Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.

Slides:



Advertisements
Similar presentations
FEA Reference Guide See additional material herehere.
Advertisements

Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
ISE 311 Sheet Metal Forming Lab Cup Drawing in conjunction with Section 20.3 in the text book “Fundamentals of Modern Manufacturing” Third Edition Mikell.
Acoustic Emission Test Platform Customers: Exxon Mobil Department of Energy Team: Dan Edwards Terry Lott John Ludes Joseph Oagaro Consultant: Philip James.
ME 450 Group Adrian Conrad Chris Cook Thomas Hylton Nathan Wagers High Pressure Water Fixture Conceptual Design Analysis December 10, 2007.
CTC / MTC 222 Strength of Materials Chapter 1 Basic Concepts.
Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
Team Flying Sheep Engineering Analysis Mark Berkobin John Nevin John Nott Christian Yaeger Michelle Rivero.
Introduction – Concept of Stress
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015Thursday, June 18, 2015 Team #27 EA-6B Flaperon Actuator Team Members: Eric Sullivan.
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Team K-TRON Team Members: Ryan Vroom Geoff Cunningham Trevor McClenathan Brendan Tighe.
Chapter 6 Fatigue Failure Theories
Introduction – Concept of Stress
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Suitability of a structure or machine may depend on the deformations in the structure as well as the stresses induced under loading. Statics analyses.
Team Wrecked Week 9 Deliverables: Engineering Analysis.
T.M.F.T: Thermal Mechanical Fatigue Testing
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
MECHANICS OF MATERIALS Third Edition Ferdinand P. Beer E. Russell Johnston, Jr. John T. DeWolf Lecture Notes: S.A.A.Oloomi CHAPTER © 2006 Islamic Azad.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
T HE CRUSHED E XPERIMENT By: Carlos Sanabria Justin Roose Phillip Munday.
Overview of Mechanical Engineering for Non-MEs Part 2: Mechanics of Materials 6 Introduction – Concept of Stress.
CTC / MTC 222 Strength of Materials Chapter 1 Basic Concepts.
The City College of New York Department of Mechanical Engineering Assembly and Analysis of Collectors Edition Chevy Impala Group Members: Dave Maharaj.
Cooling Pipes: Force Analysis Thermal forces Disc deflections Manufacturing tolerance forces Glue joint analysis Friction forces.
Unit 91 Week 7 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt October 1, 2008 Final Presentation.
Innovative Rocking Chair Design with Electro-Magnetically Induced Rocking Motion Jorge Alvarado-Colón Yocli Comas-Torres Andrés Cruz-Vélez Tamarys Heredia-Arroyo.
Vehicle Automatic Seating System Computer Aided Design Fall 2004 Marian Rodríguez Rebeca RiveraCésar Morales University of Puerto Rico Mayaguez Campus.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Customer Needs Increase Productivity Safety of Machine Minimize Physical Exertion Reduce Downtime Complete through cut of straws on first actuation with.
FEM Analysis of the Stage3 Support Frame H.M. Fan March 14, 2007.
15. Open Die Forging Processes Assoc.Prof.Dr. Ahmet Zafer Şenalp Mechanical Engineering Department.
ME 635 Modeling and Simulation Modeling and Simulation of Speed Reducer assembly - Hirak Patel.
1 - An AISI 1020 cold- rolled steel tube has an OD of 3.0 inch. The internal pressure in the tube is 6,840 psi. Determine the thickness of the tube using.
Chapter 1 Introduction Concept of Stress. Road Map: Statics  Mechanics of Materials  Elasticity  Plasticity Fracture Mechanics Fatigue Creep Mechanics.
A.V.C COLLEGE OF ENGINEERING MANNAMPANDAL DEPARTMENT OF MECHANICAL ENGINEERING 14 th Batch.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Bicycle Wrench Analysis
This material is based upon work supported by the National Science Foundation under Award No. BES Any opinions, findings, and conclusions or recommendations.
TS Cool Down Studies TSu Unit Coils (24-25) N. Dhanaraj and E. Voirin Tuesday, 10 March 2015 Reference: Docdb No:
P11008 ArcWorks Straw Cutting Device May 13, 2011 Ian Balbresky-ME/Pneumatics Lead Tyler Banta-ME/Design Lead Matthew Estock-ISE/Project Manager Mark Vaughn-ME/Fabrication.
Lagouge TARTIBU KWANDA Mechanical Engineering
DEPARTMENT OF MECHANICAL AND MANUFACTURING ENGINEERING
End of Line “Pass Through” Conveyor
Sheet Metal Forming Lab Cup Drawing in conjunction with “Fundamentals of Modern Manufacturing” Third Edition Mikell P. Groover.
Introduction – Concept of Stress
Concept of Stress.
Concept Level Project Plan P08008 – ArcWorks Process Improvement
DEPARTMENT OF MECHANICAL AND MANUFACTURING ENGINEERING
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
ArcWorks Process Improvement P08008
Chapter 1 Introduction  Concept of Stress.
Cymbal Stand Surface Mount Hinge Light Rail Structure Bracket
1.6 Allowable Stress Allowable Load < Failure Load
Equilibrate System upgrade
P07521 BRDF Imaging Platform
Structure I Course Code: ARCH 208 Dr. Aeid A. Abdulrazeg
Structure I Course Code: ARCH 208 Dr. Aeid A. Abdulrazeg.
Welding Jig Redesign CATIA Project
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
ArcWorks Process Improvement P08008
SENIOR DESIGN PROJECT P08455
Concept of Stress.
Bicycle Wrench Analysis
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

