PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Unit 8 Fastening Systems
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Manual Flo-tap Installation Instructions
FASTENERS Screws, Nails, Bolts…. SCREWS AND NAILS Must resist corrosion Rusting fasteners retain moisture Rot Bleed.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
KEY JOBS EXECUTED MACHINING. PA 21 Tubsheet machining Material :- Forge steel Weight:- 27MT, OD:- Ø5300 Operation:- Faces and Groove machining PA 21 Tubsheet.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
2- Crankshaft, Piston Pin, and Piston Rod Bushing.
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Cook Stove for Haiti Project Jordan Hunter Rob Reid Mike Lagos Brian Knight Stove Construction.
Connecting crank and pivot shaft assemblies. Press fits, or interference fits are sometimes used in manufacturing to reduce manufacturing costs or liabilities.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Repairing and Reconditioning Tools Tool Fitting. Objectives: 1)Identify and remove rust from tools in the lab with 100% accuracy 2)Demonstrate the application.
NOAA Humidifier – smaller (lower flow) version (yours will have larger tubing and fittings) Ribbon heater Thermal cutoff switch Swagelok reducing union,
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
“Building Quality to Customer Satisfaction!”. TOTAL QUALITY MACHINING, INC.
Perry Lapper Progress. Frame With Actuators Outside Frame.
1 ladder to sector out2 bond fixture HFT PIXEL 11/16/2008 ladder to out2 bond fixture.SLDASM.
Countersinking ,boring, counterboring,reaming,tapping
Notes on Converting 3 Rail Locomotives to 2 Rail Operation By Joe Foehrkolb Baldwin Forge & Machine Baldwin, Maryland.
2012 IDEA ASSEMBLY “HINT” PACK. ARM: draw in 2D Copy / paste this view into Inventor.
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
Helicoil installation on MB GPW L134 block. I had a miss, possible valve sticking, or worse, in my engine. The middle head bolt on the left hand side,
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
………..Continued - Parts of Radial Drilling Machine -Functions
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
Setting up correctly Different types and their use
Holes and Hole Notes Introduction to Engineering Design
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
Definitions and callouts
Cleaning Critical Orifice and Focusing Nozzle
Compression Is an adiabatic process. This means heat is derived from the process. As we squeeze the air fuel mixture it gets hot. Normal compression ratio.
Automated Machining Adv. MMP
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Rigaku Rotary Assembly Top View shows “Inlet” side. This couples with 4-ea ¾“ bolts to “Offset” flange. This flange has central hole 1” offset from center.
Machining Module 5: Lathe Setup and Operations. Parallel (Straight) Turnning Parallel turning is to move the cutting tool parallel to the longitudinal.
2D Drawing Representation
Hole Machining Operations
R. Kersevan, TE-VSC-VSM 30/06/2016
Alternate Views Introduction to Engineering Design
Holes and Hole Notes Introduction to Engineering Design
Assembly instructions for M-K all bolt together hoppercone kit.
The Leica Mount for a CP 4500 IMPORTANT NOTES
o-ring groove depth = 0.080” width = 0.145” clearance
Tube Heater, 3,000 Watt 240V Top + Back Front 1”Hole For Mixer Shaft
Welcome! Drafting 2323: Pipe Drafting
Gaskets and Packing An introduction to Gaskets Packing
Holes and Hole Notes.
The Leica Mount for a CP 4500 IMPORTANT NOTES
FASTENERS Screws, Nails, Bolts….
Holes and Hole Notes Introduction to Engineering Design
Holes and Hole Notes.
Holes and Hole Notes Introduction to Engineering Design
BGC Collaboration Meeting –
Presentation transcript:

PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM HR Coated Fiber Tip SMF PBGF Light PM Vacuum Collimating Lens

PBC Method Curved Mirror Dielectric Mirror Pump PM PBC HR Coated Fiber Tip SMF PBGF Light PM Vacuum

Chamber Assembly

Chamber Cross Section

Conflat flange for windows O-ring groove to be machined on opposite of knife edge Quantity: 4 O-ring : ID = 0.737” Thickness = 0.103” ¼” Deep Tapped hole for 4- 40 screw 2.75” Conflat flange with 0.505” Bore hole (already purchased this way) Enlarge bore hole to diameter = 0.637” (radius = 0.3185”) Groove width = 0.103”x30% = 0.1339” Groove depth should be 70% of 0.103” = .0721” Bottom of groove should be smooth for “O” ring vacuum seal Radius = 0.6125” Holes are 120° apart Lesker flange part #s: 0.505” Bore - F0275X050N Blank – F0275X000N 0.637” OD = ID + 2x(thickness + 30%) = 0.737” + 2x(0.103”+.0309”) = 1.0048” 0.737” 1.0048” Will have 1” wedge window to install with teflon holder so that when chamber is brought to atmosphere, window doesn’t fall off (next page) 2.75” Tapped holes are on both sides offset by 60 degrees to not interfere with each other. SIDE:

Teflon window holder Quantity: 4 Raw teflon tube Top OD=1.55” Side Should be large enough to fit 4-40 screw (#30 drill size = 0.1285” for free fit) Counter bore for screw head Raw teflon tube OD=1.55” ID=0.75” Top Side 0.6125” Holes are 120 deg apart Radius = 0.6125” 0.25” 1.05” 0.75” 1.05” Recess to “catch” window 0.05” bigger than window Depth of recess needs to be 0.050” 1.55”

Fiber holder Quantity: 4 Swagelok: SS-1-UT-A-4 (1/16” tubing hole) Ultra-Torr Vac fitting “adapter” Quantity: 4 Collar to attach to vacuum chamber (threads welded to flange): A&N corporation S-50-KM (0.515” ID, 5/8” tube OD) 1/16 ” tube hole 3/16 ” 1/4 ” ½” OD tubing Overall length needs to be ~6”, so ½” OD tubing should probably be about 5” Mike wasn’t sure what this piece was, though it is important for the interior to be conical so that the fiber will be guided through.

Conflat flange for fiber holder Quantity: 3 O-ring : ID = 0.737” Thickness = 0.103” 2.75” Conflat flange Bore hole to diameter = 0.620” (radius = 0.310”) Lesker flange part #s: 0.505” Bore – F0275X050N Blank – F0275X000N 0.620” 2.75” SIDE:

Chamber Layout C2H2 Buffer Gas

Chamber Layout (Cont.)

Modified Acetylene Delivery System

Shelves

Shelves (Cont.)