Thesis Presentation Devin Learn Construction Management Dr. Messner

Slides:



Advertisements
Similar presentations
CREATING AND RUNNING WASTE-MANAGEMENT & MATERIALS RECOVERY PROGRAMS IN COMPLEX ORGANIZATIONS WILLIAM BORGES CREATING AND RUNNING WASTE-MANAGEMENT & MATERIALS.
Advertisements

Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune December , 000 sq ft ExpansionTotal.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Introduction Decision trees Decision trees enable one to look at decisions: alternativesstates of nature with many alternatives and states of nature which.
VM SAVE International providing value ….. to the world VM Briefing SAVE International introduces “ Value Methodology ” Presentation version 1.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Diagram Activities.
Project Plan Development
Feasibility Studies IAE Week 2. What is a Feasibility Study Is this a good business idea? Helps answer the question of whether to go forward with the.
MANAGING Tough Times What is a Feasibility Study Is this a good business idea? Helps answer the question of whether to go forward with the business idea.
Deerfield Beach Fort Pierce Jacksonville. Agenda Business Issues KAMM Capabilities KAMM Experience Why KAMM Business Issues KAMM Capabilities KAMM Experience.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
MnDOT Project Management History and Future MnDOT – ACEC/MN Annual Conference March 5, 2013 Earle Brown Heritage Center.
Ch. 9: Site Selection and Layout Planning
Project Delivery Selection Approach Keith R. Molenaar, PhD CDOT CM/GC Workshop Denver, CO February 7, 2012.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
New Tools in an Old Company PMI Honolulu Chapter Meeting June 20, 2007.
Information Retrieval Evaluation and the Retrieval Process.
SDC Migration Project Status Report January 2012.
Welcome Scenario Planning October 2013 Atul Patel.
The Role of the Design Engineer in Technology Development 3/21/13 Auburn University Robert Kline.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
The Resource Problem Resources and Priorities
Profile Organisation & Management (O&M). Types of students Researchers: are curious Designers: are creative and constructive Managers: deal with processes.
Pandemic Vaccines Current and Future Issues 30 January 2007 Beijing Keiji Fukuda Global Influenza Programme.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
North Augusta High School Design Development Presentation.
Calaveras County Alternate Care Site Project Douglas E. Buchanan Disaster Preparedness Consultant.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
Legal challenges in reviewing application for final disposal of spent fuel Tomas Löfgren.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
COA 8903 Strategies for IT Adoption in the Building Industry Amol Kane Construction Engg & Management Georgia Institute of Technology ELEVATORS.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
PHARMACEUTICAL INDUSTRY
Overview of Intervention Mapping
(84th Session) Decisions
Documentation and Risk Assessment
RETAP Retired Engineer Technical Assistance Program
The AHRQ Safety Program for Improving Antibiotic Use
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Decision Making A quick and simple system for decision making.
مراجعة عامة.
“The best design is the simplest one that works.” Albert Einstein
Sharpening Your Counseling and CTAE Tools
A Training Design Tool for Stakeholders Tasked with Evaluating New and Innovative Treatment Technologies for Small Drinking Water Systems Be sure to type.
COMMUNITY CAPACITY ASSESSMENT
Intro Slide Mr. Coyle.
Tool for investigations
the Franklin Square Hospital Center
Senate Council Meeting 21 January 2016 The Citizens’ Assembly Response
Physiotherapy following Surgery
Wellington Condominiums Project
Process Activity Action Outcome Select Sector/SubSector
Children’s Hospital Update
Management and risk assessment Highly Infectious Diseases
05 November 2018 Offsite data for onsite assembly Rob Gardiner Armstrong Ceilings Commercial Technical Manager EMEA.
HOME CARE & MONITORING A County Story – 5 Years On… Ian Benson

CONVENTIONAL FACILITIES LCLS Office Space
Lesson 2 Risk Management Issues.
CONVENTIONAL FACILITIES LCLS Office Space Procurement
North Augusta High School – Phase 2A and 2B
Generating Sequences © T Madas.
Risk Matrix Purpose quantify the level of risk existing in a technology ensure that all milestones are focused on reducing risk identify those milestones.
The New Leavelle McCampbell Middle School
Presentation transcript:

Thesis Presentation Devin Learn Construction Management Dr. Messner Lancaster General Hospital 5th & 6th Floor Fit-Out, Cardiac Elevator Lancaster, Pennsylvania 11/29/06

Analysis #1: Commissioning This technical analysis will look at the effectiveness of commissioning on fit-out type construction projects focusing on healthcare/hospital facilities. In order to conduct this research the following steps should be used. Review existing literature on commissioning of healthcare/hospital facilities. Determine benefits and decision making process of commissioning. Catalog research information into decision making matrix.

Analysis #2: Infection Control Risk Assessment This technical analysis will look at the importance of infection control risk assessment focusing on sequencing and schedule reduction. In order to conduct this research the following steps should be used. Review literature on infection control risk assessment and requirements for healthcare/hospital facilities. Determine locations and types of assemblies that will be used to satisfy these requirements. Identify sequence of work that will require the least amount of rework or movement of these assemblies to complete the project with the least amount of risk.

Analysis #3: Constructability This technical analysis will look at the constructability issues of the cardiac elevator addition in an isolated site within the hospital complex. In order to conduct this research the following steps should be used. Identify constructability issues for the cardiac elevator addition. Research alternate methods of construction.