SR 400 Express Lanes: Market Sounding

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

P3 Georgia’s Public Private Partnership Program
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Cost Estimation System Tool
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
Environmental Assessment Public Meeting
1. Virginia’s Public-Private Transportation Act (PPTA) Northern Border Finance Workshop December 11, 2006 Thomas W. Pelnik III, P.E. Director, Innovative.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
SCDOT’s Strategic Direction Janet Oakley Secretary of Transportation South Carolina Alliance to Fix Our Roads September 22, 2014 Janet Oakley Secretary.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Regional Border Economic Development Forum September 3, 2005.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Application of SHRP2 Decision Support Tool to SR 509 Corridor Planning The 14th TRB National Transportation Planning Applications Conference May 8, 2013.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1. Concession Agreements The Focus Georgia Conference Thomas W. Pelnik III, P.E. Director, Innovative Project Delivery Division April 26, 2007.
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
Overview of PPI’s in Georgia April 26, 2006 Earl Mahfuz, Treasurer.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Office of Major Project Development (OMPD) Overview November 2015.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Statewide Mobility Performance Measures Team Purpose Consensus on approach and measures.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Four Winds Condominium Association August 2, 2017
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Mobility Choice Blueprint
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Georgia DOT: Moving Forward with Safety on Our Minds
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Tampa Hillsborough Expressway Authority Industry Forum 6/15/2018.
Florida Transportation Commission FY 2009
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
Mr. Greg Slater, Administrator
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
FUTURE CAPACITY BUILDING NEEDS dISCUSSION
The Oregon Approach to Innovation in Infrastructure
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
ACEC Bobby Lewis August 2017.
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
August 28, 2018 Darryl VanMeter, P.E. Assistant P3 Division Director
DESIGN-BUILD PROGRAM OVERVIEW
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
East Selmon Capacity Project PD&E Study Industry Forum
I Street Bridge Replacement Project
Presentation transcript:

SR 400 Express Lanes: Market Sounding February 27, 2018 K. Joe Carpenter, Jr., P.E. Director of P3 Georgia Department of Transportation Photo: SR 400 N at Abernathy Hello and brief introduction. Today I would like to share information on the SR 400 Express Lanes Project which is a part of GDOT’s Major Mobility Investment Program (MMIP).

MMIP Projects 11 major mobility projects under contract in 10 years (by 2026) $11 billion program Improve passenger and freight movement Use innovative delivery and public-private partnerships to accelerate projects The state Transportation Funding Act of 2015, or TFA, added approximately $1B a year to address our state’s transportation needs. A major part of the promise to Georgia taxpayers was to commit $11 billion dollars to get 11 new major projects into construction by 2026. One of those project is SR 400 Express Lanes.

SR 400 Express Lanes Two Express Lanes in each direction along SR 400 between I-285 and McGinnis Ferry Rd One Express Lane in each direction from McGinnis Ferry Road to McFarland Road Anticipate DBFOM – availability payments Est. Cost: $1.8 Billion Suggested highlights… 2 Express Lanes in each direction. Very northern section will be 1 Express Lane in each direction. The corridor is approximately 18 miles long. Fund source is a mix of State and Federal. DBFOM with availability payments. No concession. Other things to highlight… An adjacent project just to the south is I-285 Top End Express Lanes which too will be DBFOM using Availability Payments for the payback. GDOT is administering Transform 285/400 which is scheduled to be complete in 2020. We are currently working Logical Termini between SR 400 and I-285 Top End which we believe will be Spalding Drive. A GEC team (AECOM) is developing concept, NEPA document and costing plans. HNTB is serving as Program Manager. EY has been providing financial advisor services.

Typical Cross Section SR 400 Shoulder Shoulder Existing Shoulder ETL ETL ETL ETL Shoulder The existing SR 400 cross section is shown at the top. The proposed SR 400 cross section… widening existing to the outside with the new Express Lanes on existing concrete pavement in the median separated from the GP lanes by delineators. The original concrete pavement constructed in early 1970s and widened in stages starting in 1989 from its original four lane configuration to its current configuration of 8 lanes. Proposed

SR 400 Express Lanes Schedule High level overview of the schedule. Environmental document is the critical path to meeting Dec 2020 letting. Department is working to acquire ROW early. Schedule subject to change

SR 400 Express Lanes Schedule Highlights Public Notice Advertisement/Industry Forum – Spring 2019 Issue Draft RFP – Jan/Feb 2020 Project Letting – December 2020 Open to Tolling – Fall 2024 To highlight a few schedule milestones.

SR 400 Express Lanes Activities Current Activities Operational study to define express lane access points Traffic analysis Local/agency stakeholder coordination Environmental field work Next Steps Environmental phase Early ROW acquisition Existing asset condition surveys Traffic Report Costing Plans Procurement Documents The SR 400 Express Lanes is now in early activities with the GEC for pre-let support.

SR 400 Express Lane Miles Existing New Total Express Lane 48 15 62 General Purpose Lane 69 44 113 Ramp 17 9 26 Cross Street 8 142 67 209 Majority of completed express lanes and general purpose lanes will be supported on existing (old) concrete pavement Asphalt Concrete Structure Total Express Lane 61 1 62 General Purpose Lane 110 2 113 Ramp 5 21 26 Cross Street 4 8 9 192 209 I show this slide to highlight the existing SR 400 assets within this corridor. The Department understands the risk associated with including these existing assets into a DBFOM contract.

Initiate Procurement/Develop DBFOM RFP Documents Industry and Owner Outreach Develop O&M Estimates Define Operational Constraints Evaluate Existing Assets Extent of Operational Services by Developer Responsibility for Non-Toll ITS Maintenance Performance versus prescriptive Specifications Fence to Fence versus restricted O&M Limits Life-Cycle Risk for Existing Assets DB Technical Requirements and OVT for DBFOM Develop O&M Risk Register Alignment with Goals Preserve Asset Value Value for Money Reliability Customer Service Seamless User Experience Traveler Safety Worker Safety Accurate Reporting Contracts Enforced Optimized Technology Key Decisions Core Activities Consultees Office of Traffic Operations Office of Maintenance District Offices SRTA Office of Materials and Testing IT / Network Group Bridges Construction Optimize programmatic / Project-specific Outcomes Initiate Procurement/Develop DBFOM RFP Documents FHWA There is a lot in this slide. I show it to highlight that the Division of P3 is actively engaged with key GDOT offices (Traffic Ops, Maintenance, District Maintenance), State Road and Tollway Authority (SRTA), EY, and others to evaluate the various risks and opportunities associated with delivering this corridor using DBFOM. In addition, we met with a small group of AMOTIA members last year, I have been on the road communicating the program to gather feedback. And with that I turn it over to questions.

Questions?

MMIP Program Information @GeorgiaDOT @GADeptofTrans @gadeptoftrans www.dot.ga.gov/MMIP