MWG Recommended Hydro Improvement March 14, 2017

Slides:



Advertisements
Similar presentations
1 Modeling Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting August 20, 2009 Tom Miller Pacific Gas & Electric Status and Outlook.
Advertisements

1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
SM SOUTHERN CALIFORNIA EDISON® Page 1 Discussion on CEC’s and SCE’s Forecast Differences Presentation at CEC Preliminary Demand Forecast Workshop July.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
HMTF Understanding PLF August 31, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
MWG Webinar January 25, 2016 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
Economic Planning Study Presentation Northwest Coal Retirement Reduction Study Results Kevin Harris February 3, 2015.
Technical Advisory Subcommittee Quarterly Meeting August 15-16, 2016
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Topics Corporate Overview – Transmission Expansion Planning - Members
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Northwest Fisheries Science Center Technical Management Team
Heat Rate Calc based on CEMS Data April 12, 2016
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
WECC 2026 Common Case Capacity Assessment with RECAP
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
GENESYS Redevelopment Strawman Proposal
Hydro Modeling Improvement for TAS Approval May 4, 2017
TEPPC Review Task Force Meeting February 4-5, 2016
MWG Recommended Hydro Improvement March 7, 2017
2018 VELCO IRP Forecast Preliminary results
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair
Keegan Moyer Interim Manager, Transmission Expansion Planning
Jamie Austin, PacifiCorp
MIT tour of the California ISO Control Center March 31, 2015
DS-PDWG Approval Items
Outline Modeling Issue 2017 Modeling Goals
Vetting the GENESYS Model
Mid-Continent Area Power Pool
Out of Region Market Assumptions
Resource Adequacy Demand Forecast Coincidence Adjustments
Jonathan young ColumbiaGrid
RE Grid Integration Study with India
MWG Recommended Hydro Improvement March 7, 2017
Hydro Modeling Improvement for TAS Approval May 4, 2017
GENESYS Current Functionality
Recommended Hydro Improvement April 11, 2017
Technical Committee Meeting January 27, 2012
Jamie Austin, PacifiCorp
Pacific Northwest Power System and Wind Power Development
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Capacity Analysis in the Sixth Plan
Study Results Drought Scenario Study
Technical Committee Meeting March 18, 2016
Tyler Butikofer Associate Engineer II
Steering Committee Webinar March 25, 2016
PDWG Validation of the 2028 ADS PCM V1.0
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

MWG Recommended Hydro Improvement March 14, 2017 Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair

Overview Correct HTC p Factor Complete modeling change for the Core Columbia River Propose Hydro dispatch option to be set to “Load – Solar –Wind” by region Wind Coefficient Factor: ? Solar Coefficient Factor: 100% Revise PLF for Load- Solar Review proposed plants to be converted from “Hourly” to “PLF” PS Changes: Castaic, Oroville, and Thermalito

Hydro Issues

HTC p Factor GridView support two methods for evaluating HTC: Rectangle and Triangle method Rectangle Method divides by 4 Triangle Method divides by 2 Issue: P factor in the 2026CC are divided by 4. This reduces the HTC dispatch range by 50% Correction: Mult all “p” factors by 2

Modeling Core Columbia River The Core Columbia River are the 11 projects between Grand Coulee and Bonneville and Lower Snake River 2024 data set assumed some of the projects used a fixed hourly shape Data provided to WECC assumed all projects using PLF with a couple of HTC Recommendation: Complete modeling change of Core Columbia and Lower Snake to PLF/HTC

Model Core Columbia by Plant I have a scenario that aggregates the Core Columbia river plus Lower Snake River units by plant This eliminates ~195 units from the dataset Recommendation: Apply aggregation scenario for Core Columbia and Lower Snake River to WECC dataset

