Beam Delivery System Schedule at ILC2010

Slides:



Advertisements
Similar presentations
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Advertisements

BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Proposed machine parameters Andrei Seryi July 23, 2010.
BDS at reduced beam parameters 2nd Baseline Assessment Workshop on Reduced Beam Parameter set Andrei Seryi John Adams Institute 19 January 2011.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Optimization of L(E) with SB2009 Andrei Seryi, for BDS and other working groups LCWS 2010 / ILC 2010 March 28, 2010.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Beam Delivery system design and plans Andrei Seryi SLAC on behalf of BDS design team ILC08 and LCWS08 17 November 2008 Illustration of beam dump with double.
Introdcution to Workpackage/Activity Reflection D. Schulte.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Beam delivery and ATF2 Andrei Seryi SLAC October 1, 2008.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
Beam Delivery System Summary Andrei Seryi LCWS 2010 / ILC 2010 March 30, 2010.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
Baseline Technical Review – Central Region Accelerator Systems
Near IR FF design including FD and longer L* issues
Introduction and Meeting Objectives
Effect of changes for running at lower energies following the Physics Questions Committee’s Status Report provided to the SB2009 Working Group of Detector.
DOE/NSF FY08 Americas Regional Team Review
For discussion of Final Focus and IR of plasma-based collider
ILC Interaction Region and Machine Detector Interface
Testbeam plans for LEP instrumentation
Beam Delivery update Andrei Seryi December 12, 2005
CLIC Study Aim Conceptual design report in 2010
CLIC-ILC BDS & MDI work.
Future Collider Projects at CERN
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
CLIC/ILC Collaboration Meeting: Objectives & Organization
ILC-10 / LCWS-10 Joint Plenary GDE Summary
Updates on IR and FF for super-B factory
Andrei Seryi, SLAC for the Beam Delivery team TILC09 April 19, 2009
Extract from today’s talk given to DCB
BDS civil construction Single IR upgrade scenarios discussion
Andrei Seryi Materials for discussion TILC-08
ILC Cryogenics -- Technical Design Report Planning
Central Region Working Group
Barry Barish Paris ICHEP 24-July-10
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Presentation transcript:

Beam Delivery System Schedule at ILC2010 Andrei Seryi LCWS 2010 / ILC 2010 March 26, 2010

Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible new baseline Work on a prototype of the final focus at ATF2 Work on design of key technical systems of BDS

Focus of efforts and sessions Work on parameter set for a possible new baseline Joint plenary on parameters & scope Saturday morning SB2009 details and implications on physics (Higgs mass, stau search, etc) Joint with MDI, Sun 1100-1230 Discussion of implication of double rep rate (10Hz) at lower energy (e.g. 250GeV CM) for SB2009 Sat 1600-1800 – joint with DR and Sources Sun 1700-1800 – joint with Linac, HLRF & Cryogenics experts

Focus of efforts and sessions Work on final focus prototype ATF2 ATF/ATF2 ICB (International Collaboration Board) Progress report, TB (Technical Board) report ICB closed session Joint with DR, Monday 1100-1230 ATF2 detailed technical discussions Sun 1400-1530 SC FD upgrade design for ATF2 Sat 1100-1230

Focus of efforts and sessions Work on design of key technical systems of BDS Machine detector interface design of Concepts Joint with MDI, Sunday 0900-1030 IR stability and vibrations Joint with MDI, Monday 0900-1030 SC FD design and prototype progress Saturday 1100-1230 MDI diagnostics and backgrounds Joint with MDI, Monday 1400-1530 Beam dump design update

Beam Delivery & MDI items IR Integration Optimize IR ensuring the needed detector performance & efficient push-pull operation Agree on division of responsibilities for space, parameters and devices 1TeV CM, single IR, two detectors, push-pull grid: 100m*1m Beam Switch Yard Diagnostics polarimeter Sacrificial collimators Collimation: b, E E-spectrometer Final Focus Tune-up & emergency Extraction 14mr IR Tune-up dump Muon wall Main dump Extraction with downstream diagnostics Final Doublet