5GSG Hilton Head, South Carolina March 2001 5GSG Hilton Head, South Carolina Thursday March 15, 2001 Bruce Kraemer, Intersil
5GHz Study Group Original Intent International effort IEEE, ETSI, MMAC March 2001 5GHz Study Group Original Intent Standard Harmonization - Single Global Standard International effort IEEE, ETSI, MMAC Interim Objective Interworking mechanism Interworking Proposals Legacy backward compatibility maintained AT&T, Philips, Ericsson, hLAN, NEC, U of Aachen, Comprise, Magis Principal approach so far based upon superframes using either DCF or PCF No impact on Client, AP implementation only Future plan 5GHz Partnership Project Motions Bruce Kraemer, Intersil
5GHz Standardization Roadmap March 2001 5GHz Standardization Roadmap IW additions IEEE 802.11a (wireless Ethernet) IEEE 802.11e/f/h (QoS, Security, DFS/TPC, ..) Joint SG Requirements Coexistence Inter-working Spectrum 5GPP Partnership Project (BRAN/IEEE/MMAC) Inter-working Standards Revisions single global standard 5GWIAG BRAN-HL/2 (wireless ATM, IP) Home Profile HE phase2 UMTS - interworking Public Access IW additions 2000 2001 MMAC also participating Today Bruce Kraemer, Intersil
Convergence Progression March 2001 Convergence Progression Single Global Standard Now Now Implementation Issue (2 radios) Interwork Interworking Single Global Standard MAC Bridge MAC Bridge MAC Bridge MAC Bridge MAC Bridge MAC Bridge MAC Bridge H2 CL 11 MAC H2 CL 11 MAC H2 CL 11 MAC H2 CL 11 MAC Hybrid MAC/DLC H2 CL Hybrid MAC/DLC/CL H2 DLC H2 DLC H2 DLC H2 DLC MAC/DLC Convergence Layer H2 PHY 11a PHY H2 PHY 11a PHY Hybrid PHY Hybrid PHY Hybrid PHY Hybrid PHY Choose one step in gray parts Bruce Kraemer, Intersil
PProposed that we extend the 5GSG to the next joint plenary. March 2001 Motions: PProposed that we extend the 5GSG to the next joint plenary. Motion passed in study group 36/0/0 Motion passed in plenary 74/6/4 PProposed that we accept the PAR document (172) and present it for approval by the 802.11 closing plenary. Motion passed in study group 14/1/7 PProposed that we accept the 5 Criteria document (173) Motion passed in study group 26/0/7 PProposed that we pursue the creation of a 5GHzPP as a vehicle for establishing a single global standard. Motion passed in study group 23/0/1 Bruce Kraemer, Intersil
9. Scope of Proposed Project: March 2001 9. Scope of Proposed Project: Establish coexistence and inter-working among the 802.11a, ETSI HiperLAN/2, MMAC CSMA and HiSWANa standards. Extension of each of the MAC and PHY layers of these standards will be defined collaboratively to achieve coexistence and inter-working. 10. Purpose of Proposed Project: To establish coexistence and inter-working among the 802.11a, ETSI HiperLAN/2, MMAC CSMA and HiSWANa standards. A subsequent project under a separate PAR is to create a single converged standard in the 5GHz band. Bruce Kraemer, Intersil
5GSG Motions for 802.11 Closing Plenary: March 2001 5GSG Motions for 802.11 Closing Plenary: Move that we accept the PAR document (11-01-172) and present it to the 802 Executive Committee for approval. Motion passed in Study Group 14/1/7 Motion passed in plenary 41/8/17 Move that we accept the 5 Criteria document (11-01-173) Motion passed in Study Group 26/0/7 Motion passed in plenary 42/6/13 Bruce Kraemer, Intersil