Pressure Piping Analysis

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Advertisements

SOLENOID LOW POWER COLD TEST
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
BasicRefrigerationSystem 4 Component Flow Diagram.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Overview of the ESS Linac Cryogenic Distribution System
LCLS-II Cryogenic Distribution System CDS Surface Components PDR Jerry Makara December 16, 2014.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Technical Procurement Plan
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Final Design Cryogenic and mechanical configurations
LCLS-II Technical Requirements
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
2K Cold Box Structural Analysis
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Process Requirements and Design Approach
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
2K Cold Box PDR Introduction
FRIB Cryogenic Support
Cryoplant Installation Overview
Electrical and Controls
Mechanical Design and Analysis of LCLS II 2 K Cold Box
2K CB Internal Piping Flexibility Analysis
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Overview of Mechanical Design
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Status of the cryogenic system for B180
Question 1) Are two ports current leads?
Cryostat design Mechanical design: Thermal screens: Specifications:
Instrumentation and Controls
Testing/Commissioning of 2 K Cold Box
2K CB FDR Overview:  Agenda, Charge, Review Process
SC1R Cold Box PDR Mechanical Design
2K Cold Box Process Design
2K Cold Box Mechanical Design
2K CB FDR Conclusion:  Project Summary, Procurement Plan / Status
2K Cold Box Internal Piping Flexibility Analysis
2K Cold Box Cost, Schedule & FDR Summary
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
Scope, Requirements Deliverables & Schedule
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
LERF Readiness Review Ed Daly / Matt Marchlik
CTF Users’ Perspective
CRYOMODULE FINAL ASSEMBLY
ESR2 Process Cycle Design
SC1R Cold Box PDR Assembly Sequence
CRYOMODULE FINAL ASSEMBLY
ESR2 Process Cycle Design
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

Pressure Piping Analysis Nate Laverdure LCLS-II 2 K Cold Box FDR March 9, 2017

Volumes within the piping pressure system Outline Pressure systems Volumes within the piping pressure system Limiting components Safety relief valves Component pressure ratings JLab pressure systems documentation LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure systems of the 2K Cold Box 79222-PS-101 CP1 2K Cold Box Shell LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure systems of the 2K Cold Box 79222-PS-102 CP1 2K Cold Box Compressors LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure systems of the 2K Cold Box 79222-PS-104 CP1 2K Cold Box Vacuum Sys LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure systems of the 2K Cold Box 79222-PS-103 CP1 2K Cold Box Piping LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure systems of the 2K Cold Box Pressure system no. Title Classification 79222-PS-101 CP1 2K Cold Box Shell Category 2 vacuum system with volume greater than 35 ft3 79222-PS-102 CP1 2K Cold Box Compressors Pressure piping 79222-PS-103 CP1 2K Cold Box Piping Various 79222-PS-104 CP1 2K Cold Box Vacuum System with volume less than 35 ft3 LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Design pressure rating Classification Process relief Cold compressor suction Full vacuum to 45 psig ASME B31.3 category Normal RV41722 within 79420-PS-001 CP1 Interface Box Cold compressor return Full vacuum to 75 psig RV22190 within 79221-PS-109 CP1 4.5K Lower Cold Box Piping 4K vapor make-up RV31030 within 79720-PS-101 CP1 LHe Dewar Thermal reliefs for these volumes are described in 79222-P0001 2K Cold Box Relief Valves. LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Design pressure rating Classification Process relief Helium cleanup/ recovery return Full vacuum to 150 psig ASME B31.3 category Normal RV71010 within 79120-PS-111 CP1 Helium Supply/ Recovery/Clean-up Piping 3 atm purge helium supply ASME B31.3 category D RV11025 Instrument air 150 psig RV82060 within 79622-PS-103 CP1 Instrument Air Piping LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Design pressure rating Classification Process relief Cooling water supply and return 100 psig ASME B31.3 category D RV23402 within 79621-PS-103 CP1 Turbine/CC Cooling Water Piping Guard vacuum Full vacuum to <15 psig Category 2 vacuum system with volume less than 35 ft3 RV84020 within 79821-PS-101 CP1 Guard Vacuum Piping Relief valve discharge collector RV41712 LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes LCLS-II 2 K CBX FDR, Mar 9, 2017

Component pressure ratings 3-1/8” bayonets 12.4 bara [1] 5-3/16” bayonets 6.2 bara [1] 9-1/4” bayonets 5.1 bara [1] CC cartridge 47 bara [2] CC housing 4.1 bard [2] Cryogenic valves > 10 bara [1] LCLSII-4.8-EN-0791-R0, Jlab bayonet gate valves [2] LCLS-II cold compressor technical proposal, ALAT LCLS-II 2 K CBX FDR, Mar 9, 2017

Component pressure ratings – bayonets LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure system documentation LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure system documentation LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure system documentation LCLS-II 2 K CBX FDR, Mar 9, 2017

Documentation Document No. Title Author Status LCLSII-4.8-EN-0791-R0 Engineering Note: JLab Bayonet Gate Valves C Kaufmann Released LCLS-II 2 K CBX FDR, Mar 9, 2017

Summary Pressure system documentation including calculations are commensurate with FDR LCLS-II 2 K CBX FDR, Mar 9, 2017

Pressure Piping Analysis Nate Laverdure LCLS-II 2 K Cold Box FDR March 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41500 Pressure limiting component 3-1/8” bayonet Spool drawing 79222-0075 LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41510 Pressure limiting component Flex hose 79222-0124-01 Spool drawing Several LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41520 Pressure limiting component Cold compressor CC1 housing Spool drawing Several LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41530 Pressure limiting component Cold compressors CC2 – CC5 housing Spool drawing Several LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41540 Pressure limiting component Cold compressor CC6 housing Spool drawing Several LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41550 Pressure limiting component 5-3/16” bayonet Spool drawing Several LCLS-II 2 K CBX FDR, Mar 9, 2017

79222-PS-103 CP1 2K Cold Box Piping volumes Pressure rating Classification Dewar 4K Supply Bayonet & PV41500 Full vacuum to 75 psig ASME B31.3 category Normal Process pipe volume between the control valves CC1 suction bayonet & CC1 discharge bayonet Full vacuum to 45 psig CC2 suction bayonet & CC5 discharge bayonet CC6 suction bayonet & PV41160 CC6 bypass bayonet and control valves PV41170 & 30 K return to 4K CBX bayonet Relief RV41560 Pressure limiting component 5-3/16” bayonet Spool drawing Several LCLS-II 2 K CBX FDR, Mar 9, 2017