Nikhef/Bonn LepCol meeting

Slides:



Advertisements
Similar presentations
Record block or bite block
Advertisements

The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Scanning apparatus. Final tune ups Repeatability: move in a given steps and see if we can get the same amounts. Calibration: mainly to convert any given.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Micromegas TPC Large.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Hybrid Integrated Circuit
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
LHCb Vertex Detector and Beetle Chip
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
RD50 CCE measurements and annealing studies on proton irradiated p-type MCz diodes Herbert Hoedlmosera, Michael Molla, Michael Koehlerb, Henri Nordlundc.
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
Walker Chan Sharon Chou Huy Nguyen
Developing Radiation Hard Silicon for the Vertex Locator
Tracking detectors/2 F.Riggi.
Status of the InGrid detector for 2016
Update on Pavia MM mechanical prototype
Potential and Current Control
Nikhef/Bonn LepCol meeting
Hybrid Issues.
Electron-beam lithography with the Raith EBPG
RPC built a new plastic (peek doped with CB)
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
status of the second field cage
Simulated vertex precision
Nikhef/Bonn LepCol meeting
Gluing jigs for Demonstrator
Development of µHV miniature HV supplies
TPC Field Cage Progress Report
Experience from ZEUS Microvertex detector is running for more than five years without access! E.N Koffeman NIKHEF & University of Amsterdam.
first light! new laser driver board (revD)
Electron-beam lithography with the Raith EBPG
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
LHCb VErtex LOcator ENGINEERING DEPARTMENT
Vertex Detector Overview Prototypes R&D Plans Summary.
TPC chamber for Medipix2/TimePix
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
m -> eg Drift Chambers
SuperKEKb X-Ray Monitor
ME instrument and in-orbit performance
The LHCb VErtex LOcator
Pixel module assembly tooling
Nikhef/Bonn LepCol meeting
What if you use a capillary, small specimen or transmission technique
Presentation transcript:

Nikhef/Bonn LepCol meeting - Alignment - Manipulation InGrid chips - Field cage single chip module Fred Hartjes NIKHEF Nikhef/Bonn LepCol meeting April 10, 2017

Alignment tooling mostly completed

Vacuum system in preparation One channel operational Waiting for vacuum buffers Leakage problems due to design errors with alignment block Cannot be easily cured New pickup block has to be made

Picking chips with InGrid from the box Manual picking hard Some rubbing of the vacuum tool on the InGrid surface cannot be avoided => damage of the InGrid surface Tool using small XYZ stage in preparation

Previous field cage for single chip detector Made from Semitron ESD 490 HR Gives field deformations due to inhomogeneity of the material

New field cage for single chip detector Field shaping foil with metal strips to be placed inside Strip pitch 1 mm Network from 17 resistors 470 MΩ => ~50 nA leakage current @ 200 V/cm To be mounted in existing Semitron field cage May be verified with N2 laser