COACT ODOT Update September 13, 2018.

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Louisiana Safe Routes To School Program
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall Presented ‘gaps’ and possible project solutions to WHCA in.
Florida Department of Transportation, November 2009
Slide 1. Slide 2 Introduction How did you get to school as a child?
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Phase 2: 30% Design Plans September 4 th, 2012.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Rockridge BART Safe Routes to Transit Project Community Meeting Wednesday, September 30, 2015 Rockridge Library.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Belmont Pavement Reconstruction Project October 15, 2014.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Complete Streets Training Module 4b – Designing for All Users.
Improvements to Stockton Street
Urban Street Design Standards Overview of Project and Details
Nixon Road Corridor Study: Findings & Options
Town Center Streetscape Project
Complete Streets Award Program
Project Management Team Meeting #3
Interdisciplinary teams Existing or new roadway
District 3 Complete Streets Projects
Stanford Avenue/El Camino Real Intersection Improvements Project
Pilot Project Evaluation
Nolanville Main Street Sidewalk & Bicycle Connectivity
Draft Transportation Element September 6, 2017
Ad Hoc Advisory Group presentation, August 3, 2016
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
NVTA Countywide Pedestrian Plan of July 2016
Meeting of the Hillsborough MPO Board December 5, 2017
Transportation Alternatives (TA) Set-aside
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Issaquah-Fall City Road
City of Wilmington Bike Plan Update
Design Criteria CTC 440.
Meadow Lake Boulevard Street Extension Project
MPO Board Presentation
Walker Street Reconstruction Project 25% Design Public Hearing
COACT ODOT Update May 9, 2019.
Alex Henry FDOT District Seven Safety Office
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
I Street Bridge Replacement Project
New Hanover Comprehensive Plan
Project Location: 35th Ave HSIP8
Presentation transcript:

COACT ODOT Update September 13, 2018

HB2017 Transparency, Accountability, & Performance Section 11 of House Bill 2017, Keep Oregon Moving -Summary Video -All Counties and Cities must report on pavement and bridge conditions -ODOT to Post Reports On-Line Timelines -September 2018: Local Jurisdictions receive Email Summaries -Fall 2018: ODOT will test on-line forms -November 2018: ODOT will present additional info at COACT -End of 2018: Local governments receive instructions and links to forms -Feb. 1, 2019: Reporting deadline for local governments -Project Complete except for minor corrective work

21-24 STIP SCOPING TIMEFRAMES July 18 – Feb. 19: Scoping March – June 19: Identify Leverage Opportunities July 19: Finalize 100% List for Draft STIP Feb 20: OTC Releases Drat STIP for Public Review June 20: OTC Approves STIP September 20: USDOT Approves STIP

STIP Development Process

STIP Development Categories (Primary) Earmarks HB2017 Projects Fix-It Pavement, Bridge, Seismic, Culverts, Operations Data Driven (Pavement/Bridge Conditions, etc.) All Roads Transportation Safety (ARTS) Application Based Process Local and State System Program Based on Crash Data and Cost/Benefit Ratio Safe Routes To School (SRTS) Numerous Criteria (Title I School, Benefits, etc.) Leverage Funding Determined by ODOT Region Manager with input from ACTS Enhance, Safety, Active Transportation Categories

2021-24 STIP Funding

2021-24 STIP Leverage Funding Eligible Activities for all Leverage Programs Add features to ODOT Fix-It projects on State System Add features to HB2017 Earmarked Projects if they add scope or enhancements. Add features to an ODOT Fix-It project through partnership with local jurisdictions to improve State System Ineligible Activities for all Leverage Programs No exchange of dollars between Leverage programs within a Region Cannot be used for stand-alone projects. Not for ADA curb ramp improvements triggered by fix-it project.

