Class III Estimate for Regional Consolidation

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
T ROOPER W. S MITH, P.E. F REESE AND N ICHOLS, I NC J OLLYVILLE R D., B LDG 4, S UITE 100 A USTIN, TX MINIMIZE YOUR FOOTPRINT AND YOUR MAINTENANCE.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Hydraulic Optimization of the Northern Water Supply System Presentation by: Tom Charles, P.E., DEE Jim Kriss, P.E. Jennifer Wendrowski, E.I.T. September.
Rainwater Conservation System Town of Cary Senior Center Facility.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Water System Planning Study
Interlocal Cooperation for a Sustainable and Secure Water Supply Don Greeley Regional Managers Meeting April 8 th, 2014.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Joint WRAP Update Meeting III January 26, WELCOME… Thank you for joining us Please sign in Tonight’s topic… How we plan to meet the County’s future.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Proposals to Change Water and Sewer Rates & Rate Structure Presented to: Avon Lake Board of Municipal Utilities Presented by: Todd Danielson December 23,
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Reclaimed Water Solution for Disposal Capacity Village of Bald Head Island 2015 NC AWWA - WEA Annual Conference November 17, 2015.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Decentralization = New Supply? The North Bay Watershed Association’s Satellite Treatment Plant Study.
Public Information Meeting Wastewater Treatment January 26, 2016.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Update on RCR Permitting
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
WATER SYSTEM WORKSHOP February 27, 2012
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
Recycled Water Project Basis of Design Report
Richland Creek Water Supply Program Briefing
View display boards and speak one-on-one with staff
Capital Plan Update and Five-Year CIP
Water & Wastewater Capacity Charge Work Shop
Kings Bluff Raw Water System Parallel Raw Water Main Project
Recycled Water Project – Sharon Heights GCC
Sewer User Rate Increase PUBLIC HEARING
Finance Advisory Committee – October 17, 2017
Redundancy and Emergency Interconnectivity (REI) Plan
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
Delta Water Supply Project
Brackish Water Desalination Project Draft EIR
City of Sunrise Wastewater Reuse Program
Presentation transcript:

Class III Estimate for Regional Consolidation Shelby Class III Estimate for Regional Consolidation Riverbend Water Resource District

Phasing Diagram Shelby Industrial Raw Water Demand 10 MGD by 2026 Raw Water Capacity 30 by 2031 13 MGD - lowest immediate demand Industrial Use 40 by 2036 50 15MGD reuse treatment 60   Member cities transfer 1A 2026 30 MGD multi-level takeoff New Boston 1B DeKalb I Clarksville 2A 2031 60 MGD intake tunnel (3+1) X 10 MGD = 30 MGD High Service Pumping (3+1) X 8.3 MGD 2B 2036 3A 2045 Raw Water Supply Line - 60 MGD 8.3 MGD WTP Treatment Train Upgrade 3B 2055 (2) X 10 MGD = 20 MGD X MGD Ground Storage WTP to Riverbend TieIn Raw Water Flow to WTP Riverbend WTP to Redwater Alt 4B (1) X 10 MGD = 10 MGD ? +2X10 Redwater Elevated tank 20 Flow Split Box Annona to Clarksville Existing 30 inch line repair/replace (3+1) X 10 MGD = 30MGD City of Annona 205,000 gal +1X10 City of Avery 218,000 City of De Kalb 238,000 Central Bowie County 320,000 City of New Boston 698,000 (3+0) X 10 MGD = 30MGD TAC 200,000 1,230,000 10 MGD WTP Treatment Train 3,585,000 1,100,000 City of Redwater (Phase II) 15,300,000 City of Redwater 12,500,000 Potable Water Production Capacity 53,000 25 upgrade to 27 +/- 30 +/- Expand by 2045 (?) X ? MGD = ? MGD To IP 2.5 MGD WTP Treatment Train Domino Existing IP Intake and PS Queen City Atlanta Shelby

Phasing Diagram Shelby

Phase 1A and 1B (of modified alternative 3): Raw water backbone to 60MGD Raw water capacity at 30 MGD (10 MGD industrial/20 MGD water production) 25 MGD water production capacity Distribution – TAC and New Boston Shelby Top Keys to Success" as 1. Listening 2. Hydraulics 3. Anticipating Operating Challenges 4. Long term view but short term solutions KEEP Circling back

Phase 1A and 1B (of modified alternative 3): Opinion of Probable Construction Cost, O&M Cost and Annual Expense Phase 1A&1B combined Phase 1A and 1B (of modified alternative 3): Raw water backbone to 60MGD Raw water capacity at 30 MGD (10 MGD industrial/20 MGD water production) 25 MGD water production capacity Distribution – TAC and New Boston Matt Wilson Creek LS? DRAFT COSTS

Phase 4B –Potable Water supply 2.5 MGD water production capacity Opinion of Probable Construction Cost, O&M Cost and Annual Expense Phase 4B Phase 4B –Potable Water supply 2.5 MGD water production capacity Raw water sidestream off IP raw water pump station Pre-chlorination by IP Distribution – serving Atlanta, Domino, and Queen City Matt Wilson Creek LS? DRAFT COSTS

Replacing New Boston Rd. Capacity Buildout Replacing New Boston Rd. Capacity Domestic potable Water - New Boston TAC Industrial Demands Ultimately serving: Redwater, DeKalb, Central Bowie Co., Annona, Avery, Clarksville Matt A Listening – PIC, PM, Design Staff – Listen and understand Client needs Anticipating Operating Challenges – Translates to knowing challenges Hydraulic flexibility Long term view We need to include comments on Subs value

Buildout Phase 2A Phase 1A/1B Phase 1A Phase 2B Phase 1B Phase 4B Matt A Listening – PIC, PM, Design Staff – Listen and understand Client needs Anticipating Operating Challenges – Translates to knowing challenges Hydraulic flexibility Long term view We need to include comments on Subs value Phase 4B

Opinion of Probable Construction Cost - All Phases Construction Cost $124.3M, without distribution Raw Water System supply to 120 MGD Potable water production to 40 MGD Cass County potable water production to 2.5 MGD Industrial Reuse for 15 MGD Potable water distribution for region Matt Wilson Creek LS? Construction Cost $12.5M, without distribution Total Capital Costs include: Engineering, Feasibility Studies, Finance, Legal and Bond Counsel. As well, these estimated costs include Power Connection, Land Acquisition and Survey, and interest during construction. DRAFT COSTS

Capital Cost – O&M Cost – Debt Service Operating and Maintenance Costs Matt Wilson Creek LS? DRAFT COSTS