Call from Mr. Madke / Mr. Kulkarni of Aurangabad service

Slides:



Advertisements
Similar presentations
GATHER THE FOLLOWING SUPPLIES:
Advertisements

MO-735 Overlock Dealer Training CLICK.
Canon 6000 series When taking cartridge out of the printer, make sure to seal the ink outlet with Scotch tape before refilling the ink. Step 1 Step 2 Make.
Access BDD Survey School
Year 8 Design Technology 2 Point Perspective. Introduction Two point perspective is a 3D drawing with a horizon and two vanishing points. By using your.
Module 4: Isometric Drawing
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Nursing Instructions for the Tru-Close® Thoracic Vent
OR-PR 156 Fabricate a Padded Full Calf Cuff. Fabricate a Padded Full Calf Cuff for an AFO  Cut a strip of leather 2 1/2” wide and the length of the largest.
Components Connection Jig Graph Paper (#4101) Mounting Blocks (#5902) Nails Tape Measure Pen Hammer Customer Coordinates.
ENGINEERING GRAPHICS 1E7
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
© T Madas. Mathematical and Technical Drawings Bottom Side (Left) Back Front Top Side (Right)
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
TP4-ENERSOL-TD/PV double function
Aberdeen Grammar School
Air Racer Design and Layout.
AR4702 (cover plate replacement) Remove existing cover plate by removing the 2 x screws fixed through the top of the plate into the chassis (Phillips screw.
How to make a simple tempeh incubator. For all information regarding, how to make tempeh or purchasing of materials for tempeh/tofu making please visit.
Please Pass the Bread.
Creating a 7-Circuit Right-Handed Cretan Labyrinth 11 Steps in Designing Your Own Labyrinth.
Greenfaulds High School Orthographic Views. Orthographic Projection Orthographic projection is the name given to the type of drawing where a 3D object.
MOUNTING PHOTOS FOR STATE FAIR
PROJECTIONS OF POINTS & LINES Part I
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
Properties of waves.
Insert date here Presentation to 4 th PANI 3 Management Committee PANI 3 Results – Ultrasonic Results.
1 2 Measurement of Volume Volume is the amount of space an object takes up.
1 Point Perspective Students will tape down a piece of paper and go through the steps As we go through the presentation.
Preparing Wet Mount Slides
Chapters 16-17, 34-36, and Midterm, Tuesday, June 28
Hexagonal Prisms Developments.  A development is a flat template of a 3D shape that when folded up in the correct way makes the actual shape of the 3D.
We do not have as much clearance as is shown here.
STEP 1: ASSEMBLE ANGLE PLATES
3-Dimensional Figures Surface Area.
Reading the Graduated Cylinder
Deans Community High School
CFSC Backdrop Assembly
Service channels between Tracker and PP1
Sea Level Rise Demonstration
Autocharging norm № i/o Name of gds Thickness (mm) Density of plate
TOWER 3 CONFIGURATION Configuration:
Floral Design The ‘L’ Line Arrangement
Floral Design The ‘L’ Line Arrangement
Internal Training Module
Mechanical analysis of Foam and plastic honeycomb panels
Development of Surfaces
Study of Chinese oil-less chamber
Nursing Instructions for the Tru-Close® Thoracic Vent
Orthographic Projection & Line Types
TOOL TAGGING GENERAL MOTORS.
LST Module Installation
FUEL DELIVERY SYSTEM Copyright © MILE 2011 MILE / XUV500 / IC / VER 01 / JUL 2011.
I C A L I C A L DFME follow-up issue. Page. OPEN POINTS
Fold green paper in half, by width, keeping crease at the top…
2.7 and 3.7 “I can use benchmark angles to estimate the measure of angles, and use a tool to measure and draw angles.” “I can understand that the measure.
Day 2 Law of cosines.
Measuring Instruction for Outdoor Bamboo or PVC Blinds
Draw the balance scales shown below on a blank page after Page 105.
Reading a Tape Measure.
1M1 (Leon) / 1M2 (Toledo) Water ingress through doors
Chapter 3 Orthographic projection.
Model Reversion : A Client : Slider qty : 1 Model : Latte 2nd
Unit 9. Day 17..
True Shapes.
After service guide for changing PCB
Adding angle dimensions to drawings
Chapter 3 Orthographic projection.
Page 70 Name ALL triangles that are congruent to TRIANGLE DJI.
Presentation transcript:

Call from Mr. Madke / Mr. Kulkarni of Aurangabad service About water sprinkling from front side in Glam 50 R tower cooler Complaint No. AUR2602160131 After that Mr. Bakshi visited at customer home on same day evening. Water sprinkling problem observed and assured customer to resolve problem. Next day morning discussed problem with Mr. Rajabhau & following action taken We have visited to BGAPL & tested 4-5 coolers for same problem but no any water sprinkling observed. Then we have taken action to resolve customer complaint & made one proto of back panel to hide gap between ice chamber top face & Honeycomb. Same day evening replace back panel with new back & problem resolved After study we have observed 5-6 mm Gap between top face of ice chamber and honeycomb pad. Due to this gap water is getting suck & fall on water pipe Water getting path thru pipe up to blower center. Blower sucking water & sprinkling from front side Study & Analyses

Following action taken after water sprinkling problem. STAGE 1 IMMIDIATE Honeycomb Length verified at factory & instructed for strictly follow length as per drawing. Water pipe route changed as below image in production BEFORE AFTER Further study is going on to take preventive action If same problem comes in field please change route of water pipe as suggested above STAGE 2 Double side foam self adhesive tape applied as shown in fig. in production Tape mfgr. Name: M/s. seal pack Tape length :- 250 mm, width : 23 mm, Thk. 2.0 mm

Following action taken & mold modification under process STAGE 3 Also please share field issues of this model to take corrective & preventive action. Green marked plastic angle to be welded At bottom face of ice tray in back panel To avoid water suction. NB:- Mold under modification & will be implement Accordingly in production.