Enter Participant Organization here Enter System / Activity Name here

Slides:



Advertisements
Similar presentations
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Advertisements

[Insert Project Name] Detailed Design Review (DDR) [Insert Date of DDR] Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC)
Network Design and Implementation
MTS Delivery Development © 2009 IBM Corporation EMEA GLOBAL Total Microcode Support (GTMS)
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
EE 496 Poster Session Instructions Rev. 2/9/15 WS.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
SDPI Competitive Grant Program SDPI Competitive Grant Program: Additional Instructions for Completing the CGP Continuation Application Budget Summary,
Writing a Research Proposal. Need of Proposal Term Paper, Capstone Project, Thesis, etc. External or Internal Funding Solicited Unsolicited Others.
Cougar Scheduler and Logistic Services One-Stop Shop For Services, Equipment & Staff Cougar Kickoff Bike Ride Welcome Back Picnic 2010.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Applications of OO System Engineering Methodology and Tools for Complex Systems9/11/2015 Application of Object Oriented Systems Engineering Methodology.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Just a few reminders ……. Agenda  General Guidelines Types of Awards Enrollment Calculation Tool Tips  Application Document Family Homes & Group Homes.
2.01 Organization Skills. Types of Tournaments Single elimination/multistage Double elimination Round robin Scramble Heat.
Just a few reminders ……. Agenda  General Guidelines Types of Awards Enrollment Calculation Tool Tips  Application Document Site Supports Professional.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
Lockheed Martin Aeronautics Company Candidate Collaborative Projects for Net-Centric Application Michael F. Siok, PE Lockheed Martin Aeronautics Company.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
Chapter 12 Integrated Information Systems for Chronic Care: A Model Linking Acute and Long Term Care.
Greater Boston Police Council January The GBPC Organization The GBPC is non-profit corporation. The GBPC is governed by a Board of Directors, comprised.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
1 Updating the ESnet Site Coordinator Model (Presented to SLCCC, June, 2004) Joe Burrescia Mike Collins William E. Johnston DRAFT FOR COMMENT 7/19/04.
SIRFN Capability Summary Name of Institution Introduction Summarize the technical abilities of your facility and how it is organized. Briefly note the.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Internet2 Applications Group: Renater Group Presentation T. Charles Yun Internet2 Program Manager, Applications Group 30 October 2001.
JNTC Joint Management Office
State of Georgia Release Management Training
2.01 Organization Skills. Types of Tournaments Single elimination/multistage Double elimination Round robin Scramble Heat.
Quad Chart – Format Photograph or artist’s concept of the project end- item. Ideally, this will convey the main idea of the final capability/use of the.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
4-1 Use of Feasibility Studies and Consultants National Food Service Management Institute The University of Mississippi.
Introduction to FFI: Why and how FFI was developed Introduction to FFI: Why and how FFI was developed 04/02/2013.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
In-House Course Option Chapter Sponsored. Purpose: To give flexibility to CSSE Chapters to provide Professional Development or CHSC courses to their members.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
Logistics Engineering and Management Hank Okraski 26 October 2013 Refer Unit 11, M&S Curriculum.
Cisco Collaboration Compatibility (IVT) Pricing April 2015.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Chapter 16 Overview: Writing Proposals
Office 365 Security Assessment Workshop
State Coordinator Intervention
Chapter 2 Information Systems in Organizations
DoD Cyberspace Workforce Definitions
DoD Architecture Tools, Commercial Tools
Software Planning Guidelines
Flooding Walkdown Guidance
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Defining the Activities
Public Employees Retirement Association Infrastructure Upgrade
DoD Cyberspace Workforce Definitions
Exercise Sandalwood: London Region
ANNUAL PERFORMANCE REPORTS
Public Employees Retirement Association Infrastructure Upgrade
DESCRIPTION: APPLICATION:
The Service Portal What is the Self-Service Web Portal?
LHCb Computing Project Organisation Manage Steering Group
Site (e.g., LARC Embakasi)
Brian Wade PEO SOFSA OR NOT
Project Management Method and PMI ® PMBOK ® Roles
Project Title This is a sample poster layout -
Brian Wade PEO SOFSA OR NOT
Graphical Representation of the Technology
Site (e.g., LARC Embakasi)
Title or label as appropriate Operational and Performance Capabilities
Presentation transcript:

Enter Participant Organization here Enter System / Activity Name here Facility Usage and Technology Demonstration Participation Package For: Enter Participant Organization here Enter System / Activity Name here Version X.X Date: Day Month Year

Basic Information Enter name Enter objective Name of Activity/System Enter name High Level Objective Enter objective Anticipated Timeframe Enter timeframe (dates / schedule of the event) Primary Benefits List high-level benefits to DoD Participant Enter Government / Corporate Office Name Sponsor Enter Government sponsor, if applicable (name, organization, role, telephone & email) Points of Contact Management POC: (name, organization, role, telephone & email) Technical POC: (name, organization, role, telephone & email) PD C4ISR & Net Mod Point of Contact To be filled in by PD C4ISR & Net Mod

Quad Chart Title High Level Diagram Technical Description Identify any high-level technical objectives Describe what the system does and its primary data interfaces Describe expected results Identify deliverables (e.g. software, reports) Visually describe the system and its main components (e.g., DoDAF OV-1, photograph) Operational Description Supporting Information Number of live system quantities M&S (as appropriate) Timeframe available for integration, pre-testing, execution, wrap-up Technical POC information Describe the anticipated operational use of the system Include relationship/relevance to Current/Future Force systems and/or requirements Please provide summary information for your system/activity in this format

List specific resources your organization will supply and resources requested from PD C4ISR & Network Modernization, including: Resources Required Participant Provides or Coordinates with External Sources Requested From PD C4ISR & Net Mod Equipment – Vehicles, radios, systems Note: PD C4ISR & Net Mod has a limited number of vehicles of various configurations Participant organizations are expected to provide drivers Maintenance – Vehicular support Facilities – Workspace, storage, trailer or vehicle parking, etc. Soldiers Personnel – Engineering and/or logistical support Terrain & Airspace – Training areas / airspace required to execute activity Virtual – Models, Simulations, Virtual Environments, High Performance Computing (HPC) assets Network Connectivity – LAN/WAN, DREN, SATCOM, Internet, etc… Data Collection / Analysis Support Other Items