2021-24 STIP Leverage Funding Enhance Add enhance highway features to Fix-It Projects to increase efficiency, address bottlenecks. NOT for active transportation/public transportation features. Safety Improve the most important safety issues that are in the general area of a Fix-It Project Tier 1 – Infrastructure improvements that will reduce serious/fatal crashes (Intersection, Roadway Departure, Pedestrian and Bicycle Crashes) Tier 2 – Regional safety priority areas such as top 10% SPIS sites, region wide systemic safety features, or other document crash locations. Active Transportation Funds building,, repairing or replacing bikeways or walkways on the state highway system. Examples include: improving a crossing, installing safety equipment or features, making connections to public transportation, extending project boundaries to address a nearby biking or walking need.

COACT Letters of Support INFRA Grant ODOT will be applying for the Winter Call for the 2018/19 INFRA Grant Safe Routes To School Goal is to have a single letter supporting all COACT Projects (October 15th Deadline) Deschutes County ($100,000-500,000): The north side (C-Avenue frontage) of the Terrebonne Community School is the primary access for walking and bicycling students. C-Avenue (busy County Collector) does not have sidewalks or a safe crossing area for students. This project will install sidewalks on both sides of C-Avenue and will channelize pedestrians/students to a crosswalk at 7th Street to facilitate safe crossing of the busy collector roadway.   City of Redmond ($100,000-500,000): SW 15th Street is a minor collector that is adjacent to M.A. Lynch Elementary School and Obsidian Middle School, but it has no bike lanes or sidewalks. This project will include sidewalk construction along both sides of the street along with ramps at the corners.  Parking will be modified as necessary to accommodate bike lanes.  Enhanced crosswalks will be provided at key locations. Confederated Tribes of Warm Springs ($100,000-500,000): Problem: At present, the pedestrians and bicyclists that attempt to travel and access the Warm Springs K-8 Academy School from a south-to-north direction must traverse a steep, irregular gravel path. The proposed project is to install a connecting shared use path which shall be constructed as a hard surface like asphalt concrete or equivalent with proper slope for accessibility and be safer and increase mobility to all users per the acceptable pathway standards. City of La Pine ($100,000-500,000): Coach Road fronts La Pine Elementary & LPHS. Currently, there are no sidewalks on the east side of Coach. Additionally, there are no crosswalks across Coach to the schools when walking or biking from Huntington Road. The proposal is to upgrade Coach Road and 1st Street intersection crossings, install sidewalk and streetscape along east side of Coach, and install two new crossing locations to allow safe pedestrian and bike mobility from Huntington Road to the schools.

COACT Letters of Support (Continued….) Safe Routes To School City of Bend ($1,500,000-2,000,000): Current conditions include deteriorating, non-compliant curb tight, narrow, and missing sidewalk along a roadway that frequently experiences high speeds. Crosswalk yielding is poor, especially during winter and morning conditions when lighting is poor. The project is to construct buffered sidewalks along NE 12th St and Neff Rd to improve access to Juniper Elementary and Pilot Butte Middle Schools. Flashing beacons and illumination on Neff Rd and 8th St will improve yielding rates at key crossings.   City of Madras ($100,000-500,000): An insufficient and non-compliant sidewalk network in the City of Madras is a giant barrier for children of all ages to walk safely to school.  Especially when those routes are on high traffic volume streets in town. This project will replace a two-block section of sidewalk (B Street between 5th Street and 7th Street) that is non compliant and unsafe for children to use on one of our busiest streets in town.  It includes adding ADA ramps, new curbing and sidewalk, and drainage, and paving. City of Sisters ($500,000-1,000,000): On this school route many students cross the US 20 intersection as they walk or bike to school. It experiences high vehicle & truck traffic, high speeds, has wide pavement width, low yielding rates & incomplete pedestrian facilities. Construction of a mini-roundabout at US20 & Locust would be an implementable solution that would slow traffic on US 20, provide highly visible crosswalks, and increase yielding rates for students crossing US 20. Students would have a safe route to walk or bike.

QUESTIONS?