By Muhammad Shahid Iqbal

Slides:



Advertisements
Similar presentations
Engineering Economy Practice Problems
Advertisements

Evaluating Business and Engineering Assets Payback Period.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Lecture 5 Engineering Economics ENGR 3300 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus Dr. Omar E. Meza.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Flash back before we compare mutually exclusive alternatives.
Contemporry Engineering Economics, 4 th edition, © 2007 Equivalence Calculations with Continuous Payments Lecture No.12 Chapter 4 Contemporary Engineering.
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Economic Equivalence Lecture No.3 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition © 2007 Economic Equivalence Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2006.
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Summer Time Value of Money Session 2 07/02/2015.
Economic Decision Making Practical Examples. Interest Number of periods Payments Made Each Period Future Value Using Excel for Year 3: Present Value of.
Comparing Projects Using Time Value of Money
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
L3: Economic Equivalence ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 6-1 Developed.
ENGINEERING ECONOMICS ISE460 SESSION 13 Annual Equivalent, June 17, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Annual Equivalent Examples.
Evaluating a Single Project
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Engineering Orientation
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Exam 3 Practice Problems For Engineering Economy By Douglas Rittmann.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
ISU CCEE CE 203 EEA Chap 3 Interest and Equivalence.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
By Muhammad Shahid Iqbal Module No. 08 Present Worth Method of Comparison Engineering Economics.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Project cash flow n A B Example 1: Consider the following two mutually exclusive investment projects. Assume.
Engineering Your Future Engineering Economics Economics Value and Interest The value of a dollar given to you today is of greater value than that.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
By Muhammad Shahid Iqbal Module No. 09 Future Worth Method Engineering Economics.
1 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Annual Worth Analysis Course Outline 5.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Accounting Rate of Return mefielding.com1. Definition  Accounting rate of return (also known as simple rate of return) is the ratio of estimated accounting.
Variations in Present Worth Analysis
Applying Annual Worth Analysis
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Interest Formulas – Equal Payment Series
Annual Equivalent Worth Criterion
Chapter 6: Comparison and Selection Among Alternatives
Economic Equivalence Lecture No.5 Chapter 3
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Chapter 7 Present Worth Analysis
By Muhammad Shahid Iqbal
Example Exercise 2 Cash Payback Method Cash Payback Method
By Muhammad Shahid Iqbal
By Muhammad Shahid Iqbal
Chapter 6: Comparison and Selection Among Alternatives
Steps of the Incr. Analysis Process
Annual Worth Analysis An alternative to Present Worth (PW) and Future Worth (FW) analysis is Annual Worth (AW) analysis. Annual worth analysis will select.
Applying Annual Worth Analysis
Presentation transcript:

By Muhammad Shahid Iqbal Engineering Economics Module No. 11 Annual Equivalent Method By Muhammad Shahid Iqbal

Introduction In annual equivalent method of comparison, Calculate Annual equivalent revenue of each alternative Calculate Annual equivalent cost of each alternative Decision criteria: The alternative with the maximum annual equivalent revenue in the case of revenue based comparison will be selected as best alternative. The alternative with the minimum annual equivalent cost in the case of cost based comparison will be selected as best alternative.

Revenue-Dominated cash flow analysis In the first step, find Present worth of Revenue-dominated cash flow diagram using the following expression: PW = - P + R1[1/(1 +i)1] + R2[1/(1 +i)2] + …………………+ Rn[1/(1 +i)n] + S [1/(1 +i)n] P = Initial investment Rn = Net revenue at the end of nth year. S = Salvage value at the end of nth year. S R1 R2 …………… RJ Rn 0 1 …… ……………………. j n P

Annual Equivalent Revenue In the second step, the annual equivalent revenue is computed using the following formula: i(1 + i)n A = PW (i) (1 + i) n – 1 If there are more alternatives which are to be compared with this alternative, then the corresponding annual equivalent revenues are computed and compared. The alternative with the maximum annual revenue should be selected as the best alternative

Cost-Dominated cash flow analysis In the first step, find Present worth of cost-dominated cash flow diagram using the following expression: PW (i) = P + C1 / (1 +i)1 + C2 / (1 +i)2 + …….…+ Cj / (1 +i)j +……….+ Cn / (1 +i)n - S / (1 +i)n P = Initial investment Cj = cost of operation &maintenance at the end of jth year. S = Salvage value at the end of nth year. S 0 1 2 . J n C1 C2 . CJ Cn P

Annual Equivalent Revenue In second step, the annual equivalent cost is computed using the following formula: i(1 + i)n A = PW (i) (1 + i) n – 1 If there are more alternatives which are to be compared with this alternative, then the corresponding annual equivalent costs are computed and compared. The alternative with the minimum annual cost should be selected as the best alternative

Annual Equivalent Revenue Alternatively annual equivalent amount can be calculated by using FW