SG CUB Tentative Timeline

Slides:



Advertisements
Similar presentations
[ Interim Meetings 2006] Date: Authors: July 2005
Advertisements

March 2013 Opening Report Date: Authors: March 2013
LB73 Noise and Location Categories
Call for Contribution to IG CUB
Call for Contribution to SG CUB
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TV White Space Coexistence Plan
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
November 2013 Opening Report
Decision Topology Definitions
March Opening Report Date: Authors: March 2010
TGu-changes-from-d0-02-to-d0-03
Contribution on Location Privacy
January Opening Report
IEEE P Project Status Date: Authors: July 2013
Decision on SG Formation
November Opening Report
TVWS Coexistence Study Group Extension Request
July Opening Report Date: Authors: July 2009
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
July 2015 SG CUB Opening Report
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
Decision on SG Formation
September Opening Report
LB73 Noise and Location Categories
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
Addressing White Spaces Across all of IEEE 802
IEEE P PAR Extension Request
TGy draft 2.0 with changebars from draft 1.0
January 2015 SG CUB Closing Report
TGv Redline D0.10 Insert and Deletion
November 2014 IG CUB Opening Report
January Opening Report
March 2015 SG CUB Opening Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
[ Policies and Procedure Summary]
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
September 2012 Opening Report
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
Motion for Study Group on TV White Space Coexistence
July 2015 SG CUB Opening Report
July 2015 SG CUB Closing Report
TGu-changes-from-d0-03-to-d0-04
July 2014 Opening Report Date: Authors: July 2014
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November 2014 Opening Report
July 2013 Opening Report Date: Authors: July 2013
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

SG CUB Tentative Timeline January 2015 SG CUB Tentative Timeline Date: 2015-01-14 Authors: Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.19. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <shellhammer@ieee.org> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.19 TAG. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Hyunduk Kang, ETRI Steve Shellhammer, Qualcomm

Tentative Timeline January 2015 Interim March 2015 Plenary Contributions on study items March 2015 Plenary Draft of PAR and CSD (Title, Scope, and Purpose) May 2015 Interim PAR and CSD submission to WG June 2015 PAR and CSD submission to EC (30 Days before July meeting) July 2015 Plenary PAR and CSD review by other WGs Hyunduk Kang, ETRI