FYI: Review Core Columbia River HTC has a tendency to create average daily generation profile skewed to the afternoon/evening peak This profile is outside of historic operation for 2011-14 I have received 2014 and 2015 hourly generation and will be review resent operation for skewed afternoon generation shift I will also be reviewing Hydro modeling of Core Columbia River with BPA New HTC modeling recommendation with be coming for Core Columbia and Lower Snake

Hydro Dispatch to Multi Regions Do not use multi regions assignment for NW Hydro Hydro dispatch to multi regions does not create a proxy load by summing the modeled percentage of each regions load Not knowing what the load the Hydro is being PLF with makes it difficult to calc the appropriate K Factor Until this method is adjusted use it at you on risk

Hydro Dispatch “Hydro Dispatch Option” for Proportional Load Following (PLF) needs to be re-set to “Region Load – Wind – Solar” If proper GridView version is available the percent of wind and solar can be set by region Recommendation: Use “Region Load – Wind –Solar” Region temporal setting to: Solar Coefficient Factor:= 1 (100%) Wind Coefficient Factor In the Northwest:=0 (0%) Outside the Northwest:= ? Revise PLF for Load - Solar

Hourly Shape Hydro Dispatch Many units in California are modeled with a hourly shape but the are capable of daily shaping Hydro generation daily Fixed hourly shapes use 2005 do not take into account Hydro dispatching against “Load – Solar” Converting these units to PLF would support the California afternoon ramp instead of contribute to the problem Example: WAPA’s Judge F Carr, Spring Creek, Folsom, Hetch Hetchy Project, DWR, ID,..

Example Hourly Shape Hydro Dispatch Currently these WAPA projects are on a fixed hourly shape: Judge F Carr, Spring Creek, & Folsom Changing to PLF shifts the summer mid-day peak to the evening Fixed hourly shape is based on 2005 Adjusted to 2009 monthly Hydro generation Resulting PLF Hydro generation May & Dec mid-day gen?

Benefit of PLF Dispatch Difference in PLF – Fixed Hourly generation Overall a mid-day is neutral or a drop on Hydro generation This mid-day drop shift generation to the evening peak Hydro dispatched to ● JF Carr: CAISO ● Spring Crk: CAISO ● Folsom: BANC The combination of low monthly generation with high K factor at JF Carr in both May and Dec resulting in surplus generation of 47% and 146% (HTC required to adhere to gen)

Consider Run-Off River (ROR) as PLF Many small Hydro projects are ROR No regulation exist therefore what ever flow in flows out Regulation exist but down stream requirement allow little flexibility in daily peak Recommendation: Consider modeling generation with a flat profile as PLF with K Factor set to zero or small value When changing water years only monthly generation needs updating

Hourly Shape Hydro Dispatch Recommendation: Converting select fixed hourly shape Hydro plants to PLF A list of current plants modeling and recommended changes will be provided The “Convert Fixed to PLF 2026CC1.7 v01.xlsx” shows units converted from fixed to PLF with annual average “K” value One week to for participants to review and make comments

Castaic PS Current PS efficiency 85%, 75% and 65% Notes from CEC the average operational PS efficiency is 70% Recommendation: Lowering PS efficiency to 71%, 66% and 61%

Is Oroville and Thermalito PS Currently some units at Oroville (Edward Hyatt) and Thermalito are PS capable and modeled as PS EIA-923 show no pumping load after 2007 Minor pumping in 2/2002 & 3/2007 Recommendation: Model as 100% Hydro plant, no PS

Summary of Recommendations Correct HTC coefficient by multiplying by 2 Complete modeling change of Core Columbia and Lower Snake to PLF/HTC Apply aggregation scenario for Core Columbia and Lower Snake River to WECC dataset New HTC modeling recommendation with be coming for Core Columbia and Lower Snake Recommendation: Use “Region Load – Wind –Solar” Recommend converting some fixed hourly shapes to PLF Change Castaic PS eff to: 71%, 66%, or 61% Convert Oroville and Thermalito PS to Hydro PLF

Other Hydro Suggestion?