Plus Endcap Transfer Lines

Slides:



Advertisements
Similar presentations
Modeling of Data. Basic Bayes theorem Bayes theorem relates the conditional probabilities of two events A, and B: A might be a hypothesis and B might.
Advertisements

1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
March 6th, 2006CALICE meeting, UCL1 Position and angular resolution studies with ECAL TB prototype Introduction Linear fit method Results with 1, 2, 3,
1 James N. Bellinger University of Wisconsin-Madison CMS Week June 2010 Coordination: Things to do Coordination: James N. Bellinger CMS week 2010.
Muon alignment with Cosmics: Real and Monte Carlo data S.Vecchi, S.Pozzi INFN Ferrara 37th Software Week CERN June 2009.
SCT Endcap Module Initial Alignments Using Survey Data Paul S Miyagawa University of Manchester.
Regression Lines. Today’s Aim: To learn the method for calculating the most accurate Line of Best Fit for a set of data.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Automatic Joint Parameter Estimation from Magnetic Motion CaptureData James F.O”Brien Robert E. Bodenheimer Gabriel J Brostow Jessica K. Hodgins Presented.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
What is in my contribution area Nick Sinev, University of Oregon.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
Optics studies for the LHC beam in the TT2-TT10 line and effect of the QKE58 suppression E.Benedetto, A.Franchi Thanks: G.Arduini, D.Jacquet, O.Berrig,
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
1 MONALISA Compact Straightness Monitor Simulation and Calibration Week 7 Report By Patrick Gloster.
Global predictors of regression fidelity A single number to characterize the overall quality of the surrogate. Equivalence measures –Coefficient of multiple.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
Nov Visualization with 3D CG
Installation of the waveguides between MB T0#2 and DB T0#2
Memory Management Chapter 7.
M & M Statistics: A Chi Square Analysis
University of Wisconsin at Madison
Correlated Misalignments Studies for LCLS-II SC Linac
Relative alignment of LXE and DCH using AIF
University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Mathematica fits vs. Root
Alignment of the first two magnet system modules of Wendelstein 7-X
Status of Transfer Line Reconstruction University of Wisconsin-Madison
DCOPS Readout before and during MTCC
Line Fit with Errors in Y
University of Wisconsin at Madison
University of Wisconsin-Madison
Validating Transfer Line Fit University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Warm Up: Factor the following: x2 + 12x +20 6x2 – 7x + 18 x2 – 25.
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Current status Minjung Kim.
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
#21 Marginalize vs. Condition Uninteresting Fitted Parameters
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Chapter 10: Rotation The Rotational Variables
CMS Week Muon Alignment
Transfer Line Calculations
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Physics 1 – Aug 22, 2019 P3 Challenge – Do Now (on slips of paper)
Presentation transcript:

Plus Endcap Transfer Lines James N. Bellinger University of Wisconsin-Madison 11-Monday-2009 James N. Bellinger 11-May-2009

Available Data End to end data w/ both lasers Only for PT1 Plus Endcap with Plus lasers 0T 3.8T Minus Endcap with Minus lasers Model not complete so I didn’t check closely

Plus Endcap SDF Cocoa SDF for the entire Plus Endcap is ready Except for piston Z-sensors and inclinometers This work was done with a limited set of measurements: only transfer line data Complete set of measurements took 30 minutes to execute

Relative positions Without some absolute reference, the endcap could be on Mars, but we can still get relative displacements. We also have a handle on torsion of the endcap.

Testing the results Pre- and post-CRAFT survey measurements of YE disk x/y and z- rotations Hand calculation trying to fit 30 parameters Cocoa results

Photogrammetry YE+1 Pre YE+2 YE+3 Post X mm 1.46 0.17 1.55 0.58 -0.15 Reported error 0.3mm on position, 0.1mrad on angles YE+1 Pre YE+2 YE+3 Post X mm 1.46 0.17 1.55 0.58 -0.15 0.59 Y mm -0.32 0.78 0.56 -1.37 0.57 -0.04 Rz mrad -0.50 -0.40 0.20 -0.43 -0.46 0.18 From CMS-SG-UR-0124 Changed sign convention for Rz

Relative Photogrammetry Fix YE+3 at (0,0) with no rotation Assume entire shift happened at start of CRAFT, and use Post- CRAFT data YE+1- YE+3 YE+2- YE+3 dX mm -0.01 -0.74 dY mm -1.33 0.61 dRz mrad -0.61 -0.64

Hand calculation Minimize chi-squared of deviations of laser hit positions from data 30 parameters, PARI matrix code Needs tweaking Does not agree w/ photogrammetry YE+1- YE+3 YE+2- YE+3 dX mm -1.03 -1.08 dY mm 1.28 2.07 dRz mrad -0.98 -0.86

Cocoa on Plus Endcap Changed hierarchy to be disk-based Data from 0T Fixed YE+3 position, rotations X/Y do not agree with photogrammetry Rz are consistent with photogrammetry values, similar to hand calc. YE+1- YE+3 YE+2- YE+3 dX mm 0.97 0.59 dY mm -1.22 -1.51 dRz mrad -0.73 -0.76

Comparison Agreement is not very good Hand calc wrong sign? PG did not accurately estimate our known Z-sensor displacement PG Hand Cocoa

Transfer Plate Displacements At each transfer plate, compare shift between YE+3 and YE+2 positions Ignore Z, Rx, and Ry PG Hand Cocoa TP1 3.9 4.0 7.1 TP2 3.0 5.0 6.6 TP3 4.6 7.3 5.2 TP4 5.4 8.5 TP5 5.5 8.0 4.7 TP6 4.8 6.0 6.3

Transfer Plate Displacements At each transfer plate, compare shift between YE+2 and YE+1 positions Ignore Z, Rx, and Ry BUT! See next slide PG Hand Cocoa TP1 1.9 1.7 0.6 TP2 2.0 1.4 0.4 TP3 2.2 0.7 0.3 TP4 2.3 0.2 TP5 1.0 TP6 1.5

Real World Measurement PT 2 between YE+1 & YE+2 Rod misses by ~10mm James N. Bellinger 11-May-2009

PG deviations between YE+1 and YE+2 None predict this PG deviations between YE+1 and YE+2 are larger than those from the hand calculation or from Cocoa, but nothing even comes close to predicting the 10mm shift at PT2 James N. Bellinger 11-May-2009