Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wednesday September 14th
Luminosity lifetime – fill 2932
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Summary of Week 16 G. Arduini, J. Wenninger
Bernhard Holzer, Joerg Wenninger
Friday 31st August & night
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday Morning – recovery from cryo.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Yesterday’s morning’s controls issues
Finally.... We had to wait a long time.... We had many problems....
Sunday
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Sat morning Until 12:40: Loss maps at injection
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Tuesday 20 September 2011.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Presentation transcript:

Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by interlock on BPMS, loosing intensity on some bunches 06:48 Fill #2635 Stable beams, initial lumi 5.5e33 cm-2s-1 11:57 Dumped by interlock on BPMS, again one bunch b2 going unstable. 12:34 Error on the module H2B2 of the ADT. 14:15 Injecting beam for test ramp to find LHCb head on collisions 15:13 Injector chain down: POPS in PS 17:47 POPS back 18:30 Start ramp with 24 bunches per beam 18:38 Dump in ramp at 2.5 TeV due to SIS interlock. Not clear why. RING_B2_PERMIT to false for a couple of seconds, without latching it. 19:32 Injecting probe 19:35 Collimator - BIS interlock in TI2, same as last days. Try to unblock. 22:09 Start access in TI2 to fix collimator - BIS problem. loose connector on collimator crate side 22:56 Cycling the machine 18/05/2012 LHC 8:30 meeting

Thursday to Friday night 00:40 On ramp RF Module M1B2: crowbar fired 01:53 Inject 02:38 Adjust beam process to optimise collision point in LHCb 03:09 Dump by operator 04:54 Optimise collision with 2 x 84 bunches 05:18 Dump by operator 06:29 Again RF the module M1B2: crowbar fired. Preparing access 18/05/2012 LHC 8:30 meeting

Fill #2635 1.4e11 per bunch Peak Lumi (Hz/ub): Delivered Lumi ATLAS: 5564, CMS: 5627, LHCb: 412 Delivered Lumi ATLAS: 78 pb^-1, CMS: 79.6 pb^-1, LHCb: 7.2 pb^-1 Lost because one bunch B2 going unstable, not following any action B2 bunch 2091 suddenly being lost. This bunch is colliding in IP1, 5 and 8. 18/05/2012 LHC 8:30 meeting

Problem since swapping LHCb polarity Beam 1: losses of some bunches when bringing beam into collision The bunch numbers are 2075,2077,2079, which are bunches with head-on collisions only in IP8 Beam 2: sudden loss of 1 or 2 bunches during the fill (see prev. Slide) Adjust: blow-up and losses when beam going into collision B1: 50 % B2: 4 % 18/05/2012 LHC 8:30 meeting

B1, Fill #2635 Bunch sitting at 6e10 BPMS IP6 will have bad readings below 4e10, so still ok for a while if following normal beam lifetime If the single bunch B2 would not have gone unstable 18/05/2012 LHC 8:30 meeting

Fill 2635 going unstable BBQ signal: B2 H was unstable and produced likely the loss Similar instability seen for other fills lost on B2 BPMS Fill 2632 B1 H going unstable Fill 2634 B2 H 18/05/2012 LHC 8:30 meeting

Understanding and Plan LHCb set-up with negative polarity 2 weeks ago, right after the TS Since then orbit trims – had to find the correct head-on collision in ATLAS and CMS We have lost the correct head-on collision in LHCb leading to strong parasitic beam-beam effects as separation between the two beams might be too small when going into collision Plan is to perform test ramp with 2 x 48 bunches with collisions in IP1, 5 and 8 and find back the head on collisions with negative LHCb polarity 18/05/2012 LHC 8:30 meeting

LHCb collision point Fill with 2 x 24 bunches It seems we go through collision during the collision BP in IP8. To find the lumi in IP8, we moved in the crossing plane by +100 um and in the separation by +200um. Beams were separated more than expected. Lumi scan +29 um in crossing, +74um in separation. Added fill with 84 bunches mainly colliding in IP8 To be sure that changes are not affecting orbit near TCT collimators To be sure one ends up with about lumi of 50 at end of the collision process All looks fine, so far… 18/05/2012 LHC 8:30 meeting

RF (Philippe & Co.) 13:56 RF coupler control fixed. Most likely explained the abort population during the previous fill. Bunch-Length-Mean growth rate at injection B1. It is (likely) related to the energy (frequency) match at injection, Should not be harmful During night: crowbar problem B2 back 18/05/2012 LHC 8:30 meeting

Plan Fix RF crowbar problem Fill with 2 x 1380 bunches Previously attributed to HV cable between power supply and klystron Fill with 2 x 1380 bunches 18/05/2012 LHC 8:30 meeting