Project planning and status (February 2018)

Slides:



Advertisements
Similar presentations
Laser Speckle Extensometer ME 53
Advertisements

Lecture 11. Microscopy. Optical or light microscopy involves passing visible light transmitted through or reflected from the sample through a single or.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
9/17/2015 GEM Lecture 20 Content Flight preparation –Equipment –Weather conditions –Flying height –Coverage.
Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Recent development of the Supersonic Gas-Jet Beam profile monitor
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT RECENT ALIGNMENT EFFORTS ALIGNMENT EFFORTS AT THE HEAVY ION ACCELERATOR FACILITY ACCELERATOR.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
(24) PANDA Target TDR Review, June 2013 Hans Calén PANDA Target TDR review: Pellet Tracking System 1 Main requirements, concerns and challenges: - High.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Development of a pellet tracking system for PANDA and WASA Goal:  know interaction point with a few 100  m accuracy in 3d(xyz). Method: Track pellets.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
(22) Pellet tracking Panda CM GSI Status of pellet tracking 1 - Multi-camera system developments. Readout electronics…. Mechanics (at UPTS)
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
BM&N STS ladders assembly in VLHEP
DT-LHCb coordination meeting 18 April 2016
Jim Fast Pacific Northwest National Laboratory
Update on PANDA solenoid design
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
The TV Beam Observation system - BTV
Jaak Lippmaa HIP, Helsinki University
Antiproton-proton elastic scattering as a day-1 experiment at HESR
Integration of the e+ elements
Project supported by JCHP-FFE, EC FP7 and Swedish Research Council
Stadia Reduction.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Options and Recommendations for TL and Dumps
MICE Operations Scenario Run 1
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
IHEP group Shashlyk activity towards TDR
IFR detector mechanics
RADAR -Range and Bearing Discrimination and Accuracy.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
ID1050– Quantitative & Qualitative Reasoning
Status of the PANDA Cluster-Jet Target Quarter 1/2018
On the accuracy of port assembly at Wendelstein 7-X
KICKER STATUS G-2 meeting March 5, 2014
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
Cryomodule Assembly Plan
Pellet Target developments
Project planning and status (May 2018)
Pellet Target developments
BGC Collaboration Meeting –
Presentation transcript:

Project planning and status (February 2018) PANDA pellet tracking Project planning and status (February 2018) Ongoing: Multi-camera r/o and control. Monitoring and analysis s-w is being developed. Preparation of a “generator” tracking chamber that can house four measurement levels. All hardware details for the chamber are ready. Time line: Tests of a measurement level module (DM) prototype were done 2016. Tests of the “generator” tracking section start during 2018 - ... Design of the “dump” tracking section. It depends on mechanical design of the target dump area and on experience from cluster-jet tests at COSY. To be able to prepare the complete system with two tracking sections, additional funding is needed. From then it will take ≈ two years for completion, provided that some of our expert personnel (and infrastructure) is still available. Risks: Evaluation done (Autumn 2013 (TDR), Feb 2015 (SG) ). Funding: Consumables and running: Almost zero HPH2020 application to be submitted 2018 Equipment: CTS grant (20k€) 2017-18. New application for 2019? Multi-cam s-w slow in progress due to lack of manpower. SG 2015 comment still valid: “Funding remains an open problem”. The pellet tracking project is not in the PANDA cost book and it is not a Swedish FAIR in-kind contribution. It can therefore not get part of the dedicated SRC support for PANDA. We see therefore no possibility for substantial financing at present. The special problem with funding should be well known since many years by the PANDA management. CTS = Carl Tryggers Stiftelse (a private foundation), SRC = Swedish Research Council, HPH = Hadron Physics Horizon, DM = Detection Module

Test of “Pellet Tracking” with PANDA Cluster-jet at COSY The PTR system will provide jet (x,y) position, shape and detailed variations on different time scales, possibly down to 20 microsec. Some differences between cluster-jet and pellet-stream that the system has been adapted for: 1) size at accelerator pipe about 13 mm compared to 3 mm 2) time structure continuous on the scale of microseconds 3) optical properties i.e. light reflection and transmission Also to some extent how to treat the camera image information. The present UPTS tracking chamber with two measurement levels will be used together with .... ... two DMs each equipped with one LS-camera and one STR-laser at 90 degrees, both with modified optics to cover the jet completely. Compared to a monitoring system based on a standard laser and CCD camera, the PTR system provides possibility to record data at higher rate and the intense illumination gives possibility to use shorter exposure times. This in turn allows studies of time structures and time correlations on a shorter time scale. Time variations down to a few ten microseconds time scale could be studied. If 10 microsec cycles can be used, the jet speed might be measured with some per cents accuracy (for v=200m/s and dt=10 microsec), by studying suitable disturbances. ”If”, refers mainly to light yield and data-taking/handling capacity. The laser beam must be orthogonal to the camera line of sight (for technical reasons), since a wide laser beam that covers the whole jet, requires the big windows. DM = Detection Module. Integrated module with cameras and lasers fixed on a common plate, i.e. not individually as in this photo. Time plan: Spring 2018 – assemble and prepare the setup in Uppsala. All h-w details are ready. Summer service period – install the PTR chamber at COSY. August 2018 ... – install the DMs and carry out the run.

Installation of the Pellet tracking system at the COSY beam region, in steps: PTR chamber and cabling together with installation of the cluster dump. Two DMs with cameras and lasers just before running of the cluster-jet. The cluster-jet test setup at COSY. The photos show the installed scattering chamber (April 2017). The PTR chamber could sit just below the COSY beam and be attached (via an adapter flange) to the DN200CF flange seen in the middle of the photos. Cabling*: CamLink cables 10 meter long between camera and W7 PC with frame grabber (FG) cards. 2) Power distribution box(es). At least one which is possible to switch on/off from Cosy eye. 3) Laser control USB cable 10 meter long between laser intensity control box (Moxa) and W7 PC. DM = Detection Module. Integrated module with cameras and lasers fixed on a common plate (next slide). Some measurements: + height of COSY beam over floor 1800 mm. + height of the DN200CF flange over floor 1610 mm (left photo). + free distance from the cluster-jet to the valve and vertical pipe (seen in photos) is 360 mm. The PTR DM plate sticks out 310-340 mm in different directions. .From “Test of the Pellet TRacking (PTR) system in a Cluster-jet setup” (hc170428).

For the cluster-jet setup, 1 camera and 1-2 lasers will be used. Installation of the Pellet tracking system at the COSY beam region. The DMs should be pre-aligned in a desktop setup and installed just before the run. Its alignment should then be checked and finetuned with the cluster-jet after the installation. The photo shows a DM with two cameras and three lasers in a desktop setup for alignment of the cameras and lasers. From left to right camera A, lasers B, C, A and camera B. The alignment target is normally placed at the cross in the center. For the cluster-jet setup, 1 camera and 1-2 lasers will be used. DM = Detection Module. Integrated module with cameras and lasers fixed on a common plate. .From “Test of the Pellet TRacking (PTR) system in a Cluster-jet setup” (hc170428).

Installation of the Pellet tracking system at the COSY beam region. The PTR chamber could sit just below the COSY beam and be attached (via an adapter flange) to the DN200CF flange at the bottom of the scattering chamber. Reduction flange DN 200/160 CF-F. Its thickness is 25 mm. Drawing of the PTR chamber. Additional considerations: - It may be needed some radiation shielding of the cameras. One should prepare for this (just in case ...). - One might put a short vacuum section between the scattering chamber and the PTR chamber e.g. for placing vacuum gauges. - Some std CCD cameras might be included in the system. We have no experience of running the LS-cameras in a radiation environment.