. Ms. Rianne van Dijk, Vrije Universiteit Amsterdam, The Netherlands PUF no 5 and 11 sent to Prof. Dr. Heidelore Fiedler, MTM Research Centre, Örebro University, School of Science and Technology, Sweden 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Documents Prepared on POPs GMP 2 Report of PUF installation and collection Time schedule and plan activities for human milk survey, air sampling and sediment sampling Minutes of meetings 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Documents Prepared on POPs GMP 2 Summary sheet 0f exposures Meteorological data on the site sampling location 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Pictures of Activities on POPs GMP 2 Meeting with Indonesian Agency for Meteorology, Climatology and Geophysics (IAMCG) Meeting with Ministry of Health 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Pictures of Activities on POPs GMP 2 PUF are kept inside refrigerator at Research and Development Center for Environmental Quality and Laboratory, Serpong Preparation and installation of the PUF sample and the PUF sample collection at IAMCG 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Pictures of Activities on POPs GMP 2 Set of air sampling collection 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Plan on National Matrices Matrices: fish, water, soil and sediment Step: Consult with international expert (August 2018) Discuss and plan in national level (Q IV 2018) Conduct sampling (Q I-II 2019) Analysis National laboratory (Q II-III 2019) International laboratory (Q II-III 2019) 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Concerns Difficulty with national authority (Ministry of Health) for the human breast milk sample analysis abroad Large area and high population to collect representative sample for human breast milk (if the project run) Current capability 13 POPs monitoring at Research and Development Center for Environmental Quality and Laboratory, Serpong, need to increase capacity building (equipment and human resources) to analyze new POPs Number of sample (national matrices interest soil and sediment) can be sent to be analyzed 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Concerns Samples needed for human breast milk survey Province Population Number of sample 2010 2015 Sumatera Island 50,630,931 55,272,900 55 Jawa Island 136,610,590 145,143,600 145 Bali dan Nusa Tenggara Islands 13,074,796 14,108,500 14 Kalimantan Island 13,787,831 15,343,000 15 Sulawesi Island 17,371,782 18,724,000 19 Maluku Islands 2,571,593 2,848,800 3 Papua Island 3,593,803 4,020,900 4 INDONESIA 237,641,326 255,461,700 255 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia

Thank you 11/27/2018 POPs Global Monitoring Plan 2 in Indonesia