Main objective : Evaluate a new solution to replace SOX +DUC 18W safety lighting (env 2000 units). End of production in 2012 . Developed a test bench.

Slides:



Advertisements
Similar presentations
F AST T RACK REMOTE SWITCH WIRING SET UP FOR THE LIGHT BoardPlug Power strips relay Wiring Harness.
Advertisements

Antonin Vacheret DAPNIA/SPhN, CEA Saclay.HAPPEX II Jlab Hall A Electron detectors for HAPPEX2 and He Installation in HRS Linearity tests 4.
LIGHTING EFFICIENCY Neil Hope Taylor McKenzie. LIGHTING EFFICIENCY the amount of visible light produced for a given energy input.
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Final Year Project Initial Project Presentation
ECE 442 Power Electronics1 Full-Wave Bridge Rectifier.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
Metabolism What is metabolism? What is metabolism? The sum of all chemical reactions occurring in the body. The sum of all chemical reactions occurring.
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Measuring the Current and Voltage of a 820 Ω Resistor Setting for Multimeter = 200 mA DC Measure Voltage in 2 V increments up to 20 V.
The photovoltaic panels Presentation. Contents Goal Principles of operation Needs The technical solutions Characteristics Conclusion.
1. Complete the following circuit diagram to show the two light bulbs in parallel to each other, connected to the 12 V battery. 2. Marty placed a voltmeter.
Switch Mode Power Supplies Use of Transformers for Electrical (DC) Isolation Safety – Isolate output voltages from Electrical Grid Multiple Reference (
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
LHC Emergency Lighting jm FORAY EN/EL/BT Initial project : The current LHC emergency lighting system was designed and installed at the time of the LEP.
Energy from salt and water The 3-rd experiment of the Romanian team.
Repair Sharing Repair process [P8H61][REV 3.0][MIBF00]: No VCORE
Solar energy Jauris llaverias 607. What Is Solar energy? The energy transmitted from the sun in the form of electromagnet radiation ! This energy comes.
Chapter Eight: Work 8.1 Work 8.2 Efficiency and Power.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
You're God of this city You're the King of these people You're the Lord of this nation You are.
Work out the power dissipated by the resistor in the following 2 circuits. All LEDs have a forward voltage of 2v Which circuit is the most efficient and.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Science A Physics – P1 Science A Physics – P1 Topic 2b : Transmission of Electricity Topic 2b : Transmission of Electricity.
Electric Power Power is the rate that work is done or energy is transferred, that is Power = Power is measured in Watts, W.
1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.
Energy transformation. Law of Conservation of Energy.
Introducing.
Friday, March 27 Today's Objectives
Rechargeable Batteries
Arbiter Rating Problem
What’s changed in the last few months?
CUB Outage Schedule April 21, 2006.
Bell Ringer Engine #1 produces twice the power of engine #2. Can we conclude that engine #1 does twice as much work as engine #2?
Aim: Aim: Students will be able to use peer evaluation to effectively revise their essays. Do now: Take out your brainstorming sheet, facts chart, and.
CNRAD dosimetry and Summary of the TS
Chapter Eight: Work 8.1 Work 8.2 Efficiency and Power.
BACK SOLUTION:
Continuous Slot Well Screens.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Payroll Processing pay period end for HR Professionals
Time management School of Rock.
DELTALIGHT LINK 1 REO 3033 W W Description
DELTALIGHT M-T 1 INSERT LED WW Description
Best Hair Extensions In London 1.
Friday 19th November 7.30 pm Prayer for Transformation
مديريت موثر جلسات Running a Meeting that Works
Integration by Parts & Trig Functions
March 1, Math 201 OBJECTIVE: Students will be able to use substitution to evaluate algebraic expressions, including exponents of one, two, or.
500 nm WRITE VOLTAGE 0 V.
Dental Bridges Replacement Teeth
Midterm Solutions Source Transformations
DELTALIGHT NYX B B Description
Chapter Eight: Work 8.1 Work 8.2 Efficiency and Power.
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Preliminary analysis of PS septum 31 failure August 8th, 2008
Managing a Project Life Cycle of a System.
The Freedom We Know.
WEEK 1 Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Games Design Problem identification Analysis of solution
Power Electronics Lecture -11 Single Phase Controlled Rectifier.
DELTALIGHT NOX LED WW G G Description
Friday 15th February - morning


DELTALIGHT TACTIC ANO ANO Description
DELTALIGHT ULTRA S REO 3033 W W Description
Presentation transcript:

Main objective : Evaluate a new solution to replace SOX +DUC 18W safety lighting (env 2000 units). End of production in 2012 . Developed a test bench placed in position 463 aim : - Radiation tests on : Power source : Current transformers Voltage transformers + a Graetz bridge Lighting system : PowerLed technology Standard led technology

First Results shows : Lost of the 1st current transformer : First Results shows : Lost of the 1st current transformer : Friday 18 of march : after 1 hrs of run => ~<0.1Gy Lost of the 2cd current transformer : Friday 18 of march : after 4 hrs of run => ~0.1Gy Lost of the 3thr current transformer : Saturday 19 of march : after 18 hrs of run. => ~0.4Gy Voltage transformers with Graetz bridge still alive No lost of luminescence between two first slots (Luxmeter values) Voltage historic trend Remote Webcam

Done on the 2cd slot : - Exchanged 2 broken current converter with Voltage transformers + Graetz bridge in order to follow the radiation effect on powerled. - Evaluate also a more intense powerled. Currently working… Next : look at the luminescence drift . Remote Webcam