What Records are E-Records? A Process Control System Case Study Jeffrey Beck Manager, Quality Engineering Ortho-McNeil Pharmaceutical, Inc.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Internal Control Concepts Knowledge. Best Practices for IT Governance IT Governance Structure of Relationship Audit Role in IT Governance.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Instructions and forms
Electronic Train Management System and Safety Larry Milhon March 9, 2007.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Deployment of a Margin Model at Comanche Peak Presented.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
ALEJANDRA MEJIA AUGUST 6, 2015 Initial Best Practice Findings from TRM Research.
SCIENTIFIC AND RESEARCH ACTIVITIES IN THE FIELDS OF CRISIS MANAGEMENT AND CIVIL PROTECTION Tomasz Plasota, Bartłomiej Połeć 1 Scientific and Research Centre.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Characteristics of a Good Calculation Program Presented.
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
Control Systems Design Part: FS Slovak University of Technology Faculty of Material Science and Technology in Trnava 2007.
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.
PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.
Project Methodology May 2, System Development Life Cycle Overview.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
What Records are E-Records? A Process Control System Case Study Jeffrey Beck Manager, Quality Engineering Ortho-McNeil Pharmaceutical, Inc.
Joseph Lukhwareni Statistics South Africa Reengineering projects focusing on metadata and the statistical cycle Statistics South Africa, South Africa 3-5.
Regulatory Issues in Laboratory Management
2006 CMBG Conference BREAKOUT 6: Master Equipment List & Data Base Management Facilitator: Tom Czerniewski Entergy June 11-14, 2006 Richmond, VA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
Introduction to Codes, Standards, and Regulations Chattanooga State CC.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Combustion & Industry, Transport, Agriculture & Nature Panels Expert Panels Panels are ad hoc. Currently three ‘sector’ panels: –Combustion and Industry.
2006 CMBG Conference BREAKOUT 2: Electronic Approval & Authorization Including E-Signatures John Parler South Carolina Electric & Gas & Diane Derr PPL.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
Standard Design Process Overview
Electronic Phytosanitary Certification A Presentation by the International Plant Protection Convention Secretariat.
EURISOL, PSI, June 2006E.Wildner, CERN1 Data Bases for Parameter Lists N. Emelianenko, CERN AT-MAS E. Wildner, CERN AT-MAS Presentation is based on a presentation.
CS 330 – Software Engineering What is Software Engineering? Lab 1.
NFPA 805 AND CONFIGURATION MANAGEMENT JIM LECHNER JUNE 7, 2016.
SNC Severe Accident Management NEI Workshop 4/5/12 David Gambrell – Director, Severe Accident Management
CM-101 Configuration Management Fundamentals
Best Practices in Performing DSA Legacy Reviews
Tomasz Plasota, Bartłomiej Połeć
Key Indicator System Overview.
DESIGN BASIS INTEGRATION
KLAUS KDA4 – Solar Irradiance Monitoring Application
Project Name Company Name Presenter Name
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Quality Management Systems (QMS)
Configuration Management Benchmarking Group (www. cmbg
CLINICAL INFORMATION SYSTEM
Document Update Benchmark results
Essbase Data Integrity
Project Name Company Name Presenter Name
INPO Perspective of Industry CM Performance
What is Project Cost Management?
Results of Design Reviews
Margin Management Configuration Management Benchmarking Group
FSAR Configuration Control at PPL Susquehanna, LLC.
Project Name Company Name Presenter Name
Guidance on the New 10CFR50.59 Rule
Jim Powers - Director, Fleet Engineering
TRTR Briefing September 2013
Workshop 1: Processing Facility Configuration Information
Vendor Technical Information
Reference Manual update Item 5.2 of the agenda
Break Out 3: CM and License Renewal
Project Name Company Name Presenter Name
Presentation transcript:

Managing Design and License Basis Info Presented By: Sam Melton

Topics of Interest Definitions Tools/Technology Good Practices Changes/Update/Obsolete Info Ease of retrieval Navigation/Cross Reference Innovations Level of Detail Fidelity to Operation Margin

Definitions Design Basis = Inputs, assumptions and methodology by which requirements are derived. License Basis = Information used by the regulator as basis for license application including the regulator’s statement of approval.

DBDs Per NEI guideline Major Systems Maintained (most places) Relatively few changes NOT a source document (most places)

Tool/Techniques Atlas (First Energy and Cooper) Modeled events Identify critical parameter and equipment Changes flagged to all impacted D.B. Models to procedure level

Tool/Techniques (cont) Duke – Safety Analysis Inputs Manual (Database application internally developed) Dominion – Accident Analysis DBD (Database – internally developed)

Good Practices First Energy Tier 1 Calculations TS setpoint deviation System performance analysis Several more Dominion Created a Technical Publication Group using Adobe FrameMaker Update DBD, FSAR, TRM able to hyperlink references. Benefits of having all documents available electronically.