ELECTRICITY RESTRUCTURING ROUNDTABLE

Slides:



Advertisements
Similar presentations
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
Advertisements

Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
SEPTEMBER 29, 2014 | CONCORD, NH Eric Johnson DIRECTOR, EXTERNAL AFFAIRS New Hampshire Energy Summit Lessons Learned from Winter 2014 and How the ISO Is.
The Changing US Electric Sector Business Model CATEE 2013 Clean Air Through Energy Efficiency Conference San Antonio, Texas December 17, 2013.
The Technical &Economical Impacts of the Upgraded Rehab Power Plant in Jordan Eng. Mamoun Shehadeh Operational Planning Department National Electric Power.
CLEAN ENERGY TO PROMOTE CLEAN AIR & IMPROVE ELECTRICITY PRICE STABILITY Alden Hathaway, ERT Debra Jacobson, GWU Law School April 6, 2006.
Alternative Fuel Survey Results Reliability and Operations Subcommittee Report December 15th, 2004 Presented by ERCOT Client Relations.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Stan Chapman SVP, Marketing & Customer Services Oct 8, 2013.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
Update on the Natural Gas Situation: Terry H. Morlan Northwest Power Planning Council Power Committee Briefing July 16, 2003.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Alternative Fuel Survey Results Technical Advisory Committee Meeting December 2 nd, 2004 Reliability and Operations Subcommittee Report Presented by ERCOT.
Puerto Rico Electric Power
CALIFORNIA ENERGY COMMISSION Outlook for California’s Electricity Supply and Land Use Implications BLM National Lands Conference David Maul Chris Tooker.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Utility Benefits of Demand Response Trevor Lauer DTE Energy Marketing Executive Conference Coeur d’Alene, Idaho.
Preparing for a winter fuel emergency Alaska Journal of Commerce Alaska State Chamber of Commerce.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Reliability and Operations Subcommittee Report on Reliable Fuel Operations in ERCOT Presentation to the ERCOT Technical Advisory Committee February 3,
Aligning the Gas and Electric Markets: EDF Solutions
California Product Offerings
Who Is Southern Power? Stephen Gowland Business Development Manager
CCU Update integrated resource plan May 17, 2016
First in Service First in Value
GSR022: Review of Security and Economy Required Transfer Conditions
Consumer technology is creating the smart home
Benefits of ICAP Reliability Economics
NSPS Rulemakings for Greenhouse Gas Emissions
Affordable Energy Production from Renewable Fuel
LNG: Reliable Gas Supply for the Northeast U.S.
Evolving Economic Dispatch in SPP
MRES Resource Operations in SPP
Massachusetts Department of Environmental Protection
Massachusetts Electric Restructuring Roundtable
Fuel Diversity for Electric Power Generation in New England
Presentation to the MA Electric Restructuring Roundtable
Michael I. Henderson ISO New England Inc.
Overview of Northwest Wind Integration Action Plan
MIT tour of the California ISO Control Center March 31, 2015
Vetting the GENESYS Model
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
City of Lebanon, Missouri Electric Department
Cold Snap Task Force Update
Coal – security of coal supply considerations of EURACOAL
New England Resource Adequacy
Mike Hachey Director, Power Marketing TransCanada Power Marketing Ltd
30 Minute Reserves EPFSTF January 4,
City Council April 30, 2018 Item 13
Regional Climate Alliances Spring 2008
About Dominion: One of America’s Leading Energy Companies
Austin Electricity Conference Austin, Texas April 12, 2018
The Role of Hydro-Québec in New England Electric Markets The New England Electricity Restructuring Roundtable June 14, 2013 Stephen Molodetz, Vice.
New England Roundtable
Update on the Western Region Resource Plan
Wholesale Electricity Costs
Jim Mcintosh Director, Executive Operations Advisor California ISO
Commissioner Anne C. George
The Risks to Coal Plants in Coming Years
Winter Reliability Program Updated
Antelope Valley-East Kern Water Agency
FUTURE NATURAL GAS POWER PRODUCTION RELIABILITY AND
Restructuring Roundtable
Presentation transcript:

ELECTRICITY RESTRUCTURING ROUNDTABLE Resolving Dual-Fuel Capability & Environmental Permitting Issues Edward Kunce Deputy Commissioner Mass DEP 9 December 2005

FROM MASS DEP's PERSPECTIVE UNCONTROLABLE FACTORS IN CONTINGENCY PLANNING NATURE Gulf Coast hurricane damage Winter 2005/2006 ECONOMICS Relative costs of gas vs. oil ISO’s dispatching and bidding processes Fuel purchasing strategies INFRASTRUCTURE AND OPERATIONS Ability to deliver fuel driving “cold snaps” Facility limitations for fuel oil, e.g. storage capacity O&M factors with fuel switching Satisfying demand of other fuel oil users LAS VEGAS Differing/Contradictory projections on Fuel Shortfalls “which one you betting on??

MANY "SPECIES" OF GAS FIRED POWER PLANTS Gas only Permitted for dual fuel but only use gas Permitted for dual fuel and use both fuels (primary gas, 30(+)days oil)

FRAMEWORK FOR MASS DEP's CONTINGENCY STRATEGY DUAL FUEL POWER PLANTS FRAMEWORK FOR MASS DEP's CONTINGENCY STRATEGY Balance economic and environmental risks Work within existing regulatory framework as much as possible Build off historic fuel oil use patterns

DUAL FUEL POWER PLANTS UNDER REVIEW Pittsfield Power 173 MW Dartmouth Power 67 MW Mass Power, Springfield 270 MW NEA Bellingham 327 MW W Springfield GT 94 MW Mirant Kendell (*) 168 MW Total 1099 MW (*) began compliance testing to burn oil Nov. 05

FUEL OIL USE AT DUAL FUEL POWER PLANTS Facility DAYS ALLOWED IN PERMIT MAX USED LAST 4 YEARS Pittsfield 55.2 4.6 (8%) Dartmouth 62.5 19.0 (30%) Springfield 35.0 4.2 (12%) Bellingham 30.0 3.0 (10%) W. Springfield 39.0 N/A

MASS DEP's PROPOSED STRATEGY Meet with dual fuel power plant representatives Clarify flexibility in existing permits & regs. Review past fuel oil use Review infrastructure limitations/issues Review expected fuel oil use this year Attempt to get agreements on voluntary “set-aside” Plan for a number of “cold snap shortfalls” Facilities “set-aside” some of permitted days for “cold snap shortfalls” Be prepared for emergency regulations if Items 1&2 aren’t adequate

DATA TO SUPPORT "SET-ASIDE" STRATEGY FACILITY DAYS ALLOWED MAX USED LAST 4 YEARS SET-ASIDE (1) BALANCE (2) Pittsfield 55.2 4.6 (8%) 4.5 (8%) 46.1 (84%) Dartmouth 62.5 19.0 (30%) 4.5 (7%) 26.3 (7%%) Springfield 35.0 4.2 (12%) 4.5 (13%) 26.3 (75%) Bellingham 30.0 3.0 (10%) 4.5 (15%) 22.5 (75%) W. Springfield 39.0 N/A 4.5 (12%) Assumes three “cold snaps” during the winter that last an average of three days each and that these cold snaps coincide with NG shortfalls that would require dual fuel facilities to burn oil or shut down. These facilities would serve as peaking facilities for about 12 hours each “cold snap” day. (This results in 4.5 days set aside for cold snaps) 2. “Balance” represents operating flexibility within existing permits for oil use assuming a baseline use established by max use of last four years plus “cold snap” set-aside.