Senior Design I – Project Review P07008 – ArcWorks Wash Bottle Assembly Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng. Stephen Bennice Mechanical Eng. Gabriela Jaramillo Mechanical Eng. Eric Van Hemel Mechanical Eng. Robert Veiders Mechanical Eng. Eng.Faculty Guides: Dr. DeBartolo Dr. Marshall

Project Objective’s Design automated process incorporating all three bottle sizes Reduce human contact with bottle during assembly process Minimize rejected assemblies Apply lean concepts to wash bottle production line

Key Customer Needs Can accommodate different size bottles Should be able to produce large quantities of assemblies Should require minimal force to complete assembly Should create good assemblies The unit should not create additional disabilities for the operators

Key Engineering Metrics Demonstrate that 6 cases of different size bottles can be assembled with average cycle time not exceeding 10 seconds No intervention between the operator and the machine while actual assembly Demonstrate the force required to complete assembly is less than the minimal force required to complete assembly manually for a bottle Produce good assemblies Demonstrate assembly of spout to bottle for at least 2 cases per size

Figure 1b: Figure 1a: Shows the basic components needed for assembly Shows a complete assembly

Figure 2b: Figure 2a: Figure 2c: First step in the assembly process; Spout is inserted into tool Figure 2a: T-shaped tool used to complete assembly Figure 2c: Operator completing assembly by applying force to bottle

Proposed Design

ANSYS Analysis

Finding Maximum Force that can be applied to bottle Same boundary conditions as for Proposed Assembly Method Taking Yield Tensile strength for LDPE as 1120 psi Maximum force found is 175 lb.

Background for Main Block FEA Given a Cylinder constant K = 0. 9 Given a constant air line pressure P = 70 psi Total force applied to latch = K * P = 63 lb Force is applied to latch at 45° angle Assumed force is distributed throughout the latch and then transmitted to main block Latch Main Block

Material Properties Used Aluminum 6061-T6 E= 10 000 ksi V= 0.33 Sy = 40 ksi Su = 45 ksi Max Von Mises stress = 490.622 psi

Boundary Conditions for Worst Case (Line pressure of 90 psi) Surface are of latch in Y = 6 in Pressure = F/A = sin 45 * 90 / 6 = 10.61 Surface are of latch in X = 0.5 in Pressure = F/A = cos 45 * 90 / 0.5 = 127.28 Zero displacement in y Distributed Pressure simulating force of 90 lb transmitted by latch Y Zero displacement in x and z X

Max Deflection (Line pressure of 90 psi)

Von Mises Stress Factor of Safety = Sy/ Max V.M. = 40 000 psi / 986 psi = 40.57

Old Boundary for Worst Case (Line pressure of 90lb) Surface are of latch in Y = 6 in Pressure = F/A = sin 45 * 90 / 6 = 10.61 Surface are of latch in X = 0.5 in Pressure = F/A = cos 45 * 90 / 0.5 = 127.28 Distributed Pressure simulating force of 90 lb transmitted by latch Fixed Support

Total Deformation

Von Mises Stress Factor of Safety = Sy/ Max V.M. = 40 000 psi / 700 psi = 57.14

Two blocks attached by bolts Comparison Table Two blocks attached by bolts One Main Block Factor of Safety 40.57 57.14 Total Displacement 0.000983 in 0.000845 in

Dimensions Used for Bracket

Boundary Conditions Material = AISI 1016 E= 29700 ksi Sy=50.8 ksi Su= 60.9 ksi P=F/A=90/.63 = 142.86 psi Y Z X To simulate 1/8 Screws Zero displacement Y Zero displacement in X and Z

Max Deflection

Max Deformation in Y

Max Von Mises Factor of Safety = Sy / Max V.M = 50800 / 3821 = 12.95

Pneumatic Diagram

Bill of Materials

Manufacturing Plan

Test Plan 1 week (5 days), 18 hours per day (broken into shifts) Goal: 54,000 cycles with no failures 2 cases per size for a total of 6 cases with zero defects and scratches across all bottles Test that all 6 cases are completed with an average cycle time of 10 seconds or less per bottle Test 10 consecutive emergency stop conditions Complete disassembly and reassembly in 2 hours or less Change between bottle sizes in under 10 minutes with ideal time of 5 minutes

Process Flow

Current Layout

Future Layout

Proposed Layout