DTP 7th meeting – Bern September 2011

Slides:



Advertisements
Similar presentations
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Advertisements

Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
WLTP-DTP Subgroup Additional Pollutants September 2011 WLTP-DTP Additional Pollutants Subgroup Validation phase 2? 2011 Bern, EU-WLTP 7 th DTP Meeting-13.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
DTP/DHC update. DTP 13 th to 15 th April, EPA, Ann Arbor Chair: Michael Olechiw (co-chair from India unable to attend) No great advances were made in.
How do You Fit within the Process? Roles and Responsibilities – Pre CAB (1/2) 1 Change Requestor Initiates the Change Request (CR) in Service-now Includes.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
AutoDESA Presentation Project Documentation October 2005.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
1 Comparison of the worldwide weighted WLTP database and EU regional database with WLTC rev3 and further modifications performed by JARI, JRC and HS Heinz.
WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa.
FIELDS Phase C/D Overview March 14, FIELDS Phase C/D Overview Discussion regarding Phase C/D Contracting Schedule – Release of Draft SOW to UCB.
MPM 3013 PROJECT MANAGEMENT GROUP 5 – MACAM YES! PROJECT PROGRESS DRAFT.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Welcome to the 7th Meeting of.
Participatory Monitoring and Evaluation of Community Projects – A Model Pretoria, South Africa 30 November – 3 December 2009.
WLTP - Validation Phase 2 (acceptability of the new test procedure)
Journeys into journals: publishing for the new professional
WLTP Phase 2 Durability Task Force Update
Online Economic Development Workshops November 14, 2006 Tips for Proposal Writing To participate online, and to view archived sessions, PowerPoint presentations,
Drafting Coordinator Report
Green Entrepreneurship Programme: Development of the Incubation Phase Ramon Farreny, Fern Marie Bowles, Anna Ibáñez, Nicola Cerantola.
Guideline prepared by the Veterinary Harmonisation Group
Recommendations from the Stage 3 Trial Review
September 2017 Phillip Godorov Caitlin Farrell
Town Hall briefing to the AMTSO membership
DTP12 Report to GRPE 17th January 2013 Palais des Nations
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
Transportation Impact Analysis Guidelines Update Phase II
WLTP - Validation Phase 2 - Analysis of results
Multi-Sectoral Nutrition Action Planning Training Module
Development of draft test procedures
Air Pollution Control and NIR Division
September 6, 2017 Block.
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
WP 2: Align / synchronise progress reporting under both directives
Chemical Monitoring mandate
34th MIG-T meeting – Conclusions and actions
Step 1 Know the guidelines!.
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Passenger Mobility Statistics 21 May 2015
PN-PEMS Progress update
Informal document GRPE-78-23
Work plan and next steps – RDE-LDV working group
François Rancy Director, ITU Radiocommunication Bureau
Additional Pollutants Subgroup 7th DTP Meeting-13 September
INSPIRE Development of Implementing Rules
GRPE/WLTP-IG/ DHC subgroup
Reporting and Water Information System for Europe (WISE)
Working Paper No. WLTP-05-11e
Proposed actions for gtr development
Objectives and expectations from the AiP WG Tashkent, October 2017
Air Pollution Control and NIR Division
Learning Target: Students will provide constructive feedback to each group’s draft proposal to aid in the revision process. Language Objective: Students.
Working Party on General Safety Provisions (GRSG) General information
WLTP-DTC Air Pollution Control and NIR Division
Roadmap for finalization Phase 1A DTP subgroup LabProcICE
Working Group “Real-Driving Emissions of Light-Duty Vehicles” Work Progress – December
The Road to budva Budva, March
Working Paper No. WLTP-05-10e
Palais des Nations, Geneva
WLTP - Validation Phase 2 - Analysis of results
Presentation transcript:

DTP 7th meeting – Bern 12-14 September 2011 Update on the preparation of Validation Phase 2 (feasibility of the new test procedure with the WLTC) Alessandro.Marotta@jrc.ec.europa.eu

Roles and responsibilities

VTF - NEXT STEP Collect the Parameter List from the DTP subgroups by the end of this week (16 September) Get a revised version of excel template for results submission (H. Steven) Propose a Test Sequence for Validation Phase 2 (Ichikawa-san/ Celine) Members of the VTF will contact the respective laboratories to discuss about the Parameter List , Test Sequence, excel template Feedback from these discussions will be communicated to DTP subgroups (and, if needed, DTP subgroup will be asked to integrate/clarify the Parameter List) before the end of September By end of September / beginning October, the draft Validation Phase 2 detailed plan and draft Technical Guidelines will be distributed to DTP/DHC members and to participating labs.

VTF - NEXT STEP (less urgent) Test matrix Vehicle selection Assessment criteria