To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.

Slides:



Advertisements
Similar presentations
Zebra® 105SL™ * Removing and Installing Printhead
Advertisements

DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
Helmet Light User Instructions Rotate Tail cap counter clock wise to open battery compartment IR / IFF lever (only functional light In this mode) Two functional.
How to Make A Telegraph Exploring the Magic of Electricity.
Setting Up a Tripod. Unscrew the center knob at the collapsed tripod base to loosen, and then re-tighten it once all the legs are fully extended.
Electricity Lesson II Electrical Symbols EE.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Build the Tumbler.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Click on this image to open the full PDF document.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
EMerge Browser Managed Security Platform Module 2 Hardware install.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Memory Craft Feed Dog Drop Step Motor Adjustments.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
1 Light 1 C 70” Project Layout AFF. AFF is the abbreviation for 2 1.After first fire 2.Above finished floor 3.Above flat floor 4.At first floor 5.Average.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
5/13/ Assembling and Testing Your Robot. 5/13/2015 Mounting the Topside Hardware  Parts Boe-Bot Chassis (1) Standoffs (4) 1/4” 4-40 Screws (4)
Photos and Sensor Instructions
Clean Air Box Usage & Care CABs RAMs CO Monitors.
2008 Cadillac CTS With Original Antenna
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Making A Motor Exploring the Magic of Electricity.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
Wiring the Desklamp Basics of Wiring. Types of Wire For this project we will be using two types of wire: 3 wire and standard lamp wire. – 3 wire The wire.
Showing Demonstrations on the TV How to connect the camera to our TV set.
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
How to build it.. Using a D-cell battery, wrap the copper wire 7 times with 3 inches of loose wire at either end Wrap the end around the coil to tie off.
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
Wiring the Control Box Battery Conductor(s) Resistor.
How to get a chassis off your monitor without giving yourself a nasty boot! A very simple guide to discharge the monitor and remove the chassis so that.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Designing a Next-Generation Surgical Robot Activity.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Replacing the Main Monitor 1.Open Lower Main Door, and turn off machine power 2.Open the upper main door 3.Disconnect the video and power plugs from the.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
Electricity Symbols.
Installing Branch Circuits
D Sequencer – Insertable
Exploring the Magic of Electricity
Ignition Systems Overview
HVI HIPOT TEST SET Pft sERIES.
Exploring a musical keyboard
Natural Sciences and Technology Grade 6
Front panel wiring PICO 155
Lab Cleanup Practices Following Experiments
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
המחשב הנייד ערך והכין: אלי סומר.
Electrical Wiring Single Pole Switches.
Exploring the Magic of Electricity
Level 0.
Removes these two screws that attach the Controller to the Hopper Box.
Portable Fan.
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Reader Swap out Guide.
Presentation transcript:

To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each wire in center under each knob, off to the side will allow for a poor connection. Insert the two black wires under the top and bottom knobs, and the two red wires under the center knobs, either red can go under either knob and either black can go under either black knob . Finger tighten securely.

Note: move all MODE switches to the left except for 4 and 5 which are to the right!

Loosen 2nd and 3rd screws and insert “U” shaped connectors on small horseshoe wire, tighten the 2nd screw.

Insert green ground wire from rear of coil machine under 3rd screw over the small horseshoe wire and tighten.

Loosen 1st screw, insert red “L” shaped wire, and tighten screw.

Loosen 2nd screw enough to insert black “L” shaped wire over small horseshoe wire, and tighten screw.

Attach red alligator clip from the frequency generator to red “L” shaped wire under 1st screw with “+” sign. Important: Red must be attached to top screw. Attach black alligator clip from the frequency generator to the black “L” shaped wire under 2nd screw with the “-” sign. The opposite end of the black cord plugs into the frequency generator plug which says “Output 50 Ω”.

Congratulations, you are finished Congratulations, you are finished. This is what your wiring will look like upon completion.

The speaker wire from the coil plugs into the right side of the Doug coil